Movatterモバイル変換


[0]ホーム

URL:


We found items in the Archives

Format

Category

Time

Collections

previous
    next

    RTÉ Radio Centre Under Construction1969

    • Facebook
    • Twitter
    • Whatsapp
    • Email

    On 6 June 1969 work began on the construction of a new radio centre on the RTÉ campus at Donnybrook.

    From 1928 Radio Éireann was based in the GPO on O'Connell Street in Dublin. Construction of the new radio centre was completed in 1971 and a phased move from the GPO got underway. The first live broadcast was made from thenew radio centre in September 1973.

    All the studios in the radio centre were built underground which enabled greater soundproofing. The centre accommodates twelve radio studios and an orchestral recording studio. The architect for the building was Ronnie Tallon.

    The accompanying clip shows footage of the work getting underway on the site and was broadcast in an RTÉ News report on 9 June 1969.

    Work begins on a new radio centre for RTÉ
    Work begins on a new radio centre for RTÉ
    Work begins on a new radio centre for RTÉ. Photos by Des Gaffney.

    MORE LIKE THIS ITEM

    ARCHIVES DAILY: TOP 10


    [8]ページ先頭

    ©2009-2025 Movatter.jp