West Wales lines

Route map:
From Wikipedia, the free encyclopedia
Railway lines west of Swansea, Wales

West Wales lines
AClass 153 unit inHeart of Wales line livery crosses the viaduct nearTenby railway station c.2007.
Overview
OwnerNetwork Rail
LocaleWales
Swansea
Carmarthenshire
Pembrokeshire
Service
TypeHeavy Rail
SystemNational Rail
History
Opened1868
Technical
Number of tracksDouble track Swansea to Clarbeston Road (remainder single line)
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
Route map
Map of the West Wales lines.
West Wales lines
Landore Junction
Swansea
Swansea Loop West Jn
Cockett Tunnel
Cockett
Gowerton
Loughor
Llanelli
Pembrey and Burry Port
Burry Port
Lando Platform
Kidwelly Flats Halt
Kidwelly
Ferryside
Carmarthen
Carmarthen Junction
(original)
Sarnau
St Clears
Whitland Tunnel
Whitland
Narberth
Narberth Tunnel
Clunderwen
Templeton
Kilgetty
Clarbeston Road
Saundersfoot
Haverfordwest
Tenby
Penally
Johnston
Lydstep Halt
Neyland
Manorbier
Waterston oil refinery
Beaver's Hill Halt
Robeston oil refinery
Lamphey
Milford Haven
Golden Hill Platform
Llanion Halt
Hakin Docks
Pembroke
Spittal Tunnel
Pembroke Dockferry/water interchange
Wolf's Castle Halt
Welsh Hook Halt
Mathry Road Halt
Jordanston Halt
Fishguard
and Goodwick
ferry/water interchangeFishguard Harbour

TheWest Wales lines (Welsh:Llinellau Gorllewin Cymru) are a group of railway lines fromSwansea throughCarmarthenshire toPembrokeshire,West Wales. The main part runs from Swansea toCarmarthen andWhitland, where it becomes three branches toFishguard,Milford Haven andPembroke Dock.

Before the rail cuts of the 1960s, there were routes to Cardigan, Newcastle Emlyn, Llandysul, and via Lampeter, cross-country from Carmarthen to Aberystwyth.

History

[edit]

The railway to west Wales was first projected in 1844, and the proposal was for a line to run from theGreat Western Railway nearGloucester to Fishguard, with a branch from Whitland to Pembroke. The railway was called the South Wales Railway, and although it was in theory independent of the GWR, in practice it was very closely linked. This was shown by the fact thatIsambard Kingdom Brunel was the engineer, and the line was laid to the7 ft (2,134 mm)broad gauge.

Construction began in 1847, but the company ran into financial difficulties. In addition, theGreat Famine of Ireland reduced the prospective revenue from Anglo-Irish traffic. As a result, instead of completing the line to the proposed port at Fishguard, the Haverfordwest branch was extended toNeyland where the harbour would cost less.

The line from Swansea opened as far as Carmarthen on 11 October 1852, Haverfordwest on 2 January 1854, and to its terminus at Neyland on 15 April 1856. At first, the railway was leased to the GWR, but in 1863 the two companies were amalgamated.

The original powers for the branch to Pembroke lapsed, and so in 1859 thePembroke and Tenby Railway was authorised to build a4 ft 8+12 in (1,435 mm),standard gauge line from Pembroke Dock to Tenby. The line opened from Tenby to Pembroke on 30 July 1863 and to Pembroke Dock on 8 August 1864. The extension from Tenby to the GWR line at Whitland opened on 4 September 1866. There were two adjoining stations at Whitland with no physical connection between the two lines because they operated ondifferent gauges.[1]

The line was engineered bySir James Szlumper.[2] It had its own police force until 1897, due to the high-security of the Naval Dockyard at Pembroke Dock, and the munitions transported.[3]

The Pembroke & Tenby Company obtained powers in 1866 to extend their standard-gauge line from Whitland to Carmarthen. This would have enabled the Pembroke & Tenby to link up with the standard-gauge network through theLlanelly Railway, theVale of Towy Railway and theCentral Wales line. Through a series of inter-company working agreements, this would have had the effect of giving theLondon & North Western Railway unrestricted access to west Wales. Within the Act for the extension to Carmarthen was a Schedule which allowed either party (the Pembroke & Tenby or the Great Western) to request the Great Western for running powers to the Pembroke company. In doing this the cost of adding a rail tomix the gauge and installing the necessary junctions at Whitland and Carmarthen was £20,000 to be paid to the Great Western within 18 months of the request. The request was made by the Pembroke company and consequently the Great Westernconverted the up line to standard gauge leaving the down line purely as broad. This was not what the Pembroke company was wanting but had to live with it. The Great Western maintained a crossing loop at St Clears for the broad gauge and this caused some hindrance to the Pembroke company. The conversion is noted as the first pure broad to standard gauge for the Great Western.

The Pembroke & Tenby ran the first goods trains to Carmarthen on 1 June 1868, and passenger services in August 1869. The G.W.R began leasing the line on 1 July 1896 before finally amalgamated it a year later.[1]

In 1895, the Rosebush line was opened fromClynderwen toLetterston along the old Maenclochog line, and construction started on extending it to Goodwick and the proposed new harbour at Fishguard. A Bill was approved by Parliament for the railway to extend eastwards to Carmarthen, although this was stopped when the line was bought out by theGreat Western Railway in 1898. In 1906, the railway was extended from Letterston toFishguard & Goodwick followed in 1909 withFishguard Harbour.

The Rosebush line was closed duringWorld War I because its rails were shipped to theWestern Front in 1917 for use by the British Army. In 1923 the line was relaid. However, passenger services ceased in 1937. The entire line was closed in 1949.

Passenger services stopped on theWhitland and Cardigan branch in 1962, followed by freight in 1963. The line toNeyland followed in 1964. Pembrokeshire escaped lightly from the 1963Beeching cuts as none of the remaining three branches – to Fishguard, Milford Haven, and Pembroke Dock via Tenby – were proposed for closure. The Pembroke Dock branch survived a later closure proposal in the late 1960s.

The first freight line to the Oil Refineries was built in 1960 when Esso opened their first refinery in Milford Haven.

Current services

[edit]
First Great Western high speed service atCarmarthen.

Until 2013, train services on the West Wales line were compromised by the existence of a stretch of single track on the otherwise double-track main line. This 5 miles (8 km) stretch of single track is between Cockett West Junction in the western suburbs of Swansea and Duffryn West Junction to the east of Llanelli. Within this section the River Loughor was crossed on a viaduct which required significant works to accommodate two tracks.[4] Plans were advanced to replace the viaduct and restore double track, and this was completed in April 2013.[5]

One intermediate station, Gowerton, also lies on this single-track stretch, with just the former Down (westbound) platform in use for trains in either direction. The disused former Up platform (without track) is still in existence. Less than half of all trains passing through Gowerton can be scheduled to make stops owing to pathing limitations. Additionally, this tight pathing compromised route performance which can amplify delays and hence impact connections into and out of the long-distance Intercity services between Swansea, Cardiff and London. This is important since there are many interchange passengers from the Pembroke Dock line (which is mainly served by trains terminating at Swansea) for Cardiff and English destinations.

The double tracking work between Cockett and Dyffryn was completed by July 2013 with a revamped Gowerton railway station having the disused platform brought back into use. This resulted in Gowerton railway station having an additional 95 trains stopping there every week.[6] Additional problems are also found on the Single Lead Junction at Swansea Loop East junction (north ofSwansea station), which causes conflict between trains from west of Swansea and the eastbound mainline High Speed Train services. There are two passenger companies operating;Transport for Wales Rail andGreat Western Railway.

Great Western Railway introduced a new timetable in 2023, significantly increasing the service on the West Wales line. Their change added 65 trains every week on the line,[7] extending services which previously started or terminated at Swansea to call at Llanelli, Pembrey & Burry Port and Carmarthen.

Transport for Wales,Iarnród Éireann andStena Line promotesSailRail[8] using theFishguard Harbour toRosslare Europort service which links with theIarnród Éireann trains toDublin Connolly on theDublin–Rosslare railway line.

Route

[edit]

The cities, towns and villages served by the route are listed below. Towns initalics are served by InterCity express services.

Swansea to Whitland

[edit]

Pembroke Dock branch

[edit]

All stations on this line are served by at least one of the two Intercity services that run down this line on Summer Saturdays.

Whitland to Clarbeston Road

[edit]

Milford Haven branch

[edit]

Fishguard branch

[edit]

Services

[edit]

Great Western Railway

[edit]
Regular services
Class 175 DMU en route forCarmarthen

In May 2023, Great Western Railway added extra services for the first time since their reduction in the late 1990s.[7] They now operate the following services:

Summer period
  • Additional daily services are provided betweenPembroke Dock andLondon Paddington. Two services run from Pembroke Dock to Paddington, one runs from Paddington to Pembroke Dock with a fourth service which runs between Swansea and Pembroke Dock only.
Cancelled services

The following services previously operated by Great Western Railway (and/or one or both of its predecessors First Great Western, Great Western Trains, British Rail and Great Western Railway) no longer operate:

Transport for Wales

[edit]

Transport for Wales have proposed operating additional services to Tenby, from Swansea, in the Summer of 2025.

Most services are timed to provide a connection atSwansea to Great Western Railway services toLondon Paddington

Other services

[edit]

Freight

[edit]

The junction on the Fishguard branch to the former North Pembrokeshire and Fishguard Railway, which now leads to the formerRNAD Trecwn site, has been refurbished.

  • One of the oil refineries near Milford Haven generates daily long-distance freight trains.
  • The Tata Trostre tinplate works generates some freight traffic

Developments & upgrades

[edit]
The former wooden Loughor Rail Viaduct was replaced by a concrete/steel structure in 2013.

In August 2006,SWWITCH performed a case review of the Fishguard branch to decide whether it was economically viable to continue to operate a passenger service to the harbour given the very scant (boat-trains only) service. In 2011, a local campaign resulted in extra service being launched. A year later it was announced that the closedFishguard and Goodwick railway station would reopen.[12][13]

In December 2008 theWelsh Assembly announced it had secured funding from theEuropean Fund for Strategic Investments to upgrade sections of the line between Gowerton andLoughor.[14] The work, which was completed by 8 July 2013, included the replacement of the woodenLoughor Rail Viaduct with a concrete/steel structure across theRiver Loughor, the subsequent redoubling of the line betweenSwansea andLlanelli and the reopening on the old platform atGowerton railway station.[15] The improvement work has allowed more trains to stop atGowerton while decreasing overall travel times, and an increase in the frequency of services between Swansea and Llanelli. In 2015,Network Rail made the proposal to reopenCockett in its annual Strategic Business Plan.[16]

In 2018 community campaigning began to improve services and facilities atPembroke Dock.[17]

See also

[edit]

References

[edit]
  1. ^ab"Railway Magazine", October 1959
  2. ^"Build a Free Website with Web Hosting - Tripod".lycos.co.uk. Retrieved27 November 2015.
  3. ^"British Transport Police".www.btp.police.uk. Retrieved23 June 2019.
  4. ^"Network Rail - Page not found"(PDF).networkrail.co.uk. Retrieved27 November 2015.{{cite web}}:Cite uses generic title (help)
  5. ^"Rail Plans for West Wales Unveiled". Network Rail. 12 December 2011. Archived fromthe original on 29 June 2012.
  6. ^"Revamped Gowerton train station is on track to fine future".South Wales Evening Post. Retrieved27 November 2015.
  7. ^ab"65 extra trains every week in south Wales as GWR introduces new May timetable".GWR News. 18 May 2023. Retrieved21 April 2024.
  8. ^"SailRail". Irishrail.ie. Archived fromthe original on 8 February 2014. Retrieved16 April 2015.
  9. ^abParker, Richard (2008).The Railways of Pembrokeshire. Noodle Books.ISBN 978-1-906419-07-3.
  10. ^"Pupils' petition for more Fishguard trains pays off".BBC News. 30 March 2011. Retrieved27 November 2015.
  11. ^"Farewell as Stena Line's 'Lynx' Fast-Ferry Sets Sail for South Korea".afloat.ie. Retrieved27 November 2015.
  12. ^"Goodwick railway station near Fishguard to reopen".BBC News. 2 January 2012. Retrieved2 January 2012.
  13. ^"Station on track for March opening". Retrieved15 April 2012.
  14. ^OnlineWales Internet Ltd 20150411."Wales Holiday Accommodation – Cottages, Hotels, Bed and Breakfast :: Stay in Wales".Stay in Wales. Retrieved27 November 2015.{{cite web}}: CS1 maint: numeric names: authors list (link)
  15. ^"Welsh Government – Rail Improvement Delivers a New Beginning to South West Wales".wales.gov.uk. 8 July 2013. Retrieved27 November 2015.
  16. ^"Network Rail"(PDF).networkrail.co.uk. Retrieved27 November 2015.
  17. ^"Pembroke Dock: Plans to put train station back on the map".The Pembrokeshire Herald and General Advertiser. 6 March 2018.

Further reading

[edit]
Wikimedia Commons has media related toWest Wales Line.
Template:Attached KML/West Wales Lines
KML is from Wikidata
InterCity lines
Main lines
Valleys & Cardiff
Local Routes
Other lines
Service routes
Transport inCarmarthenshire
Roads
Bus
Cycling
Railway lines
Railway stations
Heart of Wales line
West Wales line
Gwili Railway
Air
History
Politics
Gower Constituency
Neath and Swansea East
Constituency
Swansea West Constituency
Communities
Culture
Education
Sports
Buildings
Transport
Roads
Bus
Cycling
Railway lines
Railway stations
Air
Waterways
Sea
Transport inPembrokeshire
Roads
Cycling
Railway lines
Railway stations
Air
Sea
Bus
Historic Welsh railway companies
Great Western
Railway
London and North
Western Railway
Joint lines
Independent lines
Industrial railways
Retrieved from "https://en.wikipedia.org/w/index.php?title=West_Wales_lines&oldid=1259507011"
Categories: