Pemalang-Batang Toll Road | |
---|---|
Pematang Toll Road | |
![]() Pemalang-Batang Toll Road heading westbound in 2023 | |
Route information | |
Part of![]() | |
Maintained by PT Pemalang Batang Tol Road | |
Length | 39 km (24 mi) |
Existed | 2018–present |
Major junctions | |
West end | Pemalang |
Major intersections | |
East end | Batang |
Location | |
Country | Indonesia |
Major cities | |
Highway system | |
Pemalang-Batang Toll Road or abbreviated toPematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang,Central Java,Indonesia. This toll road is part ofTrans-Java Expressway which will connectMerak toBanyuwangi of the island ofJava. The toll road is fully opened on November 9, 2018, by 7th President of IndonesiaJoko Widodo.[1][2]
This toll road has two sections:[3]
Note: The number on the exits is based on the distance from the western terminus of theJakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Central Java | Taman,Pemalang Regency | 0 | 0.0 | 312 | Pemalang Toll Gate | Western terminus | |
Bojong,Pekalongan Regency | 19.14 | 11.89 | 331 | Bojong Toll Gate | |||
Warungasem,Batang Regency | 29.74 | 18.48 | 341 | Batang Toll Gate | |||
Kandeman,Batang Regency | 36.48 | 22.67 | 348 | Kandeman Toll Gate |
| Eastern terminus | |
36.60 | 22.74 | ![]() | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|