Movatterモバイル変換


[0]ホーム

URL:


Skip to main content

This website uses cookies

We use cookies on this site to enhance the user experience. You can follow the link provided here to tailor your experience, or accept all and continue on this page.

Set cookie preferences

Your cookie preferences were saved

Change cookie preferences
Link to 'Swansea' homepage
  1. My account
  2. Login
  3. Cymraeg
    Toggle mobile menu visibility
    1. Swansea Home
    2. Council
    3. News
    4. 2023 press releases
    5. October 2023 press releases

    Work starts on River Tawe pontoon

    Work has started to install a boating pontoon at a key site of Swansea regeneration.

    Pontoon Work Starts

    Pontoon Work Starts

    Contractors working on behalf of the council have started putting in place the new structure at a Landore riverbank location on the Tawe.

    It's taking shape on the river's western bank, around 1.5 miles upstream from the Tawe Barrage and next to the former Hafod Morfa Copperworks site which is being transformed as part of the council's ongoing £1bn city regeneration.

    Once complete, the pontoon - which has planning permission - will be available for use by groups that already use the river, including Copper Jack cruises, the City of Swansea Rowing Club and Swansea University Rowing Club.

    Work is due to be complete this month. It will include new railings and gates, as well as energy-efficient LED lighting - all of which have already been installed.

    The pontoon project's funding included support from the European Maritime and Fisheries Fund, which is funded by the European Union and Welsh Government (main pontoon and lighting) and from the Welsh Government's Small Scale Coastal Infrastructure Scheme (stainless steel gates and railings).

    Main contractors are pontoon specialists Inland and Coastal Marina Systems.

    Council cabinet memberRobert Francis-Davies said: "The Tawe was at the heart of Swansea life for many years; it will be again in future as we breathe more life into the river corridor for the benefit of local people and visitors."

    The pontoon will sit alongside an existing river walk and a disused historic quay wall. Quayside and pontoon will be linked by a bridgehead platform and footbridge.

    The pontoon and quayside will have safety equipment, signs and wall ladders. New life buoys will be installed along with lockable gates for key holders.

    The structure - mainly in steel and concrete, and with buoyancy units - will rise and fall with river levels.

    A home for otters has been installed on the river as part of the scheme.

    Image: The new pontoon starting to take shape.Pic: Inland and Coastal Marina Systems

    Choose Language

    Croeso!

    Dewiswch eich dewis iaith.

    Welcome!

    Please select your preferred language.

    CymraegEnglish
    Close Choose Language

    Share this page

    Facebook iconTwitter iconEmail icon

    Print

    Print icon
    Last modified on 20 October 2023

    Is this page useful?

    NoReport a problem with this page

    [8]ページ先頭

    ©2009-2025 Movatter.jp