The electrified, mostly single-track,iberian gauge (1,668 m) line runs parallel to theMondego River.[2]It is the main railway access from Portugal to the rest ofEurope.[1] It was constructed byCompanhia dos Caminhos de Ferro Portugueses da Beira Alta to open a new international link, closer to Coimbra, and to connect the line to thePort of Figueira da Foz. It was opened on 3 August 1882.[3] During the modernisation and electrification in the 1980s and 90s the signalling and tracks were replaced.[1]
As of June 2023, the entire line is closed for further modernisation work with buses replacing passenger trains. Completion date unknown. The works include construction of a new chord, theConcordância da Mealhada, allowing freight trains from the north to avoid the Pampilhosa area. Level (grade) crossings are to be eliminated and upgraded signalling installed. More information, in Portuguese, athttps://www.infraestruturasdeportugal.pt/pt-pt/modernizacao-da-linha-da-beira-alta-2