Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

StudSat

From Wikipedia, the free encyclopedia

STUDSAT
Mission typeRemote Sensing
Technology
OperatorSTUDSAT Consortium
COSPAR ID2010-035B[1]
SATCATno.36796
Mission duration6 months (planned)
Spacecraft properties
Spacecraft typeCubeSat
ManufacturerConsortium of 7 Engineering Colleges from Bangalore (4) and Hyderabad (3)
Launch mass0.950 kg (2.09 lb)
Dimensions10 cm x 10 cm x 13.5 cm
Start of mission
Launch date12 July 2010, 03:52:00UTC[2]
RocketPolar Satellite Launch Vehicle (PSLV-C15)
Launch siteSatish Dhawan,FLP
ContractorISRO
End of mission
Last contact2011
Orbital parameters
Reference systemGeocentric orbit[3]
RegimeSun-synchronous orbit
Perigee altitude602.5 km
Apogee altitude620.4 km
Inclination98.18°
Period96.8 minutes

STUDSAT (STUDent SATellite),[1] is aCubeSat satellite designed by students. This project was conceptualised and project managed by undergraduate students acrossIndia.[4] STUDSAT is apicosatellite successfully launched on 12 July 2010 fromSatish Dhawan Space Centre into aSun-synchronous orbit. The mission's objective was for students to have a hands-on experience with the design, fabrication and realisation of a space mission at a minimum cost. Experimental in nature, the mission life was stated to be six months.

STUDSAT was the first picosatellite launched by India, as well as the smallest satellite launched indigenously by any Indian organisation.[5]

History

[edit]

The project was initiated by a group of four students from different Engineering colleges ofHyderabad andBangalore who attendedInternational Astronautical Congress (IAC), 2007,Hyderabad, India after meeting Mr. D. V. A. Raghavamurthy (project director, Small Satellites, ISRO Satellite Centre) at the congress. From then the team expanded slowly, ultimately completing the conceptual design. Following the financial budget analysis, the students approached the management of their respective colleges for sponsorship. The colleges, in turn, approachedIndian Space Research Organisation (ISRO) for preliminary review of the project. ISRO scientists approved the preliminary design review after having a set of meetings with detailed presentations by the students. The initial four member team expanded to around 45 students from 10 different colleges. Seven of the colleges formed a consortium to provide the financial sponsorship for the project. The colleges are bound by an internalMemorandum of understanding (MOU), led by Nitte Meenakshi Institute of Technology, Bangalore as representative college to sign an official Memorandum of understanding with ISRO. The project team is led by Dr. Jharna Majumdar as the project coordinator.[6]

STUDSAT is successfully placed in the orbit and received the first signal on 12 July 2010 at 11:07 am IST (??:07 UTC).

Studsat consortium

[edit]

STUDSAT consortium consists of seven Engineering colleges fromHyderabad andBangalore bound by a Memorandum of understanding in order to sponsor the project financially. The consortium comprises the following colleges:

Description

[edit]

The satellite resembles a small rectangular cube, with length dimensions of 10 cm x 10 cm x 13.5 cm, a weight of almost 950 g. The satellite was launched in 625 kmSun-synchronous orbit. The satellite will perform the function of aremote sensing satellite and take images ofEarth's surface with aresolution of 90 meter, the best achieved by any "PICO" category satellite in the world.

The satellite consists of the following subsystems:

Aground station[7] has been designed in order to communicate with the satellite. The ground station NASTRAC (Nitte Amateur Satellite Tracking Centre) which is established in Nitte Meenakshi Institute of Technology (NMIT) was inaugurated byDr K. Radhakrishnan, the current chairman ofISRO.[8] All the above subsystems are designed by students indigenously.

Current status

[edit]

The satellite has completed its mission life. The CDR was conducted in NMIT where several scientists notably Prof.Udupi Ramachandra Rao former chairman ofISRO have evaluated the design.[9] The CDR had been approved byISRO. The satellite was launched byPolar Satellite Launch Vehicle (PSLV-C15) on 12 July 2010. The team had taken over control of the satellite from the ground station established at Nitte Meenakshi Institute of Technology (NMIT) in Bangalore. The satellite is no longer in contact with the ground station.

Two Line Element Set (TLE) of StudSat-1 are:

  • 1 36796U 10035B 12227.08525431 .00001146 00000-0 15376-3 0 2565
  • 2 36796 098.0573 303.0904 0014305 346.6376 013.4443 14.81257111113029

Source:AFSPC

STUDSAT-2

[edit]

The Team STUDSAT is continuing the legacy and building twinnanosatellite for proving the concept ofInter-satellite links (ISL). The design of the Twin-SatellitesSTUDSAT-2A and STUDSAT-2B, are of dimensions 30 cm x 30 cm x 20 cm and weighing less than 10 kg. The main goal of the STUDSAT 2 project is to develop a low-cost small satellite, capable of operating small scientific or technological payloads where real time connectivity is provided by inter-satellite links.

Achievements

[edit]

The team has presented a paper titled "Studsat-A Student Pico-Satellite for Imaging" inInternational Astronautical Congress, 2008 which was held inGlasgow,Scotland.[10] The team won Hans Von Muldau Award for the best team project awarded byInternational Astronautical Federation (IAF) and sponsored byDeutsche Gesellschaft für Luft- und Raumfahrt.[11] The Team has also done a National Record (India) by entering into LIMCA BOOK of RECORDS-2011 Edition for creating the smallest Indian satellite.

See also

[edit]

References

[edit]
  1. ^ab"Display: STUDSAT 2010-035B". NASA. 14 May 2020. Retrieved23 January 2021.Public Domain This article incorporates text from this source, which is in thepublic domain.
  2. ^"PSLV to launch five satellites on July 12".The Deccan Chronicle. Archived fromthe original on 4 July 2010. Retrieved2 July 2010.
  3. ^"STUDSAT". N2YO.com. Retrieved23 January 2021.
  4. ^Krebs, Gunter D."STUDSAT". Gunter's Space Page. Retrieved10 December 2022.
  5. ^"Engg students creating India's smallest satellite".The Times of India. 12 August 2009.Archived from the original on 4 November 2012.
  6. ^"City students to launch eye in the sky". Archived fromthe original on 5 April 2012. Retrieved25 July 2012.
  7. ^"IARU Sat Coordinator". Archived fromthe original on 19 April 2010. Retrieved31 March 2010.
  8. ^"Students' satellite project all set to take off".The Hindu. Chennai, India. 2 April 2010. Retrieved23 January 2021.
  9. ^"City students to launch eye in the sky". 10 August 2009. Archived fromthe original on 5 April 2012. Retrieved25 July 2012.
  10. ^"ISRO Sponsors Two Indian Students to participate in 59th IAC at Glasgow". Archived fromthe original on 23 September 2008. Retrieved12 September 2009.
  11. ^"Engg students creating India's smallest satellite".The Times Of India. 12 August 2009. Retrieved23 January 2021.

External links

[edit]
  • [ Team STUDSAT homepage]
Satellites
Communication
Earth observation
Experimental
Navigation
Student satellites
Aryabhata Satellite
Space probes
Scientific
Astronomical
Lunar programme
Interplanetary
Human
spaceflight
  • Future spacecraft initalics.
January
February
March
April
May
June
July
August
September
October
November
December
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ).
Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).
Retrieved from "https://en.wikipedia.org/w/index.php?title=StudSat&oldid=1251369616"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp