Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Seohae Line

From Wikipedia, the free encyclopedia
Railway line in Gyeonggi-do and Seoul, South Korea
Seohae Line
Overview
Native name서해선
Seohaeseon
StatusOperational
OwnerKorea Rail Network Authority
Termini
Stations21
Service
Operator(s)Korail, SEO HAE RAIL CO.,LTD., ERAIL Co., Ltd.
Rolling stockKorail Class 391000
ITX-Maum
History
OpenedJune 16, 2018
Technical
Line length47 km (29 mi) (131 km, future)
Number of tracks2
Track gauge1,435 mm (4 ft 8 1⁄2 in)
Electrification25 kV 60 Hz AC
Seohae Line
Hangul
서해선
Hanja
西海線
Revised RomanizationSeohaeseon
McCune–ReischauerSŏhaesŏn

TheSeohae Line (Korean서해선) is a dual-track, electrified rail line in westernGyeonggi-do andSeoul,South Korea. The Seohae Line is being built in four sections simultaneously. The line runs 47 km (29 mi) south fromIlsan inGoyang City, crosses theHan River, passesGimpo Airport,Sosa,Siheung, and ends in Wonsi inAnsan. There is a transfer to different lines at Daegok, Neunggok, Gimpo Int'l Airport, Bucheon Stadium, Sosa and Choji.[1] There are currently 21 stations (Ilsan-Wonsi). The line is operated byKorail, but the stations between Sosa and Wonsi are managed by SEO HAE RAIL CO.,LTD., which is a subsidiary ofSeoul Metro.[2] The infrastructure is also owned byKorail so the line runs on the left like the rest of the South Korean mainline railway network.

History

[edit]

After the completion of planning, the project was written out as abuild–lease–transfer (BLT) project, andDaewoo was selected[3] as preferred bidder in September 2008.[1] Construction was scheduled to last from October 2009 to March 2013.[4] Due to theglobal financial crisis, it was difficult to gather investors to finance the project, and negotiations stalled.[1] An agreement was finally signed on December 21, 2010, with construction set to start in the first half of 2011.[1] Project costs are 1.5248 trillionSouth Korean won, the contractor has altogether seven years for design and construction, and will manage and maintain the line for the first 20 years of operation.[1]

The first section began construction in 2011 and opened on June 16, 2018.[5]

The second section runs north from Sosa toDaegok on theGyeongui-Jungang Line andSeoul Subway Line 3. There are transfers to several other lines. It was expected to open on June 29, 2021, but did not open until July 1, 2023.

Another extension (Daegok-Ilsan) was opened at the end of August 2023.

Future

[edit]

Another extension (Ilsan-Unjeong) was approved in January 2024.[6] There is currently no opening date noted.

On September 1, 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020. As part of the plan, the first section is to be further upgraded for 230 km/h (140 mph) the Wonsi–Hwayang extension is to be projected for 250 km/h (160 mph), and the line may seeKTX service.[7]

Tentative plans foresee the upgrade and incorporation of theGyooe Line, a single-track non-electrified line without passenger service that connectsNeunggok station (with a junction just before Daegok station) andUijeongbu station inUijeongbu. The Uijeongbu–Daegok–Sosa–Wonsi Line would then provide orbital metro service as a northern semicircle around Seoul, complementing the southern semicircle formed by theSuin–Bundang Line.

Another part of the tentative 2010 plans was a southern extension from Wonsi, connecting up with theJanghang Line before Hongseong station.[8][9] As of April 2023, the construction of this section was 92% completed and expected to be opened in the second half of 31 October 2024.[10]

Rolling stock

[edit]

Map of the Seohae Line and other surrounding lines

[edit]

Map

Stations

[edit]

Urban section

[edit]

The section from Sosa to Wonsi opened on June 16, 2018. The first phase (Sosa to Daegok) of the Sosa to Ilsan extension opened on July 1, 2023. The second phase (Daegok to Ilsan) of the Sosa to Ilsan extension opened on August 26, 2023. The line currently utilizes seven four-carClass 391000 trains manufactured byHyundai Rotem and ten four-carClass 391000 trains manufactured byDawonsys.

Station
number
Station name
English
Station name
Hangul
Station name
Hanja
TransferDistance
in km
Total
distance
Location
S07Ilsan일산Gyeongui–Jungang Line (Shared)---0.0Gyeonggi-doGoyang-si
S08Pungsan풍산1.91.9
S09Baengma백마1.73.6
S10Goksan곡산1.65.2
S11Daegok대곡Gyeongui–Jungang Line1.76.9
S12Neunggok능곡Gyeongui–Jungang Line1.88.5
S13Gimpo Int'l Airport김포공항Gimpo Goldline7.415.9SeoulGangseo-gu
S14Wonjong원종4.320.2Gyeonggi-doBucheon-si
S15Bucheon Stadium부천종합운동장2.122.3
S16Sosa
(Seoul Theological Univ.)
소사
(서울신대)
2.725.0
S17Sosaeul
(Bucheon Univ. Sosa Campus)
소새울
(부천대 소사캠퍼스)
---1.726.7
S18Siheung Daeya시흥대야2.128.8Siheung-si
S19Sincheon신천1.430.2
S20Sinhyeon신현3.333.5
S22Siheung City Hall시흥시청3.637.1
S23Siheung Neunggok시흥능곡1.338.4
S24Dalmi달미2.440.8Ansan-si
S25Seonbu
(Hando Hospital)
선부
(한도병원)
1.642.4
S26Choji초지Suin–Bundang Line1.744.1
S27Siu시우1.445.5
S28Wonsi원시1.547.0
S29Int'l Theme Park(April 2027)국제테마파크國際−Hwaseong-si
S30Seohwaseong(March 2026)서화성西華城

The line is being extended southward from Wonsi to Seohwaseongnamyang. Station names may be subject to change as the line is constructed and various sources give conflicting information.[11]

Conventional rail

[edit]

Opened on November 2, 2024.

Station nameTransferDistance in kmLocation
RomanizedHangulHanjaStation distanceTotal distance
Seohwaseong서화성西---0.0Gyeonggi-doHwaseong-si
Hwaseong City Hall화성시청7.37.3
Hyangnam향남11.418.7
Anjung안중Pyeongtaek Line19.137.8Pyeongtaek-si
Inju인주17.555.3Chungcheongnam-doAsan-si
Hapdeok합덕8.864.1Dangjin-si
Hongseong홍성Janghang Line24.688.7Hongseong-gun

See also

[edit]

References

[edit]
  1. ^abcde소사~원시 복선전철 내년 상반기 착공예정 (in Korean).The Chosun Ilbo. 2010-12-21. Retrieved2010-12-30.
  2. ^"소사원시운영(주)". Archived fromthe original on 2020-08-07. Retrieved2019-05-13.
  3. ^"Daewoo E&C Financial Statements 2008"(PDF).[permanent dead link]
  4. ^Daewoo E&CNon-Consolidated Financial Statements[permanent dead link] December 31, 2008 and 2007
  5. ^"서울 접근성 높인 소사원시선 역세권 아파트 'e편한세상 시흥'" (in Korean). Asiae. 2016-12-21. Retrieved2017-01-13.
  6. ^"[비전21뉴스] 파주시, 서해선(대곡-소사) 파주 연장 확정!".
  7. ^"Bullet trains coming to a town near you by 2020".JoongAng Daily. 2010-09-02. Retrieved2010-10-27.
  8. ^"South Korea's growing network".Railway Gazette International. 2008-09-08. Retrieved2010-08-29.
  9. ^Tebay, Andy (2023-07-03)."Seohae Line commuter rail extension opens in Seoul".International Railway Journal. Retrieved2023-07-30.
  10. ^철도공단 충청권 사업단, 8개 철도사업에 올해 7082억 투입 (in Korean). Rail Economy News. 2023-04-27. Retrieved2023-09-29.
  11. ^"대곡~소사 복선전철 마침내 첫삽, 2020년 개통". 22 December 2015.
Korail lines
Active
High-speed
Semi-high-speed1
Main
Branches
Metro
(Rapid transit)
Seoul Metropolitan Area
Busan–Gyeongnam Area
Daegu–Gyeongbuk Area

Future
Semi-high-speed
Metro (Rapid transit)
1: Lines for 200–300 km/h (high-speed rail internationally)
Railways
Main
High-speed rail
Metropolitan Subway
Suburban railways
Light Metro
Under construction
Planned
Main stations
Roads
Expressways
National roads
Local roads
Urban expressways
City routes
Buses
Areas
Major terminals
Airports
Related topics
Seoul
Metropolitan
Area
Urban (Subway)
Seoul
Incheon
Metropolitan
Light Metro
Seoul
Gyeonggi · Incheon
Airport rail link
Busan
Urban (Subway)
Metropolitan
Light Metro
Daegu
Urban (Subway)
Metropolitan
Gwangju
Daejeon
Italics : Under construction
Retrieved from "https://en.wikipedia.org/w/index.php?title=Seohae_Line&oldid=1274608115"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp