From Wikipedia, the free encyclopedia
(Redirected fromPleasant Street Portal)
Southern portal for the Tremont Street Subway

42°20′56″N71°03′58″W / 42.3490°N 71.0660°W /42.3490; -71.0660

ThePleasant Street incline orPleasant Street portal was the southern access point for theTremont Street subway inBoston, Massachusetts, which became part of theGreen Line after the incline was closed. The portal and the section of tunnel connecting it toBoylston served streetcars from 1897 to 1901, Main Line Elevated trains from 1901 to 1908, and streetcars again from 1908 to 1962. The Pleasant Street incline is now abandoned, but plans have been floated at various times to reuse it.

History

[edit]
Map of the portal area, showing the former street configuration
Pleasant Street portal in 1901 when the Main Line operated through the Tremont Street subway. An inbound Main Line (now Orange Line) test train is at the high platform at left, while an inbound trolley is on the right. This view faces south, away from the portal.
Looking south at theflying junction approaching the portal. The left branch goes to the inbound tracks from Shawmut Avenue/City Point and Tremont Street, the right branch to the outbound tracks to Shawmut Avenue/City Point (mid right) and Tremont Street (far right).

Early use

[edit]
Main article:Pleasant Street station (BERy)

The incline opened on October 1, 1897, one month after the first section of theTremont Street subway, allowingstreetcar lines fromRoxbury,Dorchester, and points south to operate via the subway. The new tunnel stretched from the outer tracks atBoylston south underTremont Street, with a four-track portal in the triangle bounded by Tremont Street, Pleasant Street (later part of Broadway), and Shawmut Avenue. The tunnel carried two tracks, splitting into four tracks at aflying junction near the portal, with the northbound (western) track going over the southbound (eastern) track. The two western tracks continued down Tremont Street, while the eastern tracks turned east on Pleasant Street via Broadway toCity Point inSouth Boston.

On June 10, 1901, streetcar service through the portal stopped, as theWashington Street Elevated (later part of theOrange Line) was connected to the two outermost tracks. El trains came out of the portal, stopped at a newPleasant Street station with a center island platform in an open cut, passed under Pleasant Street, and then rose onto an elevated structure. Many surface streetcar lines were truncated toDudley, the south end of the new El, until late November 1909.

After theWashington Street Tunnel opened on November 30, 1908, the elevated trains were rerouted through it, and the streetcars returned to the incline by their old routes, while the Pleasant Street station closed.

Decline

[edit]

On March 2, 1953, the City Point line was replaced by the9 bus route. The tracks to Tremont Street, formerly connected to the west tracks of the portal, were realigned to the east tracks, allowing a bus transfer station to be built where the west tracks had been. The Tremont Street line wasbustituted as the43 route on November 20, 1961, and a streetcar shuttle started between the portal and Boylston, with transfers to the subway. This shuttle was short-lived, ending with closure of the portal on April 6, 1962.[1]

The Pleasant Street portal is now covered by Elliot Norton Park at the intersection of Tremont Street, Shawmut Avenue, and Oak Street West.

Proposed reuse

[edit]
Silver Line Phase III alternatives. The Tremont Street alignment (yellow) would have reused the former streetcar tunnel for buses.

Reuse of part of the tunnel for theSilver Line Phase III was briefly considered, but the narrow bore was found too small for the Silver Line buses which (unlike trolleys) are not fixed to their guideway.[2] Plans for the Phase III tunnel were shifted further west to new alignments, then canceled due to questions over the project's cost-effectiveness.[3]

The 2003 Program for Mass Transportation included the possibility of converting the Washington Street section of theSilver Line toDudley Square to light rail (as had originally been promised) using the abandoned southern section of the subway to connect to thecentral subway at Boylston. However, the Phase III tunnel and continued bus service was recommended instead.[4] In 2012, the Roxbury-Dorchester-Mattapan Transit Needs Study recommended the conversion to light rail and reuse of the tunnel as a long-term project, with the additional possibility of extending the line down Blue Hill Avenue toMattapan along the #28 route.[5]

References

[edit]
  1. ^Belcher, Jonathan."Changes to Transit Service in the MBTA district"(PDF).Boston Street Railway Association.
  2. ^Bierman, Noah (26 December 2009)."Transit archeology: Tour of abandoned subway network offers a glimpse of how the T was built".Boston Globe. Retrieved7 August 2013.
  3. ^Mohler, David J. (9 July 2010)."Annual Status Report"(PDF). Massachusetts Bay Transportation Authority. Archived fromthe original(PDF) on 3 March 2016. Retrieved6 May 2013.
  4. ^"Chapter 5C: System Expansion"(PDF).Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. p. 5C-76. Archived fromthe original(PDF) on 6 February 2012. Retrieved6 May 2013.
  5. ^"Roxbury-Dorchester-Mattapan Transit Needs Study"(PDF). Massachusetts Department of Transportation. September 2012. p. 53. Retrieved7 May 2013.
Subway
(List of stations)
Heavy rail
Light rail
Infrastructure
Former lines
 Commuter Rail
(List of stations)
North Station lines
South Station lines
Former lines
Bus
Other services
Planned projects
Predecessors
Other
Retrieved from "https://en.wikipedia.org/w/index.php?title=Pleasant_Street_incline&oldid=1262876999"
Category:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp