Devizes Gateway feasibility study
Our work
- GSM-R: the railway’s mobile communication system
- Our regions
- Digital Railway
- Long-term planning
- Looking after the railway
- Asset management
- Asset Protection and Optimisation
- Bridges, tunnels and viaducts
- Delays explained
- Earthworks: cutting slopes and embankments
- Level crossings
- Our fleet: machines and vehicles
- Planned works
- Litter and fly-tipping
- Responding to weather impacts on the railway
- Signalling
- Track
- Vegetation management
- Our routes
- Anglia route
- About the Anglia route
- Improving the railway in Anglia
- Keeping our communities safe in Anglia
- East Coast route
- East Midlands route
- North & East route
- West Coast South route
- North West route
- Central route
- Kent route
- South East upgrade
- Hither Green station Access for All improvements
- Peckham Rye station upgrade
- Shortlands station Access for All improvements
- Blackheath Tunnel Upgrade
- Hungerford Railway Bridge Refurbishment
- Lewisham resignalling
- Landslip prevention works at Chislet
- Upgrading the sea defences at Folkestone Warren
- Renewing the lifts at Sevenoaks station
- Petts Wood station footbridge refurbishment
- Hastings to Tunbridge Wells, and Hastings to Bexhill line closure
- Bexley station subway
- Dartford Junction: Line closure between Dartford and Gravesend
- South East upgrade
- Sussex route
- Network Rail High Speed
- Scotland route
- Wales route
- Wessex route
- Wessex railway upgrade plan
- Heart of Wessex line upgrades
- Feltham and Wokingham re-signalling programme
- Portsmouth Direct Upgrade
- Wessex Access for All schemes
- Improving London Waterloo station
- West of England line improvements
- Island Line Improvements
- North Downs Line signalling upgrade
- Portsmouth and Portcreek area improvement work
- Staines to Windsor improvement work
- Barnes to Feltham via Hounslow Upgrades
- Berrylands Station Upgrade
- London Waterloo and Clapham Junction line closures
- Reading improvement works
- Bournemouth to Dorchester South Line Renewals
- New Malden to Twickenham Renewals
- Western route
- South West Rail Resilience Programme
- Oxfordshire Connect
- Tackley Level Crossing
- Bristol Rail Regeneration
- Dartmoor Line
- MetroWest rail upgrades
- Old Oak Common lineside logistics compound
- Devizes Gateway feasibility study
- HS2 Old Oak Common Station
- Mid Cornwall Metro
- The Portishead Line
- Gloucester signal box upgrade
- Langport bridge
- Frome Railway Bridge
- Autumn drainage work in Somerset
- Anglia route
- Train operating companies
- Living by the railway
- Railway Upgrade Plan
Wider rail investment programme for Wiltshire would be needed to make case for new station
We have released the results of a feasibility study for the Department for Transport (DfT) into a new railway station for Devizes.

Background
Wiltshire Council, Devizes Development Partnership and GWR worked closely with us to undertake the study, which concluded that the strongest case for a new rail station at Devizes would be as part of a wider rail improvement programme for Wiltshire.
The feasibility study built on the strategic outline business case submitted to the DfT under the Restoring Your Railway Fund programme in November 2021, promoted by Wiltshire Council with support from DDP, which proposed a Devizes Gateway station at Lydeway.
The detailed work undertaken to date has identified that a new standalone station at Devizes is unlikely to represent value for money, but that it could come forward as part of a wider rail improvement programme for the county.
The results of the Devizes Gateway interim feasibility study have now been submitted to the DfT who will make a decision as to whether the project will progress to the next stage of development.
Next steps
Further joint work between the rail industry, Wiltshire Council and its local partners is already under way to look at what potential new services could be introduced across Wiltshire, and the infrastructure and trains that would be needed to make this viable.
Feasibility study
This document may not be suitable for users of assistive technology. If you need this in an alternative format pleasecontact us.
Get in touch
If you have any questions please call our dedicated 24-hour National Helpline on 03457 11 41 41 or visit our contact us page.