Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 13 (Shanghai Metro)

From Wikipedia, the free encyclopedia
(Redirected fromLine 13, Shanghai Metro)
Metro line of the Shanghai Metro
Line 13
Overview
Other name(s)M5 (planned name);
Expo line (former name in 2010)
Native name上海地铁13号线
StatusOperational
OwnerShanghai Rail Transit Line 13 Development Co., Ltd.
LocalePudong,Huangpu,Jing'an,Putuo, andJiading districts,Shanghai,China
Termini
Stations36
Service
TypeUrban rail transit in ChinaRapid transit
SystemShanghai MetroShanghai Metro
ServicesMainline:Jinyun RoadZhangjiang Road
Partial mainline:Jinyun RoadHuapeng Road
Operator(s)Shanghai No. 2 Metro Operation Co. Ltd.
Depot(s)Beidi Road depot;
Chuanyang River depot
Rolling stock62 Class A 6-car trains
Daily ridership737,800 (2019 peak)[1]
History
CommencedMarch 21, 2007; 18 years ago (2007-03-21) (Expo line section)
OpenedApril 20, 2010; 15 years ago (2010-04-20) (As Expo line from Madang Road to Shibo Avenue)
Last extensionDecember 30, 2018; 6 years ago (2018-12-30)
ClosedNovember 2, 2010; 14 years ago (2010-11-02) (Expo line)
ReopenedDecember 30, 2012; 12 years ago (2012-12-30)
Technical
Line length43.3 km (26.91 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines 1.5kVDC
Operating speed80 km/h (50 mph)
Average speed: 32.8 km/h (20 mph)
SignallingALSTOM Urbalis CBTC
Route map
To scale geographic map:

Line 13 is a north-west to south-east line of theShanghai Metro network. It runs betweenJinyun Road inJiading andZhangjiang Road inPudong. It was once used as a dedicated line (Expo line) for the World Expo to serve the 2010 Shanghai World Expo. The line is colored pink on system maps.

History

[edit]

Special Phase

[edit]

The Special Phase of Line 13 operated betweenMadang Road andShibo Avenue, during the2010 Shanghai World Expo. Following the end of the Expo, this phase was closed. This part of the line reopened on December 19, 2015, along with the full opening of the line.[citation needed]

1st Phase

[edit]

The 1st Phase of Line 13 ran between all the stations betweenJinyun Road andJinshajiang Road, with 7 stations. The section opened in December 2012.[2]

2nd Phase and 3rd Phase

[edit]

The two phases ran fromChangqing Road toZhangjiang Road inZhangjiang Hi-Tech Park region. The rest of the line was opened on December 19, 2015.[citation needed]

Shanghai Metro Line 13 opening history
SegmentCommencedOpenedLengthStation(s)NameInvestment
Madang Road — Shibo Avenue21 Mar 200720 Apr 20104.0 km (2.49 mi)3Expo line (special phase)¥1.338 billion
closed:
2 Nov 2010Temporarily ceased operation-3
Jinyun Road — Jinshajiang Road28 Dec 200830 Dec 20129.9 km (6.15 mi)5Phase 1 (1st section)¥12.417 billion
South Qilianshan Road15 Jun 2013Infill station1
Daduhe Road1 Nov 2014Infill station1
Jinshajiang Road — Changshou Road15 Nov 201128 Dec 20142.9 km (1.8 mi)3Phase 1 (2nd section)
Changshou Road — West Nanjing Road15 Nov 201119 Dec 20152.6 km (1.6 mi)4Phase 1 (3rd section)
West Nanjing Road — Madang Road20 Nov 20092.8 km (1.7 mi)2Expo line (1st section)¥4.521 billion
Madang Road — Shibo AvenueRe-entered operation3
Shibo Avenue — Changqing Road30 Dec 20181.0 km (0.6 mi)1Expo line (2nd section)
Changqing Road — Middle Huaxia Road31 Dec 201310.5 km (6.5 mi)8Phase 2¥12.932 billion
Middle Huaxia Road — Zhangjiang Road30 Mar 20144.8 km (3.0 mi)3Phase 3
National Exhibition and Convention Center — Jinyun Road28 Jun 2021end 2025 (exp.)9.8 km (6.1 mi)5West extension¥12.629 billion
Zhangjiang Road — Dangui Road[3]28 May 2023end 2026 (exp.)4.52 km (2.8 mi)2East extension

Stations

[edit]
Further information:List of Shanghai Metro stations

Service routes

[edit]
Shanghai Metro Line 13 service routes
RoutesStation nameConnectionsDistanceLocationOpen-
ing
Plat-
form[4]
MPEnglishChinesekmmin
National Exhibition and Convention Center国家会展中心 2  17 0.000.000QingpuExpected opening in 2026UndergroundIsland
Yunle Road运乐路1.7811.781
Jile Road季乐路1.1202.901
Qianwan Park前湾公园0.9963.897
Jidi Road纪翟路1.4435.340
Jinyun Road金运路0.000.000Jiading30 Dec 2012[5]
West Jinshajiang Road金沙江西路1.521.523
Fengzhuang丰庄1.943.466
South Qilianshan Road祁连山南路1.314.778Putuo15 June 2013[6]
Zhenbei Road真北路1.486.251130 Dec 2012[5]
Daduhe Road大渡河路 15 1.247.49131 Nov
2014[7]
Jinshajiang Road金沙江路 3  4 1.629.111630 Dec 2012[5]UndergroundIsland
Longde Road隆德路 11 1.2110.321828 Dec 2014[8]
Wuning Road武宁路 14 0.8511.1720
Changshou Road长寿路 7 1.0812.2522
Jiangning Road江宁路0.7012.952419 Dec 2015[9]
Hanzhong Road汉中路 1  12 1.6314.5827Jing'an
Shanghai Natural History Museum自然博物馆0.6515.2328
West Nanjing Road南京西路 2  12 [i]0.8616.0931UndergroundSide
Middle Huaihai Road淮海中路0.9617.0533HuangpuUndergroundIsland
Site of the First CPC National Congress · Xintiandi一大会址·新天地 10 1.2118.2635
Madang Road马当路 9 0.6318.893720 Apr
2010/
19 Dec 2015[9][ii]
World Expo Museum世博会博物馆1.5320.4240
Shibo Avenue世博大道1.6122.0342PudongUndergroundSide &Island
Changqing Road长清路 7 [iii]0.8922.924430 Dec 2018[12]UndergroundIsland
Chengshan Road成山路 8 1.1624.0846
Dongming Road东明路 6 1.4025.4848
Huapeng Road华鹏路1.1526.6351
Xia'nan Road下南路1.8228.4553
Beicai北蔡1.0729.5256
Chenchun Road陈春路0.9330.4558
Lianxi Road莲溪路 18 1.3431.7960
Middle Huaxia Road华夏中路 16 1.7733.5662Underground DoubleIsland
Zhongke Road中科路1.0634.6265UndergroundIsland
Xuelin Road学林路1.9636.5868
Zhangjiang Road张江路1.6938.2770
Middle Gaoke Road高科中路u/c since 28 May 2023
Expected opning
2026
UndergroundIsland
Dangui Road丹桂路
  1. ^Virtual transfer withline 2 orline 12 – passengers who hold theShanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  2. ^20 April 2010-2 November 2010:(as the Expo 2010 line).[10][11]
  3. ^Virtual transfer withline 7 – passengers who hold theShanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.


Important Stations

[edit]

Future Expansion

[edit]
Shanghai Metro Line 13 West Extension

West extension: It will be extended for 9.47 km (5.88 mi) fromJinyun Road station toNational Exhibition and Convention Center station onLine 17 and add 5 stations.[13] The stations are: Jizhai Road station; Fangle Road station; Jile Road station; Yunle Road station; andNational Exhibition and Convention Center station. Riders can change onto Line 17 andLine 2 (out of station transfer) at the terminus. Construction started on June 28, 2021 and will open by the end of 2026.

East extension: is part of Phase III adjustment and starts from the currentZhangjiang Road station and ends at Zhangjiang Jidian Port (area), mainly along Zhangdong Road, with a line length of about 4.1 kilometres (2.5 mi). Both are underground lines with 2 stations.[14]

Station name change

[edit]

Headways

[edit]
Shanghai Metro Line 13 headway[15]
TimeJinyun Road -
Huapeng Road
Huapeng Road -
Zhangjiang Road
Monday - Friday (Working Days)
AM peak7:30–9:30About 2 min and 30 secAbout 5 min
Off-peak9:30–17:00About 6 min
PM peak17:00–19:30About 3 minAbout 6 min
Other
hours
Before 7:30
After 19:30
About 6 – 10 min
Saturday and Sunday (Weekends)
Peak8:30–20:30About 5 min
Other
hours
Before 8:30
After 20:30
About 6 - 10 min
Extended Operation Interval (Friday, Saturday)
After 22:30About 15 min ~ 20 min

Technology

[edit]

Rolling Stock

[edit]

The trains of Line 13 are composed of 6-carriages Class A cars, with a design speed of 80 km/h (50 mph), VVVF AC drive, and a design life of 30 years and are China's first domestically developed trains. Trains have a capacity of about 1,860 people. Carriages are 23.54 metres (77 ft 3 in) in length, 3.0 metres (9 ft 10 in) in width, and 3.8 metres (12 ft 6 in) in height.

09A02 trains (numbers 0942–0945, 0948) were used on Line 13, only used during the 2010 Shanghai World Expo, which were reassigned fromline 9 to line 13, all of which have now been transferred back to line 9.

Shanghai Metro Line 13 rolling stock
Fleet numbersManufacturerTime of
manufac-
turing
ClassNo
of
car
Assembly[i]Rolling stockNumberNotes
144CRRC Nanjing Puzhen Co., Ltd.2011-2014A[ii]6Tc+Mp+M+M+Mp+Tc13A011301-1324
(130011-131441)
Original name: AC18.
228CRRC Nanjing Puzhen Co., Ltd.2016-2018A[ii]6Tc+Mp+M+M+Mp+Tc13A021325-1362
(131451-133721)
[16]
  1. ^Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^abClass A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.

Future Rolling Stock

[edit]
Shanghai Metro Line 13 future rolling stock
Fleet numbersManufacturerTime of
manufac-
turing
ClassNo
of
car
Assembly[i]Rolling stockNumberNotes
144CRRC Nanjing Puzhen Co., Ltd.2023-2025A[ii]6Tc+Mp+M+M+Mp+Tc13A0313063-13086
(133731-135161)
36CRRC Nanjing Puzhen Co., Ltd.2025A[ii]6Tc+Mp+M+M+Mp+Tc13A0413087-13092
(133731-135161)
  1. ^Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.
  2. ^abClass A carriage: 21-24m in length, 3.0m in width and 3.8m in height; Capacity: about 310 people.
  • 13A01 train
    13A01 train
  • 13A02 train
    13A02 train

References

[edit]
  1. ^2019最后一天上海地铁运送客流【1303.35万人次】跨年夜延时加开63列次 (in Chinese). 上海地铁shmetro. 2020-01-02. Retrieved2020-01-09.
  2. ^Shanghai Eastday, 7 February 2012.
  3. ^Yuting, Zhu; Meiping, Yang (28 May 2023)."Shanghai Metro on the right track after 30 years". Shine.com.
  4. ^乘车指南 > Station信息.Shanghai Metro Official Site. Retrieved2015-12-17. Instructions:点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  5. ^abc13号线一期西段12月30日起载客试运营. Shanghai Metro Official Site. 2012-12-28.
  6. ^13号线祁连山南路站6月15日起开站迎客. Shanghai Metro Official Site. 2013-06-14.
  7. ^13号线大渡河路站11月1日开站. Shanghai Metro Official Site. 2014-10-29.
  8. ^13、16号线12月28日新增5站试运营. Shanghai Metro Official Site. 2014-12-25.
  9. ^ab上海地铁运管中心 (2015-12-17).12月19日起 11、12、13号线新延伸段建成试运营.Shanghai Metro Official Site. Retrieved2015-12-17.
  10. ^上海世博园试运行 中国馆成热点. 中国政府网. 2010-04-20. Retrieved2015-12-17.
  11. ^上海地铁明起取消涉博加班车 13号线2日起暂停.Tencent (QQ) News. 2010-11-01. Archived fromthe original on 2015-12-22. Retrieved2015-12-17.
  12. ^连接莘庄和闵行 轨道五号线开通试运营. Sina. 2003-11-25.
  13. ^"《上海市轨道交通13号线西延伸工程选线专项规划》公示". Archived fromthe original on 2020-11-03. Retrieved2021-03-10.
  14. ^"地铁13号线东延伸、21号线一期延伸到上海东站、浦东机场 [The east extension of Metro Line 13 and the first phase of Line 21 extend to Shanghai East Railway Station and Pudong Airport]". June 1, 2021.
  15. ^"Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved2021-07-07.
  16. ^上海地铁十三号线列车.中车南京浦镇车辆有限公司 (in Chinese). Retrieved2020-03-20.

External links

[edit]
Shanghai MetroShanghai MetroShanghai Metro
Lines in operation
Under construction
  •  2 (phase III of western extension)
  •  12 (western extension)
  •  13 (western and eastern extensions)
  •  15 (southern extension)
  •  18 (phase II)
  •  19 
  •  20 
  •  21 
  •  22 
  •  23 
Under planning
Maglev
Lines in operation
Under planning
Trams in ChinaTrams
Lines in operation
Under construction
 T2 Songjiang Tram#Songjiang_Tram_T2 (West extension)
Under planning
Closed
APM
Airport
Other
Bus rapid transitTrolleybusBus interchange Bus
Operational
Mainline rail interchangeShanghai Suburban Railway
Lines in operation
Under construction
Under planning
Closed
OtherCR railways
Express trainHSR Corridors
(C/D/G trains)
Mainline rail interchangeConventional
(Z/T/K trains)
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Line 13
Stations initalics have yet to open.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_13_(Shanghai_Metro)&oldid=1284355767"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp