NASA's 'critical path' to the moon no longer requires a Lunar Gateway: Report
But this isn't the end for the moon-orbiting space station.
When you purchase through links on our site, we may earn an affiliate commission.Here’s how it works.

Breaking space news, the latest updates on rocket launches, skywatching events and more!
You are now subscribed
Your newsletter sign-up was successful
Want to add more newsletters?

Delivered daily
Daily Newsletter
Breaking space news, the latest updates on rocket launches, skywatching events and more!

Once a month
Watch This Space
Sign up to our monthly entertainment newsletter to keep up with all our coverage of the latest sci-fi and space movies, tv shows, games and books.

Once a week
Night Sky This Week
Discover this week's must-see night sky events, moon phases, and stunning astrophotos. Sign up for our skywatching newsletter and explore the universe with us!

Twice a month
Strange New Words
Space.com's Sci-Fi Reader's Club. Read a sci-fi short story every month and join a virtual community of fellow science fiction fans!
NASAhas removed theLunar Gateway from its "critical path" to return humans to the moon by 2024, according to aSpaceNews report. But the agency has assured that it isn't casting aside its plan for a moon-orbiting space station.
With new changes to the agency's plan to return astronauts to the moon with theArtemis program, NASA has removed the Gateway, a mini-space station that would facilitate crewed lunar landings, from its plan in favor of simpler solutions, Doug Loverro, the head of NASA's human spaceflight directorate, said Friday (March 13) at a meeting of the NASA Advisory Council's Science Committee,SpaceNews reported.
Before the meeting, NASA announced that it had selected the first two science experiments to be flown aboard the Gateway. Loverro said that with these changes to the program, the station could accommodate science payloads because it was no longer on a "critical path" for a 2024 crewed lunar landing.
You may like ISS astronaut evacuation shouldn't interfere with upcoming Artemis 2 moon mission, NASA chief says
SpaceX Starship timeline delays astronaut moon landing for NASA's Artemis 3 mission to 2028: Report
A city on the moon: Why SpaceX shifted its focus away from Mars
Related: Can NASA Really Put Astronauts on the Moon in 2024?
SpaceNews reported that, at the meeting, Loverro said that he aims to "de-risk" Artemis and simplify the program by focusing only on activities necessary to achieve the lunar landing.
"What are we going to do to go ahead and make that happen? And the answer is you've got to go ahead and remove all the things that add to program risk along the way,"SpaceNews quoted Loverro as saying.
"If it's not mandatory, it's not necessary," he added.
Breaking space news, the latest updates on rocket launches, skywatching events and more!
According to the SpaceNews report, Loverro went on to say that things that "add to program risk" include activities that have never been accomplished before in space.
"What are all of the risks that can get in our way in a four-and-a-half-year schedule and how do we go ahead and pull them all early into program, or eliminate them from the program altogether by going ahead and making wise technical or programmatic choices?" he said,according to SpaceNews.
These reasons propelled NASA to take Gateway off of the critical path" for the planned lunar landing. Additionally, Loverro said that it was likely that the Gateway would fall behind schedule. And so, "I can guarantee you we do not need it for this launch," SpaceNews quoted Loverro as saying.
You may like ISS astronaut evacuation shouldn't interfere with upcoming Artemis 2 moon mission, NASA chief says
SpaceX Starship timeline delays astronaut moon landing for NASA's Artemis 3 mission to 2028: Report
A city on the moon: Why SpaceX shifted its focus away from Mars
Now while Gateway is no longer a part of this path, NASA is not abandoning the Lunar Gateway, according to the SpaceNews report.
"By taking Gateway out of the critical path for the lunar landing in ’24, I believe what we have done is create a far better Gateway program," Loverro said,according to SpaceNews. "Frankly, had we not done that simplification, I was going to have to cancel Gateway because I couldn't afford it … by simplifying it and taking it out of the critical path, I can now keep it on track."
While Gateway might "add to program risk" for NASA's 2024 lunar goal, it will still be helpful and necessary for future, more "sustainable," lunar missions, Loverro said.
- NASA Plans to Build a Moon-Orbiting Space Station
- In Photos: President Trump Aims for the Moon with Space Policy Directive 1
- Home on the Moon: How to Build a Lunar Colony (Infographic)
Follow Chelsea Gohd on Twitter@chelsea_gohd. Follow us on Twitter@Spacedotcom and onFacebook.
OFFER: Save at least 56% with our latest magazine deal!
All About Space magazine takes you on an awe-inspiring journey through our solar system and beyond, from the amazing technology and spacecraft that enables humanity to venture into orbit, to the complexities of space science.

Chelsea “Foxanne” Gohd joined Space.com in 2018 and is now a Senior Writer, writing about everything from climate change to planetary science and human spaceflight in both articles and on-camera in videos. With a degree in Public Health and biological sciences, Chelsea has written and worked for institutions including the American Museum of Natural History, Scientific American, Discover Magazine Blog, Astronomy Magazine and Live Science. When not writing, editing or filming something space-y, Chelsea "Foxanne" Gohd is writing music and performing as Foxanne, evenlaunching a song to space in 2021 with Inspiration4. You can follow her on Twitter @chelsea_gohd and@foxannemusic.
























