Line 1 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia
(Redirected fromLine 1, Chongqing Rail Transit)
Metro line of Chongqing Rail Transit
Line 1
Overview
Termini
Stations25
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corporation Limited
Daily ridership690,000 (2016 Peak)[1]
History
Opened28 July 2011; 13 years ago (2011-07-28)
Technical
Line length43.71 km (27.16 mi)
Operating speed100 km/h (62 mph) (peak)
Route map

Chaotianmen
ferry/water interchange
Xiaoshizi
Jiaochangkou
Qixinggang
Lianglukou
Eling
Daping
Shiyoulu
Xietaizi
Shiqiaopu
Gaomiaocun
Majiayan Depot
Majiayan
Xiaolongkan
Shapingba
Yanggongqiao
Lieshimu
Ciqikou
Shijingpo
Shuangbei
Laijiaqiao Depot
Laijiaqiao
Weidianyuan
Chenjiaqiao
Bus interchange
Daxuecheng
Jiandingpo
Bishan
Bishan Depot
This diagram:

Line 1 ofCRT runs westwards fromChaotianmen toBishan. Line 1 began operation on 28 July 2011.[2]

Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail metro line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed aBuild-Operate-Transfer in 1992 with aHong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues.[citation needed] Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.[3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012 before receiving a short extension from Daxuecheng to Jiandingpo a year later. And an extension, running from Jiandingpo to Bishan also opened on December 30, 2019, making Line 1 the first CRT line to reach areas outside Metropolitan Chongqing.[4] The latest extension from Xiaoshizi to Chaotianmen has been opened on 31 December 2020, making Line 1 a completely finished subway line.

Line 1 has 25 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, Shapingba, Yanggongqiao, Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), Jiandingpo and Bishan stations.

Line 1 has transfer interchange stations withLine 6 atXiaoshizi andLine 2 atJiaochangkou in Jiefangbei CBD and atDaping andLine 3 atLianglukou, which is nearChongqing railway station in central Yuzhong. Line 1 is also transferable with theLoop Line atShapingba, although out-of-station transfer is currently needed due to construction setbacks on the interchange channel and concourse connecting the two subway lines.

Opening timeline

[edit]
SegmentCommencementLengthStation(s)Name
Jiaochangkou – Shapingba28 July 201114.2 km (8.82 mi)10Phase 1 (initial section)
Xiaoshizi – Jiaochangkou27 September 20111.4 km (0.87 mi)1Phase 1 (remaining section)
Gaomiaocun17 November 2011Infill station1
Shapingba – Daxuecheng20 December 201219.7 km (12.24 mi)7Phase 2
Weidianyuan28 March 2013Infill station1
Majiayan25 September 2013Infill station1
Shijingpo28 September 2014Infill station1
Daxuecheng – Jiandingpo30 December 20141.9 km (1.18 mi)1Extension of Phase 2
Jiandingpo – Bishan30 December 2019[5]5.6 km (3.48 mi)[4]1Extension to Bishan
Xiaoshizi – Chaotianmen31 December 20200.8 km (0.50 mi)[6]1Extension to Chaotianmen

Service routes

[edit]

Current stations

[edit]
Service
routes
Station
Station nameConnectionsDistance
km
Location
EnglishChinese
1
01
Chaotianmen朝天门-0.00Yuzhong
1
02
Xiaoshizi小什字     Line 6 18 0.660.66
1
03
Jiaochangkou较场口     Line 21.362.02
1
04
Qixinggang七星岗     Line 10 18 0.852.87
1
05
Lianglukou两路口     Line 3Chongqing railway stationCQW1.444.30
1
06
Eling鹅岭1.605.90
1
07
Daping大坪     Line 21.737.63
1
08
Shiyoulu石油路1.168.79
1
09
Xietaizi歇台子     Line 5     Line 181.039.82Jiulongpo
1
10
Shiqiaopu石桥铺     Line 5 27 1.2511.07
1
11
Gaomiaocun高庙村1.6812.75Shapingba
1
12
Majiayan马家岩1.2013.95
1
13
Xiaolongkan小龙坎     Line 91.0915.03
1
14
Shapingba沙坪坝     Line 9     Loop line 27 
Shapingba railway stationCYW
0.8715.90
1
15
Yanggongqiao杨公桥1.1717.08
1
16
Lieshimu烈士墓0.8217.90
1
17
Ciqikou磁器口 27 1.0518.95
1
18
Shijingpo石井坡1.4020.35
1
19
Shuangbei双碑1.9022.25
1
20
Laijiaqiao赖家桥7.0029.25
1
21
Weidianyuan微电园 7 1.7731.02
1
22
Chenjiaqiao陈家桥 15 3.3534.37
1
23
Daxuecheng大学城 17 1.9036.27
1
24
Jiandingpo尖顶坡1.5537.81
1
25
Bishan璧山     Line Bitong Bishan SkyShuttle [a]
 27 [7]
5.9043.71Bishan

Notes

[edit]
  1. ^Out of system transfer

References

[edit]
  1. ^"重庆轨道客运量9月30日创新高 达到257.4万乘次".
  2. ^Chongqing Metro Line 1 into trial operationArchived 2011-09-28 at theWayback Machine
  3. ^"Chongqing's Metro Line 1 Now Open". Archived fromthe original on 2011-08-27. Retrieved2012-08-27.
  4. ^ab"重庆轨道交通首次驶出主城 1号线璧山站要来了". 2019-11-13.
  5. ^"重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
  6. ^"重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21.Archived from the original on 2020-08-30.
  7. ^"重庆轨道交通15号线计划年内开建 27号线明年开建". 2019-07-23. Archived fromthe original on November 13, 2019.
Public transportation in Chongqing Metropolitan Area (CQ)
Chongqing Rail Transit
Lines in operation
Under construction
Planned
Trams in China Trams in Chongqing
Lines in operation
CR C-train (intercity rail)
Lines in operation
CR G-train (high-speed rail)
Under construction
Transportation hubs
List of airports in China Airports
China Railway Railway stations