Taipei Metro | |
---|---|
![]() | |
![]() Top: Heavy-capacity Taipei Metro trainBottom: Medium-capacity Taipei Metro Train | |
Overview | |
Native name | 臺北捷運[I] |
Owner | Taipei City Government |
Locale | Taipei andNew Taipei |
Transit type | Rapid transit Rubber-tyred metro (Wenhu line) |
Number of lines | 5[a][1] |
Number of stations | 117[b] |
Daily ridership | 1.98 million (2023) |
Annual ridership | 918,360 million (2023)![]() |
Chief executive | BC Yen |
Headquarters | 7 Lane 48 Sec 2 Zhongshan N Rd,Zhongshan District,Taipei |
Website | www |
Operation | |
Began operation | 28 March 1996 |
Operator(s) | Taipei Rapid Transit Corporation |
Character | Grade-separated |
Number of vehicles | 849 cars (217.5 trains[c]) |
Train length | 3–6 carriages[d] |
Headway | 5 min 28 s[e] |
Technical | |
System length | 152.9 km (95.0 mi)[1] |
No. of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge[f] |
Minimum radius of curvature | 200 metres (656 ft)[g] |
Electrification | 750 V DC third rail |
Average speed | 31.50 kilometres per hour (20 mph)[h] |
Top speed | 80 kilometres per hour (50 mph)[i] |
Taipei Metro | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 臺北捷運 | ||||||||||||||||||||
Simplified Chinese | 台北捷运 | ||||||||||||||||||||
| |||||||||||||||||||||
Taipei Rapid Transit System | |||||||||||||||||||||
Traditional Chinese | 臺北大眾捷運系統 | ||||||||||||||||||||
Simplified Chinese | 台北大众捷运系统 | ||||||||||||||||||||
| |||||||||||||||||||||
Taipei Metro[I] (also known asTaipei Mass Rapid Transit (MRT)[3] and branded asMetro Taipei)[4] is arapid transit system operated by the Taipei Rapid Transit Corporation serving the capitalTaipei andNew Taipei City inTaiwan.
It was the firstrapid transit system to be built on the island.[5] The initial network was approved for construction in 1986 and work began two years later.[6] It began operations on 28 March 1996, and by 2000, 62 stations were in service across three main lines.[7]
Over the next nine years, the number of passengers had increased by 70%. Since 2008, the network has expanded to 131 stations and the passenger count has grown by another 96%.[citation needed] The system has been praised by locals for its effectiveness in relieving growing traffic congestion in Taipei and its surrounding satellite towns, with over eight million trips made daily.[8]
The idea of constructing arapid transit system on the island was first put forth at a press conference on 28 June 1968, where theMinistry of Transportation and Communications announced its plans to begin researching the possibility of constructing such a network in theTaipei metropolitan area; however, the plan was shelved due to financial concerns and the belief that such a system was not urgently needed at the time. With the increase oftraffic congestion accompanying economic growth in the 1970s, the need for a rapid transit system became more pressing.[9] In February 1977, the Institute of Transportation (IOT) of theMinistry of Transportation and Communications (MOTC) released a preliminary rapid transport system report, with the designs of five lines: U1, U2, U3, S1, and S2, to form a rough sketch of the planned corridors, some of which would be converted from single-trackedTaiwan Railways Administration (TRA) branch lines, resulting in the first rapid transit system plan for Taipei.[10]
In 1981, the IOT invited British Mass Transit Consultants (BMTC) andChina Engineering Consultants, Inc. [zh] to form a team and provide in-depth research on the preliminary report.[10] In 1982, the Taipei City Government commissionedNational Chiao Tung University to do a research and feasibility study on medium-capacity rapid transit systems. In January 1984, the university proposed an initial design for a medium-capacity rapid transit system in Taipei City, including plans for Wenhu line and Tamsui–Xinyi line of the medium-capacity metro system. The pre-1985 plans would have retained the3 ft 6 in gauge of the TRA lines and the rolling stock design would have to be conform to TRA and Japanese narrow-gauge standards.[10] On 1 March 1985, theExecutive YuanCouncil for Economic Planning and Development (CEPD) signed a treaty with the Taipei Transit Council (TTC), composed of three American consultant firms, to do overall research on a rapid transit system in metropolitan Taipei. Apart from adjustments made to the initial proposal, such as the move to standard gauge track and wider and longer rolling stock for the high-capacity lines, Wenhu line of the medium-capacity metro system was also included into the network. In 1986, the initial network design of the Taipei Metro by the CEPD was passed by theExecutive Yuan, although the network corridors were not yet set.[6] A budget of NT$441.7 billion was allocated for the project.[11]
On 27 June 1986, the Preparatory Office of Rapid Transit Systems was created,[12] which on 23 February 1987 was formally established as theDepartment of Rapid Transit Systems (DORTS) for the task of handling, planning, design, and construction of the system.[11] Apart from preparing for the construction of the metro system, DORTS also made small changes to the metro corridor. The 6 lines proposed on the initial network were:[10] Tamsui line and Xindian line (Lines U1 and U2), Zhonghe Line (Line U3), Nangang Line and Banqiao Line (Line S1), and Muzha (now Wenhu) line (Wenhu line medium-capacity), totaling 79 stations and 76.8 km (47.7 mi) route length,[11] including 34.4 km (21.4 mi) of elevated rail, 9.5 km (5.9 mi) at ground level, and 44.2 km (27.5 mi) underground.[12] The Neihu Line corridor was approved later in 1990. On 27 June 1994, theTaipei Rapid Transit Corporation (TRTC) was formed to oversee the operation of the Taipei Metro system.
TheExecutive Yuan approved the initial network plan for the system on 27 May 1986.[6] Ground was broken and construction began on 15 December 1988.[6] The growing traffic problems of the time, compounded by road closures due to TRTS construction led to what became popularly known as the "dark age of Taipei traffic". The TRTS was the center of political controversy during its construction and shortly after the opening of its first line in 1996 due to incidents such as computer malfunction during a thunderstorm, alleged structural problems in some elevated segments,budget overruns, and fare prices.
The system opened on 28 March 1996, with the 10.5 km (6.5 mi) elevatedWenhu line, a driverless,medium-capacity line[6] with twelve stations running fromZhongshan Junior High School toTaipei Zoo. The first high-capacity line, theTamsui–Xinyi line, began service on 28 March 1997, running fromTamsui toZhongshan, then extended toTaipei Main Station at the end of the year. On 23 December 1998, the system passed the milestone of 100 million passengers.[13]
On 24 December 1999, a section of theBannan line was opened betweenLongshan Temple andTaipei City Hall.[6] This section became the first east–west line running through the city, connecting the two previously completed north–south lines. On 31 May 2006, the second stage of the Banqiao–Nangang section and the Tucheng section began operation.[6] The service was then named Bannan after the districts that it connects (Banqiao andNangang).
On 4 July 2007, theMaokong Gondola, a newaerial lift/cable-car system, was opened to the public. The system connects theTaipei Zoo,Zhinan Temple, andMaokong. Service was suspended on 1 October 2008 due to erosion from mudslides under a support pillar followingTyphoon Jangmi.[14] The gondola officially resumed service as of 31 March 2010, after relocation of the pillar and passing safety inspections.[15]
On 4 July 2009, with the opening of the Neihu segment ofWenhu line, the last of the six core segments was completed. Due to debate on whether to construct a medium-capacity or high-capacity line, construction of the line did not begin until 2002.[citation needed]
Zhonghe–Xinlu line was extended fromGuting toLuzhou andHuilong in 2012. The Xinyi section ofTamsui–Xinyi line and Songshan section ofSongshan–Xindian line were opened on 24 November 2013 and 15 November 2014 respectively.
Prior to 2014, only physical lines had official names; services did not. In 2008, all full-run and short-turn services were referred to by termini[16][17] whileBannan andWenhu services were referred to by the physical lines on which they operated.[18][19]
Following the completion of the core sections of the system in 2014, the naming scheme for services was set and 'lines' started to referred to services. Between 2014 and 2016, lines were given alternative number names based on the order of the dates the lines first opened. Brown, Red, Green, Orange and Blue lines were named lines 1 to 5 respectively. The planned Circular, Wanda–Shulin and Minsheng–Xizhi lines were to be lines 6 to 8 respectively. In 2016, the number names were replaced by colour names. Today, on-board announcements in Chinese use full official names, whereas in English, colour names are used instead.
In June 2023, due to an increasing number of South Korean tourists, the metro announced the addition of Korean announcements at stations where there are high amounts of tourists.[20]
On 3 April 2024, followinga magnitude 7 earthquake hitting the island, all active MRT trains were suspended for safety checks to be conducted.[21] All Taipei Metro routes resumed operations later that day.[22]
Number of lines: | 5 (including Wenhu Line, Tamsui-Xinyi Line, Songshan-Xindian Line, Zhonghe-Xinlu Line, and Bannan Line) |
Number of stations: | 117. Transfer stations (Ximen, CKS Memorial Hall, Guting, and Dongmen Stations) that connect two lines yet share only one physical station, are calculated as one station each. Other stations connecting two lines are calculated as two stations. |
Network length: | 131.1 km (operating), 136.9 km (constructed) |
The system is designed based on thespoke-hub distribution paradigm, with most rail lines running radially outward from central Taipei. The MRT system operates daily from 06:00 to 00:00 the following day[24] (the last trains finish their runs by 01:00), with extended services during special events (such asNew Year festivities).[25] Trains operate at intervals of 1:30 to 15 minutes depending on the line and time of day.[24][26] Smoking is forbidden in the entire metro system, while eating, drinking, and chewing gum andbetel nuts are forbidden within the paid area.[27]
Stations can become extremely crowded during rush hours, especially at transfer stations such asTaipei Main Station,Zhongxiao Fuxing, andMinquan West Road. Automated station announcements are recorded inMandarin,English,Taiwanese, andHakka, withJapanese at busy stations.[28] Japanese coverage across the network was expanded on 24 August 2023. Select stations also receivedKorean announcements to accommodate for the high influx of South Korean tourists to thecapital.[29] Subsequently, announcement order was changed to Mandarin, English, Japanese, Korean, then Taiwanese and Hakka.[30]
Icon | Full name | Services | Peak headway (mins) | Off-peak headway, typical | Length km | Stations |
---|---|---|---|---|---|---|
![]() | Wenhu line | Nangang Exhib Center–Taipei Zoo | 2–4 | 4–10 | 25.1 | 24 |
![]() | Tamsui–Xinyi line | Tamsui–Xiangshan (full service) | 6 | 8–10 | 29.3 | 28 |
Beitou–Daan (short turn service) | 3[j] | 4–5[j] | ||||
Beitou–Xinbeitou (Xinbeitou branch) | 7–8 | 10 | ||||
![]() | Songshan–Xindian line | Songshan–Xindian (full service) | 4–6 | 6–8 | 21.5 | 19 |
Songshan–Taipower Building (short turn service) | 3[j] | 4–6[j] | ||||
Qizhang–Xiaobitan (Xiaobitan branch) | 12–20 | 12–20 | ||||
![]() | Zhonghe–Xinlu line | Luzhou–Nanshijiao (Luzhou branch) | 6[k] | 8–10[l] | 29.3 | 26 |
Huilong–Nanshijiao (Xinzhuang branch) | 6[k] | 8–10[l] | ||||
![]() | Bannan line | Dingpu–Nangang Exhib Center (full service) | 6 | 8–10 | 26.6 | 23 |
Far Eastern Hospital–Nangang Exhib Center (short turn service) | 3 | 4–5 | ||||
Far Eastern Hospital–Kunyang (short turn, night service) | 3 | 4–5 | ||||
Total | 152.9[3] | 134 |
Fares range betweenNT$20–65 per trip as of 2018.RFID single journey tokens and rechargeable IC cards (such as theEasyCard and theiPASS), as well asNFC-based mobile payments (onlyGoogle Wallet andSamsung Wallet) are used to collect fares for day-to-day use.[31][32]
A 20% off discount was given to all IC card users, but it was cancelled at the start of February 2020.[33] The discount program was instead switched to an intensity-based scheme. The more times passengers take the MRT, the higher the level of discount they could receive. From February 2020 until February 2025, the following rebate scheme was used: 10% discount for 11–20 rides; 15% discount for 21-30 rides; 20% discount for 31–40 rides; 25% discount for 41-50 rides; and 30% off for more than 50 rides.[34] Effective March 2025, the rebate scheme was modified and is as follows: 5% discount for 11–20 rides; 10% discount for 21–40 rides; and 15% off for more than 40 rides.[35] The discount is considered a rebate and the rebate from a previous month is deposited to the user's card on the first ride of each month; the rebate must be collected within 6 months.[36] Those with welfare cards issued by local governments could receive 60% off per ride.[37] Children aged 6 or over pay adult fares. Other ticket types include passes, joint tickets with other services and tickets for groups and discounts for YouBike rentals at the Taipei Main Station.[38]
Turnstiles of Taipei Metro are being replaced by the end of 2025 to enable contactless bank card and QR code payments.[39]
The Taipei Metro provides an obstacle-free environment within the entire system; all stations and trains arehandicap accessible. Features include:[40][41][42] handicap-capable restrooms, ramps and elevators for wheelchairs and strollers, tactile guide paths, extra-wide faregates, and trains with a designated wheelchair area.[43]
Beginning in September 2003, the English station names for Taipei Metro stations were converted to useHanyu pinyin before the end of December, with brackets forTongyong Pinyin names for signs shown at the station entrances and exits.[44] However, after the conversion, many stations were reported to have multiple conflicting English station names caused by inconsistent conversions, even for stations built after enactment of the new naming policy.[citation needed] The information brochures (臺北市大眾捷運系統捷運站轉乘公車資訊手冊) printed in September 2004 still used Wade–Giles romanizations.[45]
To accommodate increasing passenger numbers, all metro stations have replacedturnstiles with speed gates since 2007, and single-journey magnetic cards have been replaced byRFID tokens.[46]TRTS provides free mobile phone connections in all stations, trains, and tunnels and also providesWiFi WLAN connections at several station hotspots.[47] The world's firstWiMAX-service metro trains were introduced on theWenhu line in 2007, allowing passengers to access the internet and watch live broadcasts.[48] Several stations are also equipped with mobile charging stations.[49]
Most underground stations haveisland platform configurations while a few haveside platform configurations. Most elevated and at-grade stations have side platform configurations, while a few have island platform configurations. All high-capacity metro stations have a 150 m (490 ft) long platform to accommodate all six-train cars on a typical metro train (with the exception ofXiaobitan). The width of the platform and concourse depends on the volume of transit; the largest stations includeTaipei Main Station,Taipei City Hall, andXimen. Some other transfer stations, includingChiang Kai-shek Memorial Hall,Guting, andSongjiang Nanjing, also have wide platforms.
Several stations have across-platform interchange: Chiang Kai-Shek Memorial Hall, Guting, Dongmen and Ximen. Both lines' tracks in one direction use the lower floor, while both lines' tracks in the other direction use the upper floor. Dongmen station is unique in that the directions of travel on each floor are reversed, so that there's a cross-platform interchange when travelling between the city center and the suburbs.
Each station is equipped withLED displays andLCD TVs both in the concourse and on the platforms which display the time of arrival of the next train. At all stations, red lights on or above automatic platform gates at stations flash prior to a train arrival to alert passengers and anarrival melody would play (except on theWenhu line and certain elevated and at-grade stations). Similarly, before platform screen doors were retrofitted, stations would have lights on the edges of platforms which would flash upon a train's arrival. This can still be seen on other metro systems such as theWashington Metro.
As of September 2018, all stations have automatic platform gates.[50] Before 2018, all the stations on the Wenhu line and most stations on theZhonghe–Xinlu line, as well as a few stations on other lines, were equipped withplatform screen doors.[51][52][53] A Track Intrusion Detection System had also been installed to improve passenger safety at stations without platform doors.[53] The system usesinfrared andradio detectors to monitor unusual movement in the track area.[54]
When theMuzha Line first opened in 1996, the line was initially equipped withautomatic train operation (ATO) andautomatic train control (ATC), which in turn comprisedautomatic train protection (ATP) and automatic train supervision (ATS); in particular the ATP relied on transmission coils and wayside control units whereas the ATO relied on dwell operation control units. The transmission coils are controlled by the Control Centre to ensure safety of the line and were positioned on the guideway. Among such coils included the PD loop, safety frequency loop, stopping program loop, vehicle station link and station vehicle link; these loops were cross-arranged to produce electromagnetic induction with the interval between two cross points being 0.3 seconds to both monitor the train and control its speed.[55] However this fixed-block ATC system used on the Muzha Line was plagued with problems in its early years of operation and was replaced with the new moving-blockCityflo 650 CBTC that was supplied byBombardier Transportation of Canada for theNeihu Line.[56]
On the other hand, the heavy-capacity lines use the traditional fixed block system design, which were initially supplied byGeneral Railway Signal ofRochester, New York, for theTamsui,Xindian,Zhonghe, andBannan lines; and later byAlstom for theTucheng,Xinzhuang, Luzhou,Xinyi andSongshan lines. Key components of the system include impedance bond, 4-foot loops, marker coils, alignment antennae and two-aspect light signals for the wayside as well as automatic train supervision which utilisescentralized traffic control.[57]
In the initial network, important stations such as transfer stations, terminal stations, and stations with heavy passenger flow were chosen for the installation of public art. The principles behind the locations of public art were visual focus and non-interference with passenger circulation and construction schedules. The artworks included murals, children's mosaic collages, sculptures, hung forms, spatial art, interactive art, and window displays. The selection methods included open competitions, invitational competitions, direct assignments, and cooperation with children.
Stations with public art displays include:Shuanglian,NTU Hospital,Chiang Kai-shek Memorial Hall,Guting,Gongguan,Xindian,Xiaobitan,Dingxi,Nanshijiao,Taipei City Hall,Kunyang, Songshan Airport,Nangang,Haishan, andTucheng. Stations with art galleries includeZhongshan,Chiang Kai-shek Memorial Hall,Zhongxiao Fuxing, andTaipei Main Station.Beimen station contains a small archeological museum.
In addition to the rapid transit system itself, Taipei Metro operates several public facilities such asunderground shopping malls, parks, and public squares in and around stations,[58] including:
As of 2022 there are 229 shops within the stations themselves.[60]
Transfers tocity bus stations are available at all metro stations. In 2009, transfer volume between the metro and bus systems reached 444,100 transfers per day (counting onlyEasyCard users).[61] Connections toTaiwan Railway Administration andTaiwan High Speed Rail trains are available atTaipei Main Station,Banqiao andNangang. Connections toTaipei Bus Station andTaipei City Hall Bus Station are available atTaipei Main Station andTaipei City Hall stations, respectively. TheMaokong Gondola is accessible fromTaipei Zoo.
Taipei Songshan Airport is served by theSongshan Airport station.[62] Ametro system to connect Taipei toTaoyuan International Airport has also been available since March 2017.
Connections withNew Taipei Metro is also available, specifically withCircular line andDanhai LRT.
All rolling stocks on the Taipei Metro areelectric multiple units, powered by athird rail at 750 volts direct current. Each train is equipped withautomatic train operation (ATO) for a partial or complete automatic train piloting and driverless functions.
Themedium-capacity trains ofWenhu line are1,880 mm (6 ft 2 in) broad gaugerubber-tired trains with no onboard train operators but are operated remotely by the medium-capacity system operation control center. It initially used a fixed-blockautomatic train control (ATC) system. Each train consists of two 2-carelectric multiple unit (EMU) sets, with a total of 4 cars.[1] The Wenhu line is the only line on the system to have no open-gangway carriages, meaning that passengers cannot move between carriages when the train is moving.
TheWenhu line was initially operated withVAL 256 trains cars, where two VAL 256 cars in the same set would share the same road number. As a result of this numbering scheme, the 102 cars of the VAL fleet have car numbers from 1 to 51. In June 2003,Bombardier was awarded a contract to supply theWenhu line with 202INNOVIA APM 256 train cars,[63] to install theCITYFLO 650 moving-blockcommunications-based train control (CBTC) system to replace the fixed-block ATC system and also to retrofit the existing 102 VAL 256 cars with the CITYFLO 650 CBTC system. Integration of Bombardier's trains with the existingWenhu line proved to be difficult in the beginning, with multiple system malfunctions and failures during the first three months of operation.[64] Retrofitting older trains also took longer than expected, as the older trains must undergo several hours of reliability tests during non-service hours. The VAL 256 trains resumed operations in December 2010.
Theheavy-capacity trains have steel wheels and are operated by an on-board train operator. The trains are computer-controlled. The operator, who is bothdriver andconductor, is responsible for opening and closing the doors and making (not all) announcements. Most announcements are pre-recorded in Mandarin, English, Hokkien and Hakka, with Japanese and Korean at busy stations. The ATC provides the functions of ATP, ATO and ATS[65] and controls all train movements, including braking, acceleration and speed control, but can be manually overridden by the operator in case of an emergency.Newertrains also use aTrain Supervision Information System (TSIS) supplied byMitsubishi Electric that allows the operator to monitor the conditions of the train and identify any faults.[66]
Each train consists of two 3-carElectric Multiple Unit (EMU) sets, with a total of 6 cars.[1] Each 3-car EMU set is permanently coupled as DM–T–M, where DM is the motor car with full-widthcab, T is atrailer car and M is the motor car withoutcab. Each motor car has four3-phase ACtraction motors. The configuration of a 6-car train is DM–T–M+M–T–DM, not interchanged with other car types. Like many contemporary metro rolling stock designs such as theMOVIA by Bombardier, each train featuresopen gangways, allowing passengers to move freely between cars.[citation needed]
All carriages of the heavy-capacity trains are 3.2 metres (10 ft 6 in) wide by3.6 metres (11 ft9+3⁄4 in) high, and have a total capacity of 368 passengers, 60 of which seated. Their design maximum speed is 90 km/h (56 mph), which is limited to 80 km/h (50 mph) in service.[citation needed]
The first digit of a DM car is 1, while that of a T car is 2 and that of an M car is 3. This digit then follows the three digits of the set number. For example, C301 set 001/002 consists of carriages 1001-2001-3001+3002-2002-1002.[citation needed]
A single set cannot be in revenue service except C371 single sets 397–399, where their M car is exactly a DM car despite its first digit being 3. These single sets run exclusively on theXinbeitou andXiaobitan branch lines.[67] Before the C371 single sets were in revenue service on 22 July 2006, the M cars of C301 sets 013/014 were converted to temporary cab cars to run the Xinbeitou branch.
In 2010, the new C381 was built for Taipei Metro to cope with increasing passenger ridership and the expansion of its network route. Upon entering service on 7 October 2012, three C381 trainsets are servicing the Beitou – Taipower Building segment of the Tamsui and Xindian Lines, with the remaining fleet being put into service on 20 October 2012. These trains provided much-needed capacity increase when the Xinyi and Songshan extensions opened in late 2013. After November 2014, the C381 trains are serving bothTamsui–Xinyi line andSongshan–Xindian line[needs update]. Whereas the earlier heavy capacity train types have largely retained the same design, the C381 sets are more distinctive with double blue stripes and the re-positioning of the logo from the driver's door to well below the passenger's windows, right on the stripe. Also placed were the more "sleeker" cab and the new advertising screens (as seen in newer Japanese commuter trains such as theE233 series) to improve energy efficiency, although it retains the same propulsion as the C371s.[citation needed]
In March 2024, it was announced that seven additional trains (42 cars) would be built byHyundai Rotem and introduced between 2026 and 2028 to further cope with increasing passenger ridership.[68] These trains are expected to contain fewer seats per carriage, but in turn increase total capacity per carriage.[69][70][71]
Car type | Photo | Year built | Builder(s) | Train length (m) | Capacity (seated/standing) | Max. speed[m] (km/h) | Fleet total | Car set numbers | Line(s) | Depot(s) | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
VAL256 | ![]() | 1989–1993 | Matra,GEC Alsthom | 55.12 | 24/114 | 80/70 | 102 | 01–51 | ![]() | Muzha, Neihu | Formed of two married pairs; closed end cars |
Innovia APM 256 | ![]() | 2006–2007 | Bombardier | 20/142 | 90/70 | 202 | 101–201 |
Car type | Photo | Year built | Builder(s) | Train length (m) | Fleet total | Car set numbers | Line(s) | Depot(s) | Notes |
---|---|---|---|---|---|---|---|---|---|
C301 | 1992–1994 | Kawasaki, URC | 141 | 132 | 001–044 | ![]() | Beitou | 6-car train in DM–T–M+M–T–DM configuration as two 3-car sets | |
C321 (Modular Metro) | 1998–1999 | Siemens | 216 | 101–116 175/176[n] 119–172 | ![]() | Nangang, Tucheng | |||
C341 (Modular Metro) | ![]() | 2003 | 36 | 201–212 | |||||
C371 | ![]() ![]() | 2005–2009 | Kawasaki, TRSC[o] | 321 | 301–338 (1st batch) 401–466 (2nd batch) 397–399 (for branch lines only) | ![]() ![]() ![]() ![]() |
| ||
C381 | ![]() | 2010–2013 | Kawasaki, TRSC | 141.42 | 144 | 501–548 | ![]() ![]() | Beitou,[s] Xindian[t] | 6-car train in DM–T–M+M–T–DM configuration as two 3-car sets |
Taipei Metro also uses a fleet of specialised trains formaintenance of way purposes:[72]
Car Type | Purpose | Builder | Max. speed (km/h) | Length (m) | Lines used on |
---|---|---|---|---|---|
Barclay locomotive | Traction for maintenance rolling stock | Hunslet-Barclay | 35 | 13.5 | ![]() ![]() ![]() ![]() ![]() ![]() |
Tamping machine | Track ballast tamping | Plasser & Theurer | 0.25 | 29.2 | |
Railgrinder | Restore the profile and remove irregularities from worn tracks | Speno,Harsco[73] | 2–7 | 33 | |
Rail inspection vehicle | Measure and record rail track-related data | Plasser & Theurer | 30 | 12.5 | |
Ultrasonic rail testing vehicle | Detects internal cracks within rail tracks usingultrasound | Speno | 25 | 8.4 | |
High pressure cleaning car | Cleaning of rail tracks and third rail | China Steel Corporation | 2–7 | 26 | |
Water storage and power car | Provides water source and propulsion for high pressure cleaning car | 26 | |||
Vacuum cleaning vehicle | Remove tunnel sludge | — | 19 | ||
Flash welding vehicle | Rail welding | Plasser & Theurer | 16.24 | ||
Rail crane wagon | Lifting heavy spare parts | China Steel Corporation | 45 | 11.2/11.4/16.4/18.7 | |
Flat wagon | Carry spare parts | — | — | 18.7 | |
Open wagon | Carryballast | China Steel Corporation | 19.8 | ||
Water tanker | Store water used for cleaning purposes | — | 2–7 | — | |
Maintenance locomotive | Maintenance of way | Nicolas | — | ![]() |
The system currently has 9 depots, with more under construction.[74]
Depot Name | Year Opened | Location | Rolling Stock Housed | Line(s) Served |
---|---|---|---|---|
Muzha [zh] | 1996 | Wenshan, northeast ofTaipei Zoo | VAL256,BT370 | ![]() |
Beitou [zh] | 1997 | Beitou, southwest ofFuxinggang | C301,C371 (single),C381 | ![]() ![]() |
Zhonghe [zh] | 1998 | Zhonghe, east ofNanshijiao | C371 | ![]() |
Xindian [zh] | 1999 | Xindian, northwest ofXiaobitan | C371, C381 | ![]() ![]() |
Nangang [zh] | 2000 | Nangang, southeast ofKunyang | C321,C341 | ![]() |
Tucheng [zh] | 2006 | Tucheng, southwest ofFar Eastern Hospital | ||
Neihu [zh] | 2009 | Nangang, northeast ofTaipei Nangang Exhibition Center | VAL256, BT370 | ![]() |
Luzhou [zh] | 2010 | Luzhou, northwest ofLuzhou | C371 | ![]() |
Xinzhuang [zh] | 2021[75] | Xinzhuang, north ofHuilong | C371 | ![]() |
![]() | Graphs are unavailable due to technical issues. Updates on reimplementing the Graph extension, which will be known as the Chart extension, can be found onPhabricator and onMediaWiki.org. |
Year | Millions of Journeys | ±% p.a. |
---|---|---|
2012 | 602.2 | — |
2013 | 635 | +5.45% |
2014 | 679.5 | +7.01% |
2015 | 717.5 | +5.59% |
2016 | 740 | +3.14% |
2017 | 746.1 | +0.82% |
2018 | 765.5 | +2.60% |
2019 | 789.6 | +3.15% |
2020 | 695.7 | −11.89% |
2021 | 531.1 | −23.66% |
Source:[76] |
Taipei Metro is one of the most expensive rapid transit systems ever constructed,[77] with phase one of the system costing US$18 billion[12] and phase two estimated to have cost US$13.8 billion.
Despite earlier controversy, by the time the first phase of construction was completed in 2000, it was generally agreed that the metro project was a success, and it has since become an essential part of life in Taipei. The system has been effective in reducingtraffic congestion in the city and has spurred the revival ofsatellite towns (likeTamsui) and development of new areas (likeNangang).[8][78] The system has also helped to increase average vehicle speed for routes running fromNew Taipei intoTaipei.[79] Property prices along metro routes (both new and existing) tend to increase with the opening of more lines.[80][81]
Since the Taipei Metro joined the Nova International Railway Benchmarking Group and theCommunity of Metros (Nova/CoMET) in 2002, it has started collecting and analysing data of the 33 Key Performance Indicators set by Nova/CoMET in order to compare them with those of other metro systems around the world, as a reference to improve its operation. Taipei Metro also has gained keys to success from case studies on different subjects such as safety, reliability, and incidents, and from the operational experiences of other metro systems.[82]
According to a study conducted by the Railway Technology Strategy Center atImperial College London,[83] and data gathered by Nova/CoMET, the Taipei Metro has ranked number 1 in the world for four consecutive years in terms of reliability, safety, and quality standards (2004–2007).[53] The most congested route sections handle over 38,000 commuters per hour during peak times.[84]
On New Year's Eve 2009 and New Year's Day 2010, the Metro system transported 2.17 million passengers in 42 consecutive hours. On 22 April 2010 after 14 years of service, the system achieved the milestone of 4 billion cumulative riders.[85] On 29 December 2010, the system passed the benchmark of 500 million annual passengers for the first time.[86] The record for single day ridership hit 2.5 million passengers during the New Year's Eve celebrations on 31 December 2010.[87][88] Following opening of the Xinyi section ofTamsui–Xinyi line, the system reached another record of 2.75 million passengers on 31 December 2013.[89]
In May 2016, the Singapore Transport Minister, Khaw Boon Wan, said that his country's rail operators,SBS Transit andSMRT, should emulate the example of Taipei Metro. Speaking at a rail engineering forum, he cited the Taipei Metro's timely maintenance and replacement of assets, as well as its fast response to rail network problems. Khaw said the Singapore Land Transport Authority (LTA) is working with the TRTC to attach staff from SBS and SMRT to its metro workshops, so they can learn from its asset maintenance practices and engineering improvements.[90][91][92]
Several lines are planned to be added to the network.[93][94][95][96]
Phase 2 of the Circular line is under construction and planned to be completed in June 2031.[97] Phase 2 consists of a northern and southern section. The northern section will continue fromNew Taipei Industrial Park toJiannan Road. This section will serviceWugu,Luzhou,Sanchong,Shilin, andNeihu. The southern section will continue fromDapinglin toTaipei Zoo and will mainly serviceWenshan. Upon reaching a year before completion of Phase 2 of the Circular line, the Circular line will be handed back to Taipei Metro fromNew Taipei Metro.
Phase 3 has began construction in 2025 and is expected to finish in 2032.[98] Phase 3 consists of the eastern section, which will connectJiannan Road andTaipei Zoo in Phase 2, making the line a complete loop.
Wanda–Zhonghe–Shulin is a metro line under construction. Phase 1 will run fromCKS Memorial Hall to Juguang,Zhonghe, New Taipei. Phase 1 is expected to be completed in 2027.
Phase 2 will connect Zhonghe Senior High School, the previous station of Juguang, toHuilong, making the part between Zhonghe Senior High School and Juguang a branch line. The entire line is expected to be fully completed around late 2028.[99]
![]() | This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(June 2016) |
Minsheng–Xizhi is a planned metro line. As of February 2011, New Taipei has been pursuing the construction of the 17.52-km Minsheng–Xizhi line, though the most recent plan was rejected by theMinistry of Transportation and Communications, citing the need for further evidence for the line's viability.[100] The city plans to re-submit the proposal, and the project is estimated to cost NT$42.2 billion (US$1.44 billion).[100] A possible 4.25-km extension of the line to connect with the plannedKeelung light rail is also being considered.[101] The line is planned to be built partially underground and partially elevated. It will begin from Dadaocheng Harbour beneath Minsheng West Road in Taipei, run along Minsheng East and West Roads, pass through Minsheng Community and journey under the Keelung River towards the Neihu District. The line will then change to an elevated mode and reach its termini at Xintai 5th Road in Xizhi District, New Taipei City. As of May 2018, the proposal for this line has been submitted to the Ministry of Transportation and Communications, but has yet to be approved.[102]
On 17 September 2001,Typhoon Nari flooded all underground tracks as well as 16 stations, the heavy-capacity system operation control center, the administration building, and the Nangang Depot.[103] The elevatedWenhu line was not seriously affected and resumed operations the next day. However, the heavy-capacity lines were not restored to full operational status until three months later.[8]
On 21 May 2014, 28 people were stabbed in a mass stabbing by a knife-wielding college student on theBannan line.[104] The attack occurred on a train nearJiangzicui, resulting in 4 deaths and 24 injured.[105] It was the first fatal attack on the metro system since it began operations in 1996. The suspect was 21-year-oldCheng Chieh (鄭捷), a university student atTunghai University, who was arrested atJiangzicui immediately after the incident.[106] On 6 March 2015, Cheng Chieh was found guilty on multiple counts of murder and attempted murder, and was sentenced to death. He was subsequently executed on 10 May 2016.[107]
In early 2021, it was discovered that apornographic film production company had created a series of sets which copied the design of MRT trains and stations. This caused a brief stir when it was first released as many were concerned that the films had been shot on actual MRT trains and stations. Nevertheless, it was still condemned by Taipei MRT for imitating its train carriages.[108]
On 30 December 2021, Taipei MRT rejected anAmnesty International advertisement which featured detained human rights activistLee Ming-che.[109]