Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

MRT Line 10

From Wikipedia, the free encyclopedia
Proposed rapid transit line in the Philippines

MRT Line 10
Overview
StatusProposed
LocaleQuezon City,Pasig,Taguig,Pasay
Termini
Stations16
Technical
Line length22.5 km (14.0 mi)
Track gauge1,435 mm (4 ft 8+12 in)

TheC-5 Metro Rail Transit Line 10, also known asMRT Line 10 orMRT-10, is a proposedrapid transit line in the Philippines. When completed, the line will be approximately 22.5 kilometers (14.0 mi) long, with 16 stations. The line would run alongCircumferential Road 5, with a terminus atNinoy Aquino International Airport, and another terminus inCommonwealth Avenue with a possible interchange withMRT-7 atTandang Sora Station. The line would then run from Commonwealth Avenue throughKatipunan Avenue, where there may be a possible interchange withLRT Line 2 at the Aurora Station in Katipunan Avenue. The line would then continue to NAIA along the aforementioned Circumferential Road 5. The planned location of the Line's Train Depot would be onUP Diliman Property inDiliman, Quezon City.[1][2]

The project is expected to cost92.58 billion, and is currently waiting approval of the relevant approving bodies.[2][3]

Stations

[edit]

Line 10 would have 16 stations. The known stations are as follows:[4]

NameStructure TypeTransfersLocation
CommonwealthElevatedTandang SoraQuezon City
Magsaysay Avenue
Carlos Garcia
Aurora BoulevardKatipunan
Pedro Tuazon
Santolan
Calle Industria
Ortigas4TiendesitasPasig
Lanuza
Pasig Boulevard
KalayaanTaguig
Bonifacio Global City
Cayetano Boulevard
Bayani Road
Food Terminal Incorporated MMS Food Terminal Incorporated
NAIA Terminal 3 MMS NAIA Terminal 3[5]Pasay

References

[edit]
  1. ^"C5 MRT 10 Project | PPP Center".ppp.gov.ph. RetrievedJanuary 1, 2021.
  2. ^abVera, Ben O. de (November 18, 2019)."Tycoons' unsolicited PPP projects bolster 'Build, Build, Build'".INQUIRER.net. RetrievedJanuary 1, 2021.
  3. ^Ordinario, Cai (October 1, 2018)."Neda reviews proposal for MRT 10, 2 other infrastructure projects | Cai Ordinario".BusinessMirror. RetrievedJanuary 1, 2021.
  4. ^49th PBC&E Day 2 (Facebook Live).Philippine Chamber of Commerce and Industry. October 25, 2023. RetrievedOctober 28, 2023.
  5. ^"6 subway stations to rise on gov't properties".www.pna.gov.ph. RetrievedJanuary 1, 2021.
Note: Under construction & planned lines are inItalics
Retrieved from "https://en.wikipedia.org/w/index.php?title=MRT_Line_10&oldid=1280277089"
Category:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp