This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Ohio State Route 18" – news ·newspapers ·books ·scholar ·JSTOR(July 2010) (Learn how and when to remove this message) |
Route of SR 18 highlighted in red | ||||
Route information | ||||
Maintained byODOT | ||||
Length | 197.39 mi[1] (317.67 km) | |||
Existed | 1924–present | |||
Major junctions | ||||
West end | ![]() | |||
Major intersections | ||||
East end | ![]() | |||
Location | ||||
Country | United States | |||
State | Ohio | |||
Counties | Defiance,Henry,Wood,Hancock,Seneca,Sandusky,Huron,Lorain,Medina,Summit | |||
Highway system | ||||
| ||||
|
State Route 18 (SR 18) is an east–west highway in northernOhio. It is the sixth longest state route in the state. Its western terminus is at theIndiana state line nearHicksville, where the route continues in Indiana asState Road 8, and its eastern terminus is atState Route 91 inAkron.
State Route 18 was an original state highway that went from Norwalk to thePennsylvania state line. The route was extended to the Indiana state line in 1926. Until 1950, it was one of a very few Ohio routes to end at two state lines.
State Route 18's extension to the Indiana state line originally overlappedState Route 2 from the line to Hicksville. In 1940, State Route 18 was rerouted on the formerState Route 193 from the line to Hicksville.
In 1950, State Route 18's eastern terminus was moved toYoungstown. Its old route to the Pennsylvania state line was recertified asState Route 289.
In 1966, the route was routed alongState Route 8 and Interstate 80S (nowInterstate 76) to Youngstown. This series of concurrencies ended in 1971, and State Route 18 would eventually be routed along Market Street in Akron, to end at its current terminus.
In 1969, State Route 18 was routed concurrently with U.S. Route 20 along the Norwalk Bypass, a limited access freeway. Prior to the Bypass route, State Route 18 followed Main Street and Woodlawn Avenue (formerly known as Medina Street) and later followed Main Street and Akron Road through the city ofNorwalk (much of this alignment was already concurrent with US 20).
Before the rerouting of SR 18 via SR 8 and I-80S, SR 18 left West Market Street at Twin Oaks Drive in West Akron, where it went a few blocks east to North Portage Path, then jogged 1 block north to Memorial Parkway, which became Tallmadge Avenue east of the Cuyahoga River (before that, SR 18 continued along Market Street, then joined with SR 8 before reaching Tallmadge Avenue).
Tallmadge Road was a straight east/west road which became Mahoning Avenue as it approached the Youngstown area.
Most stretches of former SR 18 are still referred to as County Road 18 in Portage and Mahoning Counties.
SR 18 was realigned aroundNorth Baltimore on a two-lane 2.2-mile-long (3.5 km) bypass completed in 2012.[2] The new bypass, which included aroundabout at the eastern transition to the original route, was built to facilitate traffic to a newCSX rail yard inHenry Township. The old route through North Baltimore became signed asSR 18 Business.[2]
County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Defiance | Hicksville Township | 0.00 | 0.00 | ![]() ![]() | Indiana state line |
Hicksville | 3.10 | 4.99 | ![]() ![]() ![]() ![]() | Western end of SR 2 / SR 49 concurrency | |
3.52 | 5.66 | ![]() ![]() ![]() ![]() | Eastern end of SR 2 / SR 49 concurrency | ||
Sherwood | 14.12 | 22.72 | ![]() | ||
Noble Township | 22.30 | 35.89 | ![]() ![]() | Western end of SR 15 concurrency | |
Defiance | 23.57 | 37.93 | ![]() | Exit 25 (US 24) | |
24.58 | 39.56 | ![]() ![]() | Western end of SR 66 concurrency | ||
25.22 | 40.59 | ![]() ![]() | Northern terminus of SR 111 | ||
25.36 | 40.81 | ![]() ![]() | Eastern end of SR 66 concurrency | ||
25.85 | 41.60 | ![]() ![]() | Eastern end of SR 15 concurrency | ||
27.29 | 43.92 | ![]() ![]() ![]() ![]() | Western end of SR 281 concurrency | ||
Richland Township | 28.93 | 46.56 | ![]() ![]() | Eastern end of SR 281 concurrency | |
Henry | Holgate | 38.30 | 61.64 | ![]() | |
Monroe–Marion township line | 43.26 | 69.62 | ![]() ![]() | Western end of SR 109 concurrency | |
Hamler | 44.70 | 71.94 | ![]() ![]() | Eastern end of SR 109 concurrency | |
Bartlow Township | 49.85 | 80.23 | ![]() ![]() ![]() | Western end of SR 65 concurrency | |
50.73 | 81.64 | ![]() ![]() | Eastern end of SR 65 concurrency | ||
Wood | Jackson Township | 59.00 | 94.95 | ![]() ![]() | Western end of SR 235 concurrency |
Hoytville | 60.41 | 97.22 | ![]() ![]() | Eastern end of SR 235 concurrency | |
Henry Township | 64.65 | 104.04 | ![]() ![]() ![]() | Western terminus of SR 18 Bus. | |
North Baltimore | 66.29 | 106.68 | ![]() ![]() ![]() | Eastern terminus of SR 18 Bus.; roundabout | |
64.84 | 104.35 | ![]() | Exit 167 (I-75) | ||
Hancock | Cass Township | 74.41 | 119.75 | ![]() ![]() ![]() ![]() | Western end of SR 613 concurrency |
Hancock–Seneca county line | Fostoria | 81.72 | 131.52 | ![]() ![]() ![]() ![]() ![]() | Eastern end of SR 613; western end of US 23 / SR 199 concurrency |
Seneca | 82.54 | 132.84 | ![]() ![]() | Western end of SR 12 concurrency | |
82.59 | 132.92 | ![]() ![]() | Eastern end of SR 12 concurrency | ||
83.06 | 133.67 | ![]() ![]() ![]() ![]() | Eastern end of US 23 / SR 199 concurrency | ||
84.18 | 135.47 | ![]() ![]() | Northern terminus of SR 587 | ||
Hopewell Township | 89.90 | 144.68 | ![]() ![]() ![]() | Southern terminus of SR 635 | |
Tiffin | 93.81 | 150.97 | ![]() | ||
95.61 | 153.87 | ![]() ![]() ![]() | Western end of SR 101 concurrency | ||
96.16 | 154.75 | ![]() ![]() ![]() | Northern terminus of SR 231 (at Market Street) | ||
96.63 | 155.51 | ![]() ![]() | Eastern end of SR 101 concurrency | ||
Republic | 104.63 | 168.39 | ![]() ![]() ![]() ![]() | Western end of SR 67 concurrency; western terminus of SR 162 | |
104.75 | 168.58 | ![]() ![]() ![]() | Eastern end of SR 67 concurrency | ||
Sandusky | Bellevue | 118.48 | 190.68 | ![]() ![]() | Western end of US 20 concurrency |
Sandusky–Huron county line | 118.52 | 190.74 | ![]() ![]() | Western end of SR 113 concurrency | |
Huron | 118.61 | 190.88 | ![]() | ||
119.49 | 192.30 | ![]() ![]() | Eastern end of SR 113 concurrency | ||
121.02 | 194.76 | ![]() ![]() ![]() | |||
Monroeville | 125.87 | 202.57 | ![]() ![]() ![]() ![]() | Western end of SR 547 Truck concurrency | |
126.52 | 203.61 | ![]() ![]() ![]() ![]() ![]() | Eastern terminus of SR 547; eastern end of SR 547 Truck concurrency | ||
Norwalk | 128.97– 129.28 | 207.56– 208.06 | ![]() ![]() | Interchange to unsigned SR 61-C; eastbound exit / westbound entrance only | |
132.01 | 212.45 | ![]() ![]() ![]() ![]() | Interchange | ||
Norwalk Township | 133.84 | 215.39 | ![]() ![]() | Interchange; eastern end of US 20 concurrency | |
Norwalk–Townsend township line | 135.62 | 218.26 | ![]() ![]() ![]() | Southern terminus of SR 601 | |
Clarksfield Township | 143.21 | 230.47 | ![]() ![]() ![]() | Western end of SR 60 concurrency | |
143.80 | 231.42 | ![]() ![]() | Eastern end of SR 60 concurrency | ||
Lorain | Brighton Township | 149.31 | 240.29 | ![]() | |
Wellington | 154.12 | 248.03 | ![]() | ||
Penfield Township | 159.15 | 256.13 | ![]() | ||
Medina | Litchfield Township | 164.32 | 264.45 | ![]() | Traffic circle |
York Township | 169.45 | 272.70 | ![]() ![]() ![]() | Western end of SR 57 concurrency; southern terminus of SR 252 | |
Medina | 173.50 | 279.22 | ![]() ![]() ![]() | Western end of SR 3 concurrency | |
173.57 | 279.33 | ![]() ![]() | Eastern end of SR 57 concurrency | ||
173.68 | 279.51 | ![]() ![]() | Eastern end of SR 3 concurrency | ||
Medina–Montville township line | 177.17 | 285.13 | ![]() | Exit 218 (I-71) | |
Granger–Sharon township line | 180.28 | 290.13 | ![]() | ||
Summit | Bath–Copley township line | 184.70 | 297.25 | ![]() ![]() | Exit 137 (I-77) |
Akron | 192.48 | 309.77 | ![]() ![]() | Western end of SR 162 concurrency | |
192.75 | 310.20 | ![]() ![]() ![]() ![]() | Eastern end of SR 162 concurrency | ||
192.81 | 310.30 | ![]() ![]() | |||
195.18 | 314.11 | ![]() ![]() ![]() ![]() | Northern terminus of SR 241 | ||
196.27– 196.39 | 315.87– 316.06 | ![]() | Exit 26 (I-76) | ||
197.36 | 317.62 | ![]() | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Location | North Baltimore |
---|---|
Length | 1.934 mi[3] (3.112 km) |
Existed | 2012–present |
State Route 18 Business (SR 18 Bus.) is a 1.9-mile-long (3.1 km)business route through the village ofNorth Baltimore in southernWood County. The route starts at aT-intersection with SR 18 inHenry Township and runs east into North Baltimore on Deshler Road and West State Street. In the center of the village, the route heads south onto South Main Street. SR 18 Bus. ends at aroundabout with SR 18 in the southern limits of the village.[4]
SR 18 Bus. was created in November 2012 along what used to be SR 18 through North Baltimore. When SR 18 was rerouted on a bypass of the village in 2012, the old route became a signed business route.[2] Most of the business route was designated by theOhio Department of Transportation asSR 18-J though a portion of the route near its western terminus was designatedSR 18-C.[1] As of 2017[update] those designations have been removed and ODOT no longer maintains the business route.
Media related toOhio State Route 18 at Wikimedia Commons