![]() Westbound entrance to the Ted Williams Tunnel, April 2016 | |
Overview | |
---|---|
Location | Boston, Massachusetts |
Coordinates | 42°21′12″N71°01′42″W / 42.3533°N 71.0283°W /42.3533; -71.0283 |
Status | Open |
Route | ![]() |
Start | South Boston |
End | Logan International Airport inEast Boston |
Operation | |
Constructed | 1991–1995 |
Opened |
|
Owner | Commonwealth of Massachusetts |
Operator | Massachusetts Department of Transportation |
Traffic | Automotive |
Toll | Between $0.20 and $2.05 both directions depending on payment method and residency |
Technical | |
Length | 1.6 mi (2.6 km) |
No. oflanes | 6 at ends, 4 under harbor |
Operating speed | 45 mph (72 km/h) |
Lowest elevation | −100 feet (−30 m)[1] |
TheTed Williams Tunnel is a highway tunnel inBoston,Massachusetts. The third in the city to travel underBoston Harbor, with theSumner Tunnel and theCallahan Tunnel, it carries the final segment ofInterstate 90 (theMassachusetts Turnpike) fromSouth Boston towards its eastern terminus atRoute 1A inEast Boston, slightly beyondLogan International Airport. The tunnel is named after theBoston Red Soxbaseball legendTed Williams.
The underwater section of the tunnel is 90 feet below the surface of Boston Harbor, the deepest such connection in North America.[2]
The Ted Williams Tunnel (TWT) was the first major link constructed as part of Boston'sBig Dig. It is constructed from twelve "binocular" shaped steel sections fabricated in a Baltimore shipyard. These sections were then brought to the Black Falcon Pier near the site and each was fitted with a large surrounding mass ofconcrete (so that the tunnel section was more neutrally buoyant). Using additional flotation, the tunnel sections were then floated into place, lowered into a dredged channel, and joined to the other sections. At this point, the steel panels sealing the now-joined sections could be cut out and the finishing operations could be completed.
When the TWT opened in 1995 it was only available to authorized commercial traffic. Later, non-commercial traffic was allowed to access the tunnel on weekends and holidays. In 2003, with the substantial completion of the I-90 portion of the Big Dig, the tunnel was opened to all traffic at all times.
The tunnel is 8,448 feet (2,575 m) long, of which approximately 3,960 feet (1,210 m) are underwater. Atoll is collected in both directions, through theE-ZPasselectronic toll collection system, formerly named the"Fast Lane" system. Vehicles with a Massachusetts E-ZPass transponder pay $1.75, and the tolls are higher for vehicles with an out of state E-ZPass or vehicles without an E-ZPass. Eligible East Boston residents for the E-ZPass discount program pay $0.20 for either direction.[3] Commercial vehicles pay higher, depending on number of axles.[4]
On July 10, 2006, at approximately 11 p.m. four three-ton sections of a concrete drop ceiling inside theI-90 Fort Point Channel tunnel leading to the Ted Williams Tunnel collapsed. A section of ceiling fell on top of a car traveling through the connector tunnel, killing 38-year-old passenger Milena Del Valle and slightly injuring her husband Angel Del Valle, who was driving. The cause of the collapse was later determined to be the failure of adhesives connecting a steel tieback suspending the concrete drop ceiling to the main ceiling above. Massachusetts governorMitt Romney ordered the eastbound lanes of the Ted Williams Tunnel to be immediately shut down on July 20 after two ceiling supports showed signs of slippage. At a press conference, Romney stated that "pull tests" were to be conducted in the eastbound tube to test the stress load on the bolt/epoxy system that supports the drop ceiling. An independent contracting firm was to conduct that test. Romney said the shutdown should last "hours, not days".[5][6] The next morning, the eastbound lanes of the tunnel were opened toMBTASilver Line buses as well as commercial buses running toLogan Airport.
Late in the evening of August 8, I-90 connector ramp A leading to the Ted Williams Tunnel was reopened to general traffic, easing the crunch on Logan Airport traffic coming from the south. Cars heading to the airport northbound on the Southeast Expressway (I-93) would get off at exit 15B (former exit 18)[7] and take the South Boston Access (Haul) Road to Ramp A, eliminating the need to go through downtown Boston and U-turn atStorrow Drive to access theCallahan Tunnel.[8] One eastbound lane of the connector tunnel which collapsed was reopened to traffic on September 1.