Mass Rapid Transit Line 5 | |||
---|---|---|---|
Overview | |||
Status | Approved | ||
Owner | Road Transport and Highways Division | ||
Locale | Greater Dhaka,Bangladesh | ||
Stations | 29 | ||
Service | |||
Type | Rapid transit | ||
System | Dhaka Metro Rail | ||
Operator(s) | Dhaka Mass Transit Company Limited | ||
Depot(s) |
| ||
Daily ridership | 1,230,000 (estimated) | ||
Technical | |||
Line length | Northern Route: 20 kilometres (12 mi) Southern route: 17.3 kilometres (10.7 mi) | ||
Number of tracks | 2 | ||
Character | Elevated and underground | ||
|
TheMRT Line 5 (Bengali:এমআরটি লাইন ৫,romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line ofDhaka Metro Rail. It will be the third line of the Dhaka Metro Rail system. This line comprisesNorthern Route andSouthern Route. The construction of the MRT Line 5'sNorthern Route began in 5 November 2023 and is scheduled to commence operation by 2028.[1]
In 2005, theWorld Bank published a study report, recommending that thegovernment of Bangladesh build a mass transit system inDhaka. In the same year, American consultancy firmLouis Berger Group prepared a strategic transport plan for Dhaka.[2] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[3] The five metro lines wereMRT Line 1,MRT Line 2,MRT Line 4, MRT Line 5 andMRT Line 6.[4]
The construction of the Northern Route of the MRT Line 5 will start in July 2023 and will end by 2028.[5]
Code | Name | Connections | Location | Opened | |
---|---|---|---|---|---|
English | Bengali | ||||
1 | Hemayetpur | হেমায়েতপুর | Savar Upazila | Planned | |
2 | Baliarpur | বালিয়ারপুর | |||
3 | Bilamalia | বিলামালিয়া | |||
4 | Amin Bazar | আমিনবাজার | |||
5 | Gabtoli | গাবতলী | MRT Line 2 MRT Line 5S | Mirpur Model Thana | |
6 | Darus Salam | দারুস সালাম | Darus Salam Thana | ||
7 | Mirpur 1 | মিরপুর ১ | Mirpur Model Thana | ||
8 | Mirpur 10 | মিরপুর ১০ | MRT Line 6 | ||
9 | Mirpur 14 | মিরপুর ১৪ | |||
10 | Kochukhet | কচুক্ষেত | Cantonment Thana | ||
11 | Banani | বনানী | Banani Thana | ||
12 | Gulshan 2 | গুলশান ২ | Gulshan Thana | ||
13 | Notun Bazar | নতুন বাজার | MRT Line 1 | Vatara Thana | |
14 | Vatara | ভাটারা |
The Southern Route of MRT Line 5 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.
Code | Name | Connections | Location | Opened | |
---|---|---|---|---|---|
English | Bengali | ||||
1 | Gabtoli | গাবতলী | MRT Line 2 MRT Line 5N | Mirpur Model Thana | Planned |
2 | Technical | টেকনিক্যাল | Darus Salam Thana | ||
3 | Kallyanpur | কল্যাণপুর | Mirpur Model Thana | ||
4 | Shyamoli | শ্যামলী | Adabar Thana | ||
5 | College Gate | কলেজ গেট | Tejgaon Thana | ||
6 | Asad Gate | আসাদ গেট | Mohammadpur Thana | ||
7 | Russel Square | রাসেল স্কয়ার | Dhanmondi Thana | ||
8 | Karwan Bazar | কাওরান বাজার | MRT Line 6 | Tejgaon Thana | |
9 | Hatirjheel | হাতিরঝিল | Hatirjheel Thana | ||
10 | Tejgaon | তেজগাঁও | Tejgaon Industrial Area Thana | ||
11 | Aftabnagar | আফতাবনগর | MRT Line 1 | Badda Thana | |
12 | Aftabnagar Center | আফতাবনগর সেন্টার | |||
13 | Aftabnagar East | আফতাবনগর পূর্ব | |||
11 | Nasirabad | নাসিরাবাদ | |||
15 | Desherkandi | দাশেরকান্দি |