Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Pasar Klang LRT station

From Wikipedia, the free encyclopedia
Metro station in Selangor, Malaysia
 SA18  Pasar Klang
Rapid KL Logo |FutureLRT station
General information
LocationKlang,Selangor
Malaysia
Owned byPrasarana Malaysia
Operated byRapid Rail
Line(s)Rapid KL (brand)11Shah Alam
Platforms2side platforms
Tracks2
Construction
Structure typeElevated
ParkingAvailable
Other information
StatusUnder construction
Station code SA18 
History
Previous namesPasar Besar Klang
Services
Preceding stationFollowing station
Bandar Baru KlangShah Alam Line
Future service (opening 2025)
Jalan Meru

ThePasar Klang LRT station is alight rapid transit (LRT)station that serves the suburb of Kawasan 17Klang inSelangor,Malaysia. It is one of the stations on theShah Alam line. The station is an elevatedrapid transit station inKlang,Selangor,Malaysia, forming part of theKlang Valley Integrated Transit System.[1]

The station is marked as Station No. 18 along the RM9 billion line project with the line's maintenancedepot located in Johan Setia,Klang. Originally this LRT station was expected to be operational in February 2024, however the operational date for the entireShah Alam Line has been delayed and expected to be operational bythird quarter of 2025 as mentioned by Transport MinisterAnthony Loke. (previously expected to be operational by March 2025 as announced in 2023)[2] It will have facilities such as a multi-story park and ride, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[3]

Locality landmarks

[edit]
  • Pasar Besar Klang
  • Klang Parade
  • TM Point Klang
  • Taman Bunga Melor, Klang
  • Batu Belah
  • Mutiara Bukit Raja
  • Bandar Bukit Raja

References

[edit]
  1. ^"Pelan Setiap Stesen". Prasarana Malaysia. Archived fromthe original on 2015-05-22. Retrieved2015-05-17.
  2. ^"LRT3 Expected To Be Operational In Q3 Of 2025 - Loke".BERNAMA. 2024-07-29. Retrieved2024-07-29.
  3. ^"Jangka Masa Projek LRT3". Prasarana Malaysia. Archived fromthe original on 2015-05-27. Retrieved2015-05-17.

External links

[edit]
Phase 1

Opening 30 September 2025
Phase 2

Opening 2027
Opening 2028-2030
Stations and services initalics are planned or under construction


Stub icon

This Malaysian rapid transit article is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Pasar_Klang_LRT_station&oldid=1271220590"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp