Ontario Highway 40

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
(Redirected fromOntario Highway 40A)
Ontario provincial highway

Highway 40 marker
Highway 40
Map
Highway 40 highlighted in red
Route information
Maintained by theMinistry of Transportation of Ontario
Length91.4 km[2] (56.8 mi)
ExistedMarch 28, 1934[1]–present
Major junctions
South end Highway 401 inChatham-Kent
North end Highway 402 inSarnia
Location
CountryCanada
ProvinceOntario
Highway system
Highway 37Highway 41
Former provincial highways
←  Highway 39

King's Highway 40, commonly referred to asHighway 40, is aprovincially maintained highway in thesouthwestern portion of theCanadian province ofOntario. The 91.4-kilometre (56.8 mi) route linksChatham andSarnia viaWallaceburg, following close to theSt. Clair River. The southern terminus is atHighway 401 south of Chatham, while the northern terminus is atHighway 402 in Sarnia. The portion of Highway 40 between Highway 401 and north of Wallaceburg is within the municipality ofChatham-Kent, while the portion north of there is withinLambton County.

Highway 40 was built as adepression-relief project in 1934. The original routing followed what is now theSt. Clair Parkway, but was rerouted to create that scenic road in the mid-1970s. The Sarnia Bypass was opened in 1963 asHighway 40A and renumbered as Highway 40 by 1966; the original route through Sarnia becameHighway 40B until it was decommissioned during the early-1990s. The route was extended toHighway 3 inBlenheim during the early 1970s; however this section was decommissioned during theOntario highway transfers in 1998.

Route description

[edit]
Highway 40 south of Chatham, approaching Highway 401

Highway 40 begins at aninterchange with Highway 401 (Exit 90) southeast of the urban centre ofChatham, within the municipality ofChatham-Kent.[3]Southwest of the interchange is C. M. Wilson Conservation Area, a 30-hectare (74-acre) campground named for the former Chair of Directors of theLower Thames Valley Conservation Authority, Clarence Michael Wilson.[4]The highway proceeds northwest as Communication Road, passing between farmland on the outskirts of Chatham. It crosses aCanadian National Railway (CN) mainline followed by theThames River, then turns southwest onto Grand Avenue East and crosses aCanadian Pacific (CP) railway line. The highway progresses from the outskirts of Chatham to downtown before turning onto St. Clair Street and travelling northwest. It encounters theNortown Centre mall as it passes through the suburbs and eventually leaves the city.[3][5]

TheAfrican-Canadian Heritage Tour (ACHT) follows a portion of Highway 40 from Highway 401 to Chatham-Kent Road 29 (Countryview Line) atOungah, where it turns east towardsDresden.[6]The ACHT was begun in 1991, and by 1997 was the most successful heritage tour in North America.[7]However, under a new tourism signage policy, markers signing the ACHT were removed from Highway 40 in 1998.[8]

Oungah is the only community between Chatham and Wallaceburg, where the highway divides a large swath of farmland established in the fertile soils of the region.[9]Immediately southeast of Wallaceburg, the highway turns to the north and becomes known as Murray Street. As it enters the town, it turns onto McNaughton Avenue and crosses aCSX railway line then theSydenham River. The route turns west onto Dufferin Avenue and proceeds out of the town, crossing the CSX railway a second time. After crossing anirrigation canal, Highway 40 turns north onto Arnold Road and crosses the CSX railway a third and final time before exiting Chatham-Kent.[3][5]

Highway 40 north of Wallaceburg

The route entersLambton County in the municipality ofSt. Clair, passing through more farmland.[3] Seven kilometres (4.3 mi) north of the county line, the highway crosses theW. Darcy McKeough Floodway, a channel constructed in 1984 to protect Wallaceburg from flooding.[10]Highway 40 continues north, parallel to and several kilometres east of theSt. Clair River. AtBickford, it swerves slightly to the east while passing between the CF Industries nitrogen fertilizer plant to the west and Bickford Oak Woods Provincial Conservation Reserve to the east.[3][11]As the highway approaches the south end of Sarnia, it widens into a divided four-lane expressway and passes through Chemical Valley, the location of several industrial plants.[12][13]The route entersAamjiwnaang First Nation at La Salle Line where the surroundings abruptly switch to forest from a mix of industry and farmland.[3][5]

At the intersection with Churchill Line, Highway 40 enters theSarnia city limits and turns east onto the Sarnia Bypass, a four lane divided expressway. Approximately three kilometres (1.9 mi) east of the intersection, the highway narrows back to a two lane road. Soon thereafter, it gently curves to the north, intersecting Plank Road and becoming Modeland Road. It passes along the western edge of theSarnia Photovoltaic Power Plant, the largest photovoltaic (solar) power plant in the world in 2010.[14]The route passes above a CN andVIA rail line as it travels along the easternrural–urban fringe of the city. After a signalized intersection with Wellington Street, Highway 40 widens to a divided four lane expressway once more just prior to a Parclo A2 interchange with London Line (formerHighway 7), then ends at a Parclo B4 interchange with Highway 402 (Exit 6). Modeland Road narrows back to a two lane road and continues north asLambton County Road 27.[3][5]

History

[edit]
George Doucett, Minister of Highways, cuts a ribbon to officially open the completed Highway 40 in Corunna on October 27, 1943.

Highway 40 was established at the height of theGreat Depression, during the spring of 1934. The subsequent improvement of the roadway employed several dozen men eight hours per day, six days per week atminimum wage as a depression-relief project.[15]It was created by the assumption of the St. Clair River Road, as well as several lengths ofconcession road created as a result ofstatute labour by adjacent settlers as part of the requirements to secure a land deed. On March 28, the road connecting Chatham with Wallaceburg was assumed by theDepartment of Highways (DHO) and designated King's Highway 40. Just over a month later, on May 2, the DHO assumed the route between Wallaceburg and Sarnia known today as theSt. Clair Parkway. The 80.6-kilometre (50.1 mi) route connected Highway 2 in Chatham with Highway 7 andHighway 22 in Sarnia.[1]The designation came just weeks before the1934 Ontario general election, which sawLambton West incumbent ConservativeMember of the Legislative AssemblyAndrew Robinson McMillen replaced by LiberalWilliam Guthrie. As such, it was seen as a fruitless last-ditch attempt to garner votes.[16][17]

Sarnia Bypass

[edit]
Highway 402 facing east towards the Modeland Road intersection in 1959. In the distance beyond the intersection, the two carriageways converge into Highway 7. Modeland Road was reconstructed as an interchange by 1963.

In the decade followingWorld War II, automobile use in North America increased dramatically, inundating many highways on the approach to and within urbanized areas with heavy traffic. As a result,freeways andbypasses were constructed throughout the province, allowing drivers not destined for those locations avoid congestion. In 1957, the DHO announced that Highway 402 would be extended east of Sarnia toLondon, starting with the construction of an interchange at Modeland Road to replace the at-grade intersection, although Highway 402 would continue to default to Highway 7 for the near future as the rest of the extension was still being planned.[18]This interchange would serve as the terminus for a new bypass of Sarnia, as in 1980 a second overpass was built at this interchange during the twinning of Highway 40 to Wellington Street.[19]

On May 1, 1963, portions of Modeland Road and Churchill Line were taken over by the DHO and numbered as Highway 40A.[20]These roads were reconstructed over the following year to provincial standards. On October 25, 1963, the Sarnia Bypass was opened to traffic.[21]Further construction was carried out until late 1965 to grade the route for future widening and build an overpass of the CN Railway south of Confederation Line,[22]after which the bypass was renumbered as the northern end of Highway 40;[23]the former route on the west side of Sarnia, via Brock Street, Vidal Street and Front Street, was subsequently renumbered Highway 40B.[24][25]

In 1972, as part of the eventual extension to Highway 401 inLondon, Highway 402 east of the Murphy Road overpass was re-aligned so it no longer defaults to Highway 7 but instead bypasses the existing interchange with Highway 40 constructed in 1963-64.[26] In turn, Highway 7 (London Line) was redirected to connect with Exmouth Street to make for a continuous arterial road, which led to the two-lane residential portion of Exmouth Street being bypassed. Opened in 2002, Quinn Street follows the former alignment of Highway 402.[27]For the realigned Highway 402, a new interchange was constructed with Highway 40 just north of the original interchange.[26]

The St. Clair River Road near Courtright circa 1900

St. Clair Parkway

[edit]
Main article:St. Clair Parkway

During the late-1950s, theSt. Lawrence Seaway project created a navigablelock system between the Atlantic Ocean and Lake Superior, while simultaneously reclaiming properties along the shoreline to create a continuous parkway. Seeing the potential tourist draw, several groups and organizations, including the district Chamber of Commerce, convened at the second annual conference of the Southwestern Ontario Chambers of Commerce and Boards of Trade in February 1960. Several resolutions were passed, calling for the DHO to create a new Highway 40 several kilometres inland from the St. Clair River and to have the old highway rebuilt as a scenic route.[28]These resolutions were echoed by Lambton County Council and the 21 municipalities in the county.[29]

Plans for the parkway were crafted over the next several years before being presented to minister of highwaysCharles MacNaughton in the spring of 1965.[30]Subsequently, the St. Clair Parkway Commission was formed in 1966.[31]Around this time, several large chemical refineries, includingUnion Carbide andS.O.A.P. were built south of Sarnia along the future highway corridor, an area known since the 1940s asChemical Valley.[32][33]Following several years of negotiations with the Aamjiwnaang First Nation (then the Chippewas of Sarnia),[34][35]construction of the new inland route of Highway 40 began in July 1972.[36]Working south from Sarnia, the first contract reached as far south as Highway 80 (Courtright Line), a distance of 13.4 km (8.3 mi).[37]A second contract, awarded in 1974, extended construction south an additional 11.0 km (6.8 mi) toLambton County Road 2 (Bentpath Line) nearSombra.[38]The third and final contract was awarded in late 1975 to complete the remaining 13.2 km (8.2 mi) south of County Road 2.[39][40]

The new Sarnia–Wallaceburg highway was opened to traffic as each contract was completed. The section from Sarnia to Highway 80 was opened in August 1975,[39]and the section from Highway 80 to Sombra by mid-1977.[41]The entireC$12.6 million ($58.9 million in 2023 dollars)[41][42] project was opened ceremoniously by Highway MinisterJames Snow on November 25, 1977; he was late to the ceremony due to a snowstorm.[43]The old alignment was transferred to the St. Clair Parkway Commission between Sarnia and Sombra in 1979,[44][45]and from Sombra to Dufferin Avenue (oppositeWalpole Island) by 1982.[46]The remaining 3.0 km (1.9 mi) along Dufferin Avenue to the new Highway 40 was decommissioned between 1984 and 1986. Lambton County designated its portion of the former highway as County Road 33.[47][48]

Kent County

[edit]

Within Wallaceburg, Highway 40 originally followed Murray Street, King Street, McDougal Street across theSydenham River and James Street. When theLord Selkirk Bridge was opened November 23, 1950, the highway was rerouted along McNaughton Avenue and across the new bridge.[49][50]In 1975, the alignment was briefly changed to Murray Street and theone-way pairing of Wellington and James Streets while the Lord Selkirk Bridge was rehabilitated and McNaughton Avenue widened to four lanes.[51]

Within Chatham, Highway 40 originally followed St. Clair Street and Thames Street to intersect Highway 2 at Fifth Street adjacent to the Thames River.[52]By 1940, it had been rerouted across the Third Street bridge and along Raleigh Street to end at Richmond Street.[53]Despite the opening of Highway 401 south of Chatham on October 25, 1963,[54]Highway 40 was not extended south of Chatham until the end of the decade.[55]

In spring of 1969, the DHO assumed Communication Road south of Highway 401 toHighway 3 in Blenheim,[56]in exchange forHighway 98, which became Kent County Road 8. Communication Road was numbered Highway 40 in July 1970, although there was no signed connection between Highway 401 and Chatham.[57]The 1971 Ontario Road Map indicates that this gap had been closed, with Highway 40 following Richmond Street, Queen Street, and Park Avenue East to Communication Road.[58]Along with the completion of the St. Clair Parkway, the route was now 103.1 km (64.1 mi) long.[59]

Downloads

[edit]

As part of a series of budget cuts initiated by premierMike Harris under hisCommon Sense Revolution platform in 1995, numerous highways deemed to no longer be of significance to the provincial network were decommissioned and responsibility for the routes transferred to a lower level of government, a process referred to as downloading. Highway 3 was downloaded betweenLeamington and west ofSt. Thomas, rendering Highway 40 south of Highway 401 redundant. Accordingly, Highway 40 was transferred toKent County on January 1, 1998.[60]

Major intersections

[edit]

The following table lists the major junctions along Highway 40, as noted by theMinistry of Transportation of Ontario.[2] 

DivisionLocationkm[2]miDestinationsNotes
Chatham-KentBlenheim−9.7−6.0 Municipal Road 3 /Municipal Road 11 (Marlborough Street / Chatham Street)Former Highway 40 southern terminus; formerlyHighway 3; former Highway 40 follows present-day Municipal Road 11 north
−9.4−5.8 Municipal Road 19 (Talbot Street)
Kent Centre0.00.0 Highway 401Windsor,London
 Highway 40 begins
 Chatham-Kent Municipal Road 11 ends
Highway 40 southern terminus; Highway 401 exit 90
 1.50.93 Municipal Road 14 (Creek Road / Pinehurst Line)
5.33.3 Municipal Road 18 east (Fairview Line)
Chatham6.33.9 Municipal Road 18 west (Park Avenue)
6.44.0 Municipal Road 39 east (River Line) / Colborne Street
7.44.6 Municipal Road 30 north (Prince Albert Road)
 Municipal Road 2 east (Longwoods Road)
FormerlyHighway 2 east; former southern end of Highway 2 concurrency
12.17.5 Municipal Road 2 west (Grand Avenue)FormerlyHighway 2 west; former northern end of Highway 2 concurrency
 19.111.9 Municipal Road 35 (St. Andrews Line / Eberts Line)
Oungah23.414.5 Municipal Road 29 (Countryview Line) –Dresden
 30.519.0 Municipal Road 42 (Electric Line / Oldfield Line)
Wallaceburg38.023.6 Municipal Road 15 east (Baseline)
39.624.6 Municipal Road 78 east –DresdenFormerlyHighway 78 east
42.226.2 Municipal Road 33 (Dufferin Avenue)ToSt. Clair Parkway
LambtonSt. Clair49.030.4 County Road 1 west (Lambton Line) –Port Lambton
53.133.0 County Road 28 west (Holt Line)
55.834.7 County Road 2 (Bentpath Line)
66.641.4 County Road 80 (Courtright Line) –Courtright,BrigdenFormerlyHighway 80
74.646.4 County Road 4 (Petrolia Line) –Corunna,Petrolia
Sarnia77.348.0 County Road 35 west (La Salle Street)Sarnia city limits
80.149.8Churchill LineFormerlyHighway 40B north; Highway 40 follows Churchill Line east
82.851.4 County Road 29 north (Indian Road)
85.252.9 County Road 20 (Plank Road)Churchill Line becomes Modeland Road
87.954.6 County Road 25 (Confederation Street)
90.756.4 County Road 22 (London Line) –LondonInterchange; formerlyHighway 7
91.456.8 Highway 402London,Bridge toU.S.A.
 County Road 27 north (Modeland Road)
Highway 40 northern terminus; Highway 402 exit 6
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Closed/former
  •       Route transition

Suffixed routes

[edit]

Highway 40A

[edit]
Highway 40A marker
Highway 40A
LocationChurchill Road, Modeland Road
Length8.0 km[20] (5.0 mi)
ExistedMay 1, 1963[20]–late 1965[23][24]

See#Sarnia Bypass

Highway 40A was the temporary designation for the Sarnia Bypass between its assumption by the DHO on May 1, 1963,[20] and its completion in late 1965.[23] The DHO maintained the 8.0 km (5.0 mi) portion from the Sarnia city limits at Indian Road to Highway 402. When the bypass was completed, it was renumbered as Highway 40.[24][25]

Highway 40B

[edit]
Highway 40B marker
Highway 40B
LocationVidal Street, Christina Street
Length8.0 km[59] (5.0 mi)
ExistedLate 1965[23][24]–1993

Highway 40B was the designation of the former route of Highway 40 through downtown Sarnia following the opening of the Sarnia Bypass in late 1965.[23][24] The route followed Vidal Street from Churchill Road northeast, crossing the entrance to theSt. Clair Tunnel just south of Campbell Street. It continued along Vidal to Wellington Street, where it turned west then north along Front Street to Highway 402.[61]The following year, Highway 40B was rerouted from Vidal Street along Confederation Street west to Christina Street and north to Wellington Street.[25]On August 24, 1979, the Donahue Bridge was opened over the St. Clair Tunnel, and Vidal Street split into a one-way pair with Brock Street to the north of the bridge.[62]Highway 40B was rerouted along the one-way pairing to London Road then west to Front Street by 1980.[63]It remained this way until some point between 1992 and 1996, when it was decommissioned as a provincial highway.[64][65]

Highway 40C

[edit]
Highway 40C marker
Highway 40C
LocationCromwell Street, Front Street
Length2.2 km[61] (1.4 mi)
Existed1963–1965

Highway 40C was signed along Cromwell Street and Front Street in downtown Sarnia briefly during the mid-1960s. It was extended from Exmouth Street to Highway 402 on January 6, 1964.[66]The 1965 DHO Annual Report indicates that the route began at Vidal Street and ended at Errol Road (which intersects Christina Street but not Front Street), while the 1965 Ontario Road Map indicates that the portion of Front Street north of Exmouth Street was part of Highway 40C.[61] The route does not appear on any other official road maps.

References

[edit]
  1. ^ab"Appendix No. 4 – Schedule of Assumptions and Reversions of Sections of the King's Highway System for the Year 1934".Annual Report (Report). Department of Highways. March 31, 1935. pp. 119–120. RetrievedFebruary 3, 2021 – via Internet Archive.
  2. ^abMinistry of Transportation of Ontario (2016)."Annual Average Daily Traffic (AADT) counts". RetrievedJanuary 1, 2021.
  3. ^abcdefgOntario Back Road Atlas (Map). Cartography byMapArt. Peter Heiler. 2010. pp. 6, 12. §§ T7–B10.ISBN 978-1-55198-226-7.
  4. ^"C. M. Wilson Conservation Area". Lower Thames Valley Conservation Authority. Archived fromthe original on April 19, 2014. RetrievedJanuary 15, 2014.
  5. ^abcd"Highway 40 – Length and Route" (Map).Google Maps. RetrievedDecember 30, 2020.
  6. ^Ontario Road Map (Map). Cartography by Surveys and Mapping Section. Ministry of Transportation. 1997. § M3.
  7. ^Harding-Davis, Elise (August 2, 1997). "Emancipation Celebrates Heritage".The Windsor Star. p. A9.
  8. ^Bradt, Sandra (July 30, 1998). "Sign for Historic Site Affected by Government".The Windsor Star. p. A7.
  9. ^Mann, Alan; Mann, Frank (1984).Settlement on the Sydenham: A Story of Wallaceburg(PDF). Standard Press. p. 10. RetrievedDecember 30, 2020.
  10. ^Phair, John (June 21, 2011)."McKeough Floodway controversial but has done its job, SCRCA says".Today's Farmer. Canoe Sun Media. Archived fromthe original on June 5, 2015. RetrievedJanuary 15, 2014.
  11. ^"Plants: Courtright, Ontario". CF Industries Holdings. Archived fromthe original on February 27, 2014. RetrievedJanuary 15, 2014.
  12. ^Morden, Paul (July 10, 2013)."New frack tower part of $250-million upgrading for Corunna plant".The Sarnia ObservEr. Canoe Sun Media. RetrievedJanuary 15, 2014.
  13. ^The Sarnia-Lambton Petrochemical & Refining Complex(PDF) (Report). Sarnia-Lambton Economic Partnership. 2018. RetrievedFebruary 24, 2021.
  14. ^CBC News (October 4, 2010)."Enbridge completes Sarnia solar farm". Canadian Broadcasting Corporation. RetrievedOctober 5, 2010.
  15. ^"Report of Chief Engineer".Annual Report (Report). Department of Highways. March 31, 1935. p. 96. RetrievedFebruary 3, 2021 – via Internet Archive.
  16. ^Deziel, Paul (November 10, 1934)."Historic Shores of River St. Clair".The Border Cities Star. p. 1, Section Three. RetrievedFebruary 27, 2021.
  17. ^Sarnia Bureau (May 14, 1934)."William Guthrie Named by West Lambton Liberals".The Border Cities Star. Vol. 32, no. 64. p. 15. RetrievedMarch 2, 2021 – via Newspapers.com.
  18. ^"Sarnia Link to 401 Project".Windsor Daily Star. September 12, 1957. p. 20.
  19. ^"Highway District Reports – District 1 – Chatham". Annual Report (Report). Department of Highways. March 31, 1963. p. 77.
  20. ^abcd"Appendix No . 3C Schedule of Existing Roads Assumed". Annual Report (Report). Department of Highways. March 31, 1963. p. 271.
  21. ^A.A.D.T. Traffic Volumes 1955–1969 And Traffic Collision Data 1967–1969. Ontario Department of Highways. 1970. pp. 80–81.
  22. ^"Tender Date for Highway 40-A Job Unknown".Windsor Daily Star. November 24, 1964. p. 5.
  23. ^abcde"Sarnia Ambulance Board Asks Subsidy Aid".Windsor Daily Star. December 18, 1965. p. 7.
  24. ^abcdeAnnual Report (Report). Department of Highways. March 31, 1965. p. 15.Upon completion of the present work, the new highway will be signed as Highway 40, at which time the former route of Highway 40 through the business section of Sarnia will be signed as Highway 40B.
  25. ^abcOntario Road Map (Map). Cartography by K.G. Gould. Ontario Department of Highways. 1966. § W17–Y18.
  26. ^abHighway Construction Program: King's and Secondary Highways. Ministry of Transportation and Communications. 1972–1973. p. xi.
  27. ^"Quinn Drive – Former Highway 402 alignment" (Map).Google Maps. RetrievedJune 24, 2010.
  28. ^"Chambers Support Parkway".The Windsor Star. March 1, 1960. p. 3. RetrievedAugust 21, 2012 – via Newspapers.com.
  29. ^Bennie, Jim (December 8, 1960)."Area Chambers Support Back New Highway, Parkway".The Windsor Star. p. 1. RetrievedJanuary 26, 2021.
  30. ^Stewart, Bill (March 12, 1965)."MacNaughton to See St. Clair Parkway Plans".The Windsor Star. p. 3. RetrievedAugust 21, 2012.
  31. ^Morden, Paul (January 19, 2009)."Parkway History Needs a Home".The Observer. Sarnia: Canoe Sun Media. Archived fromthe original on June 14, 2015. RetrievedJune 12, 2015.
  32. ^Staff (January 2, 1974). "Zoning May Affect SOAP".The Windsor Star. p. 7.
  33. ^Ford, R. W. (1987)."History of the Chemical Industry in Lambton County". Sarnia Historical Society. RetrievedJanuary 15, 2021.
  34. ^McConnell, Brian (September 15, 1969). "Indian Objections May Stall Sarnia–London".The Windsor Star. p. 7.
  35. ^Staff (May 1, 1970). "Vote Approves Indian Land Sale".The Windsor Star. p. 7.
  36. ^Staff (April 25, 1973). "Work Expected to Resume on First Leg of Highway 40".The Windsor Star. p. 3.
  37. ^Highway Construction Program. Ministry of Transportation and Communications. 1972–73. p. ix.
  38. ^Highway Construction Program. Ministry of Transportation and Communications. 1975–76. p. x.
  39. ^abStaff (November 8, 1977). "Official Opening Set for New Highway 40".The Windsor Star. p. 11.
  40. ^Gervais, Marty (January 15, 1975). "Ontario Study May Determine Highway Route".The Windsor Star. p. 3.
  41. ^abSommers, Joanne (June 4, 1977). "Key Sarnia-Wallaceburg Link: New Highway May Pump New Life Into Business and Industry".The Windsor Star. p. 23.
  42. ^1688 to 1923: Geloso, Vincent,A Price Index for Canada, 1688 to 1850 (December 6, 2016). Afterwards, Canadian inflation numbers based onStatistics Canada tables 18-10-0005-01 (formerly CANSIM 326-0021)"Consumer Price Index, annual average, not seasonally adjusted". Statistics Canada. RetrievedApril 17, 2021. and table 18-10-0004-13"Consumer Price Index by product group, monthly, percentage change, not seasonally adjusted, Canada, provinces, Whitehorse, Yellowknife and Iqaluit".Statistics Canada. Retrieved2024-05-08.
  43. ^Staff (November 26, 1977). "Highway Opening Delayed By Snow".The Windsor Star. p. 7.
  44. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1978–79. § L–M18.
  45. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1980. § L–M18.
  46. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1982–83. § L–M18.
  47. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1984–85. § L–M18.
  48. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1986–87. § L–M18.
  49. ^Staff (November 16, 1950)."New Wallaceburg Bridge to Be Opened Nov. 23".The Windsor Star. p. 5. RetrievedJanuary 16, 2022 – via Newspapers.com.
  50. ^Staff (November 24, 1950)."New Bridge Dedicated By Pioneer".The Windsor Star. p. 5. RetrievedJanuary 16, 2022 – via Newspapers.com.
  51. ^Staff (October 30, 1975)."Streets Nearly Finished".The Windsor Star. p. 5. RetrievedJanuary 16, 2022 – via Newspapers.com.
  52. ^Ontario Road Map (Map). Cartography by D. Barclay. Ontario Department of Highways. 1937–38. Chatham inset.
  53. ^Ontario Road Map (Map). Cartography by D. Barclay. Ontario Department of Highways. 1940–41. Chatham inset.
  54. ^"District No. 1 – Chatham". Annual Report (Report). Department of Highways. March 31, 1964. p. 71.
  55. ^Ontario Road Map (Map). Cartography by Photogrammetry Office. Ontario Department of Highways. 1969. Chatham inset.
  56. ^Staff (June 13, 1969). "Communication Road Now Provincial".The Windsor Star. p. 5.
  57. ^Staff (July 24, 1970). "Did You Know the County Now Has 2 Highway 40s?".The Windsor Star. p. 5.
  58. ^Ontario Road Map (Map). Cartography by Photogrammetry Office. Ontario Department of Highways. 1971. Chatham inset.
  59. ^abTransportation Capital Branch (1989).Provincial Highways Distance Table. Ministry of Transportation of Ontario. pp. 60–61.ISSN 0825-5350.
  60. ^Highway Transfers List – "Who Does What" (Report). Ministry of Transportation of Ontario. June 20, 2001. p. 8.
  61. ^abcOntario Road Map (Map). Cartography by C.P. Robins. Ontario Department of Highways. 1965. Sarnia inset.
  62. ^Staff (August 12, 1979). "Final Bridge Paving to Start Wednesday".The Windsor Star. p. 7.
  63. ^Ontario Road Map (Map). Cartography by Cartography Section. Ministry of Transportation and Communications. 1980–81. Sarnia inset.
  64. ^Ontario Road Map (Map). Cartography by Cartographic Mapping Unit. Ministry of Transportation. 1992–93. Sarnia inset.
  65. ^Ontario Road Map (Map). Cartography by Geomatics Office. Ministry of Transportation. 1997. Sarnia inset.
  66. ^"Appendix No. 3A – Schedule of Designations and Redesignations of Sections of the King's Highway, Secondary Highway and Tertiary Road Systems for the Fiscal Year". Annual Report (Report). Department of Highways. March 31, 1964. p. 268.

External links

[edit]
Template:Attached KML/Ontario Highway 40
KML is from Wikidata
Current highways
400-series highways
Former highways
Proposed
Secondary highways
By district
            Tertiary roads