Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Yerevan Metro

From Wikipedia, the free encyclopedia
Metro system in Yerevan, Armenia

Karen Demirchyan Yerevan Subway
Republiq Square Metro Station Fountains
Overview
Native nameԿարեն Դեմիրճյանի անվան Երևանի մետրոպոլիտեն
OwnerGovernment of Armenia,Yerevan Municipality
LocaleYerevan,Armenia
Transit typeRapid transit
Number of lines1[1](1 more planned)
Number of stations10[1] (total 8 more planned - 2 of them under construction)
Daily ridership81.000(2023)[2]
Annual ridership29.6 million[2]
Chief executiveBabken Sedrakyan (acting)
Websitehttp://www.yermetro.am/
Operation
Began operation7 March 1981; 44 years ago[1]
Operator(s)Karen Demirchyan Yerevan Subway CJSC
Number of vehicles70 (1-3 Carriages per Trainset)
Technical
System length13.4 km (8.3 mi)[1]
Track gauge1,524 mm (5 ft)
Electrification825 VDCthird rail
Top speed80 km/h (50 mph)
System map

Nazarbekyan
Ajapnyak
Barekamutyun
Marshal Baghramyan
Yeritasardakan
Republic Square
General Andranik
David of Sasun
Sasuntsi Davit depot
Gortsaranain
Shengavit
Garegin Nzhdeh Square
Charbakh depot
Charbakh
This diagram:
Map of the Yerevan Metro

TheKaren Demirchyan Yerevan Subway (Armenian:Կարեն Դեմիրճյանի անվան Երևանի մետրոպոլիտեն,Karen Demirchyani anvan Yerevani metropoliten; since December 1999), colloquially known as theYerevan Metro (Armenian:Երևանի մետրո), is arapid transit system that serves the capital ofArmenia,Yerevan. Opened on 7 March 1981, it was theeighth metro system in theformerSoviet Union. Owned by the government, it is operated by the Karen Demirchyan Yerevan Subway CJSC of theMinistry of Transport and Communication.

Unlike most former Soviet rapid transit systems, its stations are not very deep: there are two stations above ground, one sub-surface, and the remaining stations are considered deep-level. However, these stations are quite shallow, averaging a depth of only 16–22 metres (52–72 ft) below the surface. Only three stations are deeper than 30 metres (98 ft): Marshal Baghramyan (approximately 37.5 metres (123 ft)), Barekamutyun (approximately 42 metres (138 ft)) and Yeritasardakan (approximately 37 metres (121 ft)). Stations are intricately decorated with national motifs. The metro runs along 13.4 kilometres (8.3 mi)[citation needed] of track, and currently serves ten active stations.

History

[edit]
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.
Find sources: "Yerevan Metro" – news ·newspapers ·books ·scholar ·JSTOR
(March 2023) (Learn how and when to remove this message)

Yerevan, the capital of Armenia, experienced substantial growth during the postwar period when it was the capital of theArmenian SSR. Due to the city's very uneven landscape, only an underground system could meet all of the criteria to efficiently move large numbers of people around the city. The first plans for a rapid transit system began to be formed in the late 1960s, under the auspices ofAnton Kochinyan, then the first secretary of the Communist Party of Armenia. Initially, this was centred on a rapid tram system, rather than a full underground metro system. During this time, the Soviet City Engineering Planning Department clearly stated that a metro system would only be awarded to cities with more than a population of one million, which Yerevan lacked at the start of construction (1972). Nevertheless, all of the tunnels in which the tram lines were to be installed were built to a design that would have allowed a potential conversion into a full underground metro system.

By the end of 1978 over 4 kilometres (2+12 mi) of tunnels were already bored through, when the plans were redesigned so that the system would be opened as a full underground metro (although to avoid extra bureaucratic measures the system continued to be officially called a "rapid tram" right up until its opening).

On 7 March 1981, the system was opened, becoming the eighth Soviet metro system, with the first four-station stage of 7.6 kilometres (4.7 mi). Since then, the system has grown to a 13.4 kilometres (8.3 mi),[1] ten-station network.

Theengineering work was of such high quality that during the1988 Armenian earthquake the metro managed to withstand the earthquake which paralyzed the whole republic and continued to operate the next day with only minor damage. However, this did put an end to most of the extension projects as finances were diverted to the reconstruction of the destroyed infrastructure elsewhere in Yerevan andArmenia.

On 28 December 1999, the metro was named afterKaren Demirchyan, the man who was responsible for changing the status of the rapid tram system into becoming a metro system, after he was killed two months earlier in aterrorist attack on the Armenian parliament.

Timeline

[edit]
LineSegmentDate opened
1BarekamutyunDavid of Sasun8 March 1981
1David of SasunGortsaranayin11 July 1983
1GortsaranayinShengavit26 December 1985
1ShengavitGaregin Nzhdeh Square4 January 1987
1ShengavitCharbakh26 December 1996

Name changes

[edit]

Following the dissolution of the USSR and the independence of Armenia, three stations saw their names changed in 1992. A fourth station had been renamed ten years before, to honourIvan Khristoforovich Bagramyan, a Soviet military commander of Armenian origin, after his death.

Yerevan Metro train
StationPrevious name(s)Years
Marshal BaghramyanSaralanj1981–1982
Republic SquareLenin Square1981–1992
Garegin Nzhdeh SquareSpandaryan Square1987–1992
General AndranikHoktemberyan1989–1992

Facts and numbers

[edit]
The entrance to theRepublic Square metro station
Inside theRepublic Square metro station

Today the metro operates as a single line, with a separate shuttle service on the Shengavit-Charbakh branch, and covers 13.4 kilometres (8.3 mi),[1] with trains running every five minutes from 7:00 a.m. to 00:00 a.m. It served about 60,000 passengers per day before a fare increase,[3] In 2012, 14.9 million passengers rode the metro.[4] but ridership fell by almost 20% to 50,000 passengers per day after the doubling of the fare.[5] The system employs about 1,200 workers. A distinct feature of the metro is that the digital timers/clockscount up, i.e. they reset to "00:00" when a train departs, and keep counting up until the next train leaves. Passengers must be aware that trains, in general, arrive/depart every 5 minutes or so.

Due to Yerevan's uneven landscape, the metro in some cases goes above ground. Of the ten stations; seven are underground of which one is a single-vault shallow level, and the rest are pylon deep-level stations. Continuing the tradition of all ex-Soviet underground systems, most of the stations are exquisitely decorated, often blending Armenian national motifs with late-Soviet architecture.

When the system opened it initially had no depot, and service bays in the reversal sidings were used to make minor repairs instead. The proper depotCharbakh was opened in 1985 as part of the second extension. In the early 1990s, the metro system had a total of 70 cars (all of themMetrovagonmash 81-717/81-714 models) forming approximately 12 three-carriage trains. However, since then the intermediate carriages were sold to the Moscow and Saint-Petersburg systems in return for overhaul repairs on the driving cars (which Charbakh has no facility or apparatus to perform).

In 2000–2001, for economic reasons, all of the intermediate 81-714 carriages stopped operating and the system currently has only 13 81-717 two-carriage trains running, (12 on the main line, one on the shuttle service).The annual budget for Yerevan Metro in 2002 was 1 billion 440 milliondrams (about $2.5 million). Of this amount, about 800 million drams were financed by the State. The rest of the budget was allocated from ticket costs, trade and advertisement. A ride on the Yerevan Metro currently costs 100 drams (about 25 cents).[3]

In 2012–201481-717 carriages were refurbished. After the refurbishment trains were given the exterior and interior similar to the81-71M trains inPrague.

The modernization was carried out by the Tbilisi ZREPS, the same factory that modernizes Tbilisi cars, and modernized them into the type 81-717M.

Plans

[edit]
The entrance to theGaregin Nzhdeh Square metro station

Despite the optimism of the growing city (which did reach one million in 1986), today the Metro is underfunded and does not form the main transport artery of the city. It has had practically no extensions since 1989 (albeit a small shuttle service to a single-platform station in Charbakh). In the city budget, which is still having to make provisions for the repair of the damage done in the horrendous 1988 earthquake, the metro lacks priority. The next extension will be to theAchapnyak andNazarbekyan stations (the construction of which has been frozen since the early 1990s).

Moreover, since the Metro did not manage to connect the important residential districts before the earthquake and the economic crises that took place following the nation's declaration of independence, minibus routes have taken over as the backbone of Yerevan's urban transport, often doubling the Metro routes. In 2004, the annual ridership numbers were 12.1 million. This trend, however, has reversed in recent years as the city's congested road arteries have encouraged commuters to see the metro as a quick, clean and affordable transit alternative.[6] As of 2016, the annual ridership of the metro had increased to 15.4 million annual passengers. By 2017, the annual ridership increased to 16.2 million passengers.[7] By 2019, ridership further increased to 20.2 million annual passengers.[8]

Although the current building progress is distant, there are plans for a second and third line to eventually open, forming a typical Soviet triangle design layout of six radii, intersecting in the city centre. It was reported in March 2013 that city officials were approaching banks to seek loans for an expansion of the Yerevan Metro system.[1] In 2018, Armen Gularyan the deputy chairman of Armenia's Urban Development Committee discussed the possibility of constructing another subway station on the already existing line. This proposed stop, between the Sasuntsi David and Andranik stations, would offer direct access to the Surmalu and Petak shopping malls. It is unclear whether this proposal will be included in the new metro extension plan.[6]

On 15 May 2019, the chief architect of Yerevan confirmed that plans are now underway to begin the expansion of the Yerevan metro. He expressed hope that the design works of the new subway station in theAjapnyak District will be completed shortly and that construction works will launch in early 2020.[9] Also in 2019, theMayor of Yerevan Hayk Marutyan announced that the preliminary stages have begun to extend the metro northward toDavtashen District.[10]

Renovation

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(May 2018)

The Yerevan Metro was thoroughly renovated for the first time since its founding 30 years ago, with funds of about $41 million allotted by theEuropean Union. A drainage system construction, one of the preconditions for the underground's security will be done first. Additionally, with the assistance of theEuropean Bank for Reconstruction and Development, tunnels were upgraded, metro cars were renovated and new logistical equipment was installed.[6] The renovation was fully finished by 2012.[5]

Tokens

[edit]

Rather than tickets, passengers are sold tokens, which are then used to operateturnstiles to reach station platforms. The orange plastic tokens issued since 2009 depict the metro's logo on one side and the city'sstatue ofDavid of Sassoun on the other.

Tokens of Yerevan Metro
  • Tokens issued up to 2009
    Tokens issued up to 2009
  • Plastic token issued in May 2018, showing the line's logo
    Plastic token issued in May 2018, showing the line's logo
  • Plastic token issued in May 2018, showing the statue of David of Sassoun
    Plastic token issued in May 2018, showing the statue ofDavid of Sassoun

Network map

[edit]

Map

See also

[edit]

References

[edit]
  1. ^abcdefg"Yerevan authorities negotiating new metro line projects with banks".ArmeniaNow.com. 27 March 2013. Archived fromthe original on 21 February 2013. Retrieved4 August 2013.
  2. ^ab"Քաղաքապետարանը հայտնել է, որ Երևանի մետրոն կհամալրեն մեկ շարժակազմով" (in Armenian). Armenia Today.
  3. ^ab"Union of consumers: Doubled fare for Yerevan Metro will reduce number of passengers".ArmeniaNow.com. 22 June 2011. Archived fromthe original on 12 November 2013. Retrieved4 August 2013.
  4. ^"Социально-экономическое положение Республики Армения в январе-декабре 2012г. Транспорт"(PDF) (in Russian). Retrieved4 August 2013.
  5. ^ab"Investing deep: Yerevan Metro gets continued assistance from European donors".ArmeniaNow.com. 5 December 2012. Archived fromthe original on 21 February 2013. Retrieved4 August 2013.
  6. ^abcElliott, Raffi (26 February 2019)."Yerevan Gearing Up for Subway Extension".The Armenian Weekly. Retrieved19 June 2019.
  7. ^"ОСНОВНЫЕ ТЕХНИКО-ЭКСПЛУАТАЦИОННЫЕ : ХАРАКТЕРИСТИКИ МЕТРОПОЛИТЕНОВ ЗА 2017 ГОД"(PDF).Asmetro.ru. Retrieved9 March 2022.
  8. ^Основные технико-эксплуатационные характеристики метрополитенов за 2019 год [Main technical and operational specifications for Subways in Year 2019](PDF) (in Russian). Международная Ассоциация "Метро" [International Association of Metros]. Retrieved25 August 2020.
  9. ^"Chief Architect of Yerevan hopes to launch construction works of new subway station in early 2020".armenpress.am. Retrieved19 June 2019.
  10. ^"Yerevan Gearing Up for Subway Extension".The Armenian Weekly. 26 February 2019. Retrieved29 July 2019.

External links

[edit]
Wikivoyage has a travel guide forYerevan.
Yerevan landmarks
Historical sites and
notable landmarks
Nature andparks
Entertainment
and recreation
Culture and art
Museums
Education
Science
and technology
Sport
Transportation
Squares, streets
and bridges
Government
Precincts
Line 1
Charbakh branch
Rapid transit in Europe
Italics: under construction.
 Bangladesh
 China (PRC)
 India
 Indonesia
 Iran
 Japan
 Kazakhstan
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Yerevan_Metro&oldid=1274131455"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp