Railway Performance
Who we are
- System Operator
- Our history
- The George Stephenson notebook
- The Network Rail archive
- Eminent engineers
- Iconic infrastructure
- The history of Box Tunnel, Wiltshire
- The history of the Britannia Bridge, North Wales
- The history of the Forth Bridge, Fife
- The history of the High Level Bridge, Newcastle
- The history of the Royal Border Bridge, Berwick
- The history of the Tay Bridge, Dundee
- The history of Bristol Temple Meads station
- The history of Birmingham New Street station
- The history of Charing Cross station
- The history of London Euston station
- The history of London King’s Cross station
- The history of London Bridge station
- The history of Leeds station
- The history of London Liverpool Street station
- The history of Manchester Piccadilly station
- The history of London Paddington station
- The history of London St Pancras International station
- The history of London Victoria station
- The history of London Waterloo station
- The history of the Maidenhead Bridge
- The history of Glasgow Central station
- The history of Edinburgh Waverley station
- The history of London Cannon Street station
- Working with railway heritage
- Where to find railway records
- Railway 200
- Publications and resources
- Transparency and ethics
- Our approach to safety
- Equity, diversity and inclusion
- How we work
From Monday 1 April 2019, the UK Rail industry introduced a new, more detailed and precise set of measures to better understand how timely our trains are – from station to station, and from minute to minute.
The measures reflect that good performance needs to be delivered throughout the whole journey and that every minute matters for passengers.
The figures below illustrate these new measures using data from the most recent period – quantifying how punctually trains are reaching stations, from ‘early’ through to ‘30 minutes after’ the timetable.
More detailed data, including historic punctuality figures, can be found on the Office of Rail and Road (ORR) website.
Term Definitions
Last 4 weeks: 12 October 2025 – 8 November 2025
Number of recorded stations stops – 6,644,158
Passenger Trains Planned – 543,931
New industry measure – train punctuality at station stops 2025/26 (period 8)

Last 12 Months –10 November 2024 – 8 November 2025
Number of recorded stations stops – 84,635,993
Passenger Trains Planned – 7,393,677
New industry measure – train punctuality at station stops – MAA as at 2025/26 (period 8)

Download On Time data for period 8 (xlsx 16 KB)
Delay responsibility
This chart below shows who was responsible for passenger train delays of 3 minutes or more.
For regulatory reasons, Network Rail is assigned responsibility for delays caused by external factors such as weather, trespass, vandalism, cable theft and fatalities.
Please note, due to the way this data is rounded the total delay responsibility figure can sometimes total 99.9%. This is a system generated figure so cannot be altered.

Download delay responsibility data for period 8 (xlsx 18KB)
Term definitions
Full details of the delay attribution rules can be found on theDelay Attribution Board’s page.
To find out more about what can cause delays on the network please visit ourDelays explained page.