![]() Concourse | |||||||||||
General information | |||||||||||
Location | Intersection of Xiaoying Road West (小营西路) and Zhufangbei 1st Street (朱房北一街) Qinghe Subdistrict,Haidian District,Beijing China | ||||||||||
Coordinates | 40°02′04″N116°19′29″E / 40.03457°N 116.32467°E /40.03457; 116.32467 | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Changping line | ||||||||||
Platforms | 2 (1island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 15, 2024; 4 months ago (2024-12-15) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Zhufangbei station[1] (Chinese:朱房北站;pinyin:Zhūfángběi zhàn) is asubway station on theChangping line of theBeijing Subway. As this is an infill station, it did not open with the rest of the line in its initial extension phase.[2] Instead, it opened on December 15, 2024.[3]
The wall of the paid area of the concourse is decorated with a public artwork called "Neighborhood".[4]
There are 3 exits, lettered A, C and D. Exits A and D have accessible elevators.[5] Due to the land occupation of the Golden Collar Era Office Building, the long-term implementation conditions will be reserved for Exit B.[6]
During planning in March 2019, the project name for this station was called Xiaoyingxilu station.[7] On July 19, 2021, in the naming plan for the stations on the southern section of the Changping Line announced by the Beijing Municipal Commission of Planning and Natural Resources, the station name was adjusted to Zhufangbei station.[8] In June 2022, the station was officially named Zhufangbei station.[9]
On February 4, 2023, the southern extension of Changping line fromQinghe railway station toXitucheng commenced operations, but the station's construction was not finished, so trains passed the station without stopping.[2]
On May 8, 2024, the unit project passed the site acceptance.[10][11] On September 25, the initial fire inspection failed. On November 26, the station passed the fire inspection.[12] On December 15, the station commenced operations.[3]
昌平线南延北起清河站,南至西土城站,线路全长10.6公里,设车站6座:朱房北站(暂缓开通)、清河小营桥站、学知园站、六道口站、学院桥站、西土城站
{{cite news}}
: CS1 maint: multiple names: authors list (link)In May this year, Zhufang North Station (formerly Xiaoyingxilu Station) passed the acceptance