Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 6 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia
(Redirected fromLine 6, Chongqing Rail Transit)
Metro line of Chongqing Rail Transit
Line 6
Hongqihegou Station platform
Overview
Statusoperational
Termini
Stations40
(28 on the main line)
(12 on International Expo branch)
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corp., Ltd
Daily ridership452,300 (2016 Peak)[1]
History
Opened28 September 2012; 12 years ago (2012-09-28)
Technical
Line length85.54 km (53.15 mi)
Track gauge1435 mm
Operating speed100 km/h (peak)
Route map

Chongqing E.
Chayuan
Changshenglaojie
Qiujiawan
Baileyuan
Changshengqiao
Bus interchange
Liujiaping
Changsheng depot
Shangxinjie
Xiaoshizi
Grand Theater
Jiangbeicheng
Wulidian
Hongtudi
Huangnibang
Hongqihegou
Huahuiyuan
Dalongshan
Ranjiaba
Guangdianyuan
Dazhulin depot
Dazhulin
Kangzhuang
Jiuquhe
International
Expo branch
[a]
Lijia
Happy Valley
Jinshansi
Huangmaoping
Gaoyikou
Caojiawan
Caijia
International
Expo Center
Xiangjiagang
Yuelai
Wangjiazhuang
Qingxihe
Longfengxi depot
Caojiawan depot
Longfengxi
Liujiayuanzi
Zhuangyuanbei
Beibei Railway StationBus interchange
Siyuan
Southwest University
Fuxing
Beibei
Bus interchange
Hongyanping
Shaheba
  1. ^Through-service from/to main line suspended
This diagram:

CRT Line 6 (and the branch line branded asInternational Expo line) is the secondheavy railsubway line inChongqing, as well as being the longest rapid transit line in China, at 85.6 km (53.19 mi) long. It opened with provisional revenue service on September 28, 2012, and connects Nan'an, Yuzhong, and Jiangbei districts in central Chongqing.

Interior of a Line 6 train

Opening timeline

[edit]
SegmentCommencementLengthStation(s)Name
Wulidian – Kangzhuang28 September 201213.91 km (8.64 mi)9Phase 1 (initial section)
Kangzhuang – Lijia26 December 20123.9 km (2.42 mi)1Phase 1 (2nd section)
Ranjiaba20 January 2013Infill station1
Lijia – Yuelai15 May 201312.1 km (7.52 mi)2International Expo line Phase 1
Lijia – Beibei31 December 201323.4 km (14.54 mi)4Phase 2 (northern section)
Jiuquhe, Tiansheng[a]28 September 2014Infill stations2
Xiangjiagang26 November 2014Infill station1
Chayuan – Wulidian30 December 201419.2 km (11.93 mi)7Phase 1 (final section) & Phase 2 (southern section)
Pingchang[b], Huangmaoping28 February 2015Infill stations2
Caojiawan, Gaoyikou26 October 2015Infill stations2
Jiangbeicheng28 January 2016Infill station1
Yuelai – Shaheba31 December 202013.99 km (8.69 mi)[2]7International Expo line Phase 2
  1. ^Currently named as Southwest University.
  2. ^Currently named as Happy Valley.

Stations (south to north)

[edit]

Operational

[edit]
Service
routes
Station
Station nameConnectionsDistance
km
Location
EnglishChinese
6
01
Chayuan茶园-0.00Nan'an
6
02
Qiujiawan邱家湾1.401.40
6
03
Changshengqiao长生桥1.703.10
6
04
Liujiaping刘家坪1.804.90
6
05
Shangxinjie上新街     Loop line6.7011.60
6
06
Xiaoshizi小什字     Line 1 18 1.4013.00Yuzhong
6
07
Grand Theater大剧院1.2514.25Jiangbei
6
08
Jiangbeicheng江北城     Line 91.0015.25
6
09
Wulidian五里店     Line 9     Loop line1.3016.55
6
10
Hongtudi红土地     Line 101.4518.00
6
11
Huangnibang黄泥磅1.3519.35
6
12
Hongqihegou红旗河沟     Line 31.2020.55Yubei
6
13
Huahuiyuan花卉园 4 1.3521.90
6
14
Dalongshan大龙山     Line 51.8523.75
6
15
Ranjiaba冉家坝     Line 5     Loop line0.7024.45
6
16
Guangdianyuan光电园2.1526.60
6
17
Dazhulin大竹林3.0529.65
6
18
Kangzhuang康庄0.8030.45
6
19
Jiuquhe九曲河2.1532.6
6
20
Lijia礼嘉1.6034.20
6
21
Jinshansi金山寺 15 1.3535.55
6
22
Caojiawan曹家湾5.1540.70Beibei
6
23
Caijia蔡家1.9042.60
6
24
Xiangjiagang向家岗1.9544.55
6
25
Longfengxi龙凤溪8.7553.30
6
26
Zhuangyuanbei状元碑1.7555.05
6
27
Southwest University[3]西南大学[3]2.9057.95
6
28
Beibei北碚1.8059.75
International Expo branch
6
29
Happy Valley欢乐谷 15 2.3836.58Yubei
6
30
Huangmaoping黄茅坪2.8039.38
6
31
Gaoyikou高义口3.4442.82
6
32
International Expo Center国博中心2.3245.14
6
33
Yuelai悦来     Line 101.0846.21
6
34
Wangjiazhuang王家庄     Line 102.0348.24
6
35
Qingxihe清溪河2.3150.55Beibei
6
36
Liujiayuanzi刘家院子2.1052.65
6
37
Siyuan思源2.9455.59
6
38
Fuxing复兴1.7057.29
6
39
Hongyanping红岩坪1.2658.55
6
40
Shaheba沙河坝1.4559.99

Under Construction

[edit]

Covering a distance of 6.7 km,[4] this extension starts fromLiujiaping station and branches off towardsChongqing East Station, with 2 stations in between.[4] The project began on 28 March 2022.[5]

Station
Station nameConnectionsLocation
EnglishChinese
6/**Chongqing E.重庆东站 24  27 
Chongqing East railway stationChongqingdong
Nan'an
6/**Changshenglaojie长生老街
6/**Baileyuan百乐园
6/04Liujiaping刘家坪

Features

[edit]

Caijia Rail Transit Bridge

[edit]

The line crosses theJialing River via Caijia Rail Transit Bridge (Chinese:蔡家轨道大桥). Construction work began in October 2010 and it was completed in December 2013.[6]

References

[edit]
  1. ^重庆轨道客运量9月30日创新高 达到257.4万乘次.
  2. ^"重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21.Archived from the original on 2020-08-30.
  3. ^ab"重庆轨道交通4座车站于12月1日更名". 2019-11-30.
  4. ^ab"轨道交通6号线东延项目可研获批 全长6.7公里". 2022-01-16.
  5. ^"轨道交通6号线东延伸段开工". 2022-03-28.
  6. ^"重庆市蔡家轨道大桥". Retrieved2022-09-09.
Public transportation in Chongqing Metropolitan Area (CQ)
Chongqing Rail Transit
Lines in operation
Under construction
Planned
Trams in China Trams in Chongqing
Lines in operation
CR C-train (intercity rail)
Lines in operation
CR G-train (high-speed rail)
Under construction
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_6_(Chongqing_Rail_Transit)&oldid=1286062027"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp