Welcome to the beta version of the CTBTO multilingual site. If you encounter any issues or have feedback, please email us at[email protected]
The Comprehensive Nuclear-Test-Ban Treaty (CTBT) prohibits all nuclear explosions, whether they are conducted for military or non-military purposes, no matter how high or low their yield.
To monitor compliance, its unique verification regime is designed to detect any nuclear explosion conducted anywhere – underground, under water or in the atmosphere.
The regime consists of three main components.
The high-technologyInternational Monitoring System (IMS), which spans the globe with more than 300 facilities using four state-of-the-art technologies to detect any sign of a possible nuclear test.
IMSseismic stations monitor shockwaves through the ground; itshydroacoustic stations detect sound waves in the oceans;infrasound stations listen for ultra-low-frequency sound waves inaudible to the human ear; andradionuclide stations monitor the atmosphere for radioactive particles and gases from a nuclear explosion.
In addition to these 321 monitoring stations, 16 radionuclide laboratories help to identify radioactive substances.
Around 90 percent of the 337 IMS facilities designated by the Treaty are already up and running and the system has proven its effectiveness, detecting all of North Korea’s declared nuclear tests as well as a plethora of natural and non-natural phenomena.
IMS data also yieldadditional benefits that can help save lives and expand scientific knowledge, from supporting faster public tsunami warnings to tracking radioactive releases from a nuclear accident. Researchers can access selected data to better understand the natural world, from whale behaviour to climate change or the timing of monsoon rains.
TheInternational Data Centre (IDC) collects and analyses data to share with Member States.
Based at the CTBTO’s headquarters in Vienna, the IDC receives data 24/7 from the global IMS network of monitoring stations, and distributes it to Member States in both raw and analysed form.
A highly complex automatic process screens the mass of available data for relevant events, identifying factors such as their location and size. IDC experts review these results to ensure reliable and comprehensive information is provided to Member States, conducting further analysis as needed.
Member States received information about the location, magnitude, time and depth of North Korea’s declared nuclear tests within just two hours.
The ability to conductOn-Site Inspections (OSI) once the CTBT enters into force, to look for evidence on the ground.
On-site inspections are considered the final verification measure.
After entry into force, any Member State will be able to request an on-site inspection if IMS data indicate a suspected breach of the Treaty. An international team of inspectors can then be dispatched to collect further facts to verify whether a nuclear test has taken place.
These three components are currently addressed respectively by the IMS, IDC and OSI Divisions of the CTBTOProvisional Technical Secretariat.
The CTBT verification regime also includes the following mechanisms:
Our Mission
Our Work
News and Events
Resources
Work With Us