From Wikipedia, the free encyclopedia
Light rail system

Green Line
Green Line train atPark Street station in 2024
Overview
OwnerMassachusetts Bay Transportation Authority
LocaleBoston,Brookline,Cambridge,Medford,Newton, andSomerville, Massachusetts
Termini
Stations70
Service
TypeLight rail
SystemMBTA subway
Services4 (B branch,C branch,D branch,E branch)
Rolling stockKinki SharyoType 7
AnsaldoBredaType 8
CAFType 9
Daily ridership101,000 (2023)[1]
History
OpenedSeptember 1, 1897 (1897-09-01) (Tremont Street subway)
Technical
Line length26.7 miles (43.0 km)[2]
CharacterSubway, grade-separated surfaceROW, viaduct, median reservation,street running
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
Minimum radius33 feet (10 m)[3]
ElectrificationOverhead line600 V DC
Route map
MapShow interactive map
Mystic Valley Parkway
proposed
Medford/​Tufts
Magoun Square
Gilman Square
East Somerville
Union Square
Lechmere
Lechmere
(
closed
2020
)
Science Park
North Station
Downeaster (train)
Canal Street Incline (
closed
2004
)
Haymarket
Government Center
Park Street
Boylston
Arlington
Copley
Copley Junction
Prudential
Symphony
Northeastern University
Museum of Fine Arts
Longwood Medical Area
Brigham Circle
Fenwood Road
Mission Park
Riverway
Back of the Hill
Heath Street
Arborway Line (
closed
1985
)
Arborway Line (
closed
1985
)
Forest Hills
Needham Line
Arborway
Hynes Convention Center
Kenmore
Blandford Street Portal
Blandford Street
Boston University East
Boston University Central
Amory Street
Babcock Street
A branch (
closed
1969
)
A branch (
closed
1969
)
Packards Corner
St. Luke's Street
Chester Street
Linden Street
Harvard Avenue
Allston Street
Union Square
Cambridge Street
street-running stops
Oak Square
Oak Square Loop
Newton Corner
Galen Street
street-running stops
Watertown Yard
Packards Corner
Harvard Avenue
Griggs Street
Allston Street
Warren Street
Washington Street
Sutherland Road
Chiswick Road
Chestnut Hill Avenue
to Reservoir Carhouse
South Street
Boston College
Saint Mary's Street Portal
Saint Mary's Street
Hawes Street
Kent Street
Saint Paul Street
Coolidge Corner
Summit Avenue
Brandon Hall
Fairbanks Street
Washington Square
Tappan Street
Dean Road
Englewood Avenue
Fenway Portal
Fenway
Longwood
Brookline Village
Brookline Hills
Beaconsfield
Cleveland Circle
Reservoir Carhouse
Cleveland Circle
Reservoir
Chestnut Hill
Newton Centre
Newton Highlands
Eliot
Waban
Woodland
Riverside
Riverside Carhouse
This diagram:
Show route diagram map

TheGreen Line is alight rail system[4][5] run by theMassachusetts Bay Transportation Authority (MBTA) in theBoston,Massachusetts, metropolitan area. It is the oldestMBTA subway line, and with tunnel sections dating from 1897, the oldest subway inNorth America.[6] It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it isamong the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of theEmerald Necklace of Boston.[7][8][9]

The four branches are the remnants of a largestreetcar system, which began in 1856 with theCambridge Horse Railroad and was consolidated into theBoston Elevated Railway several decades later. The branches all travel downtown through theTremont Street subway, the oldest subway tunnel in North America. The Tremont Street subway opened its first section on September 1, 1897, to take streetcars off overcrowded downtown streets; it was extended five times over the next five decades. The streetcar system peaked in size around 1930 and was gradually replaced withtrackless trolleys andbuses, with cuts as late as 1985. The newD branch opened on a converted commuter rail line in 1959. TheGreen Line Extension project extended two branches intoSomerville andMedford in 2022.

Route description

[edit]
Schematic map of Green Line branches and stations

The Green Line's core is thecentral subway, a group of tunnels which run through downtown Boston.[10] TheTremont Street subway runs roughly north–south through downtown, with stations atBoylston,Park Street,Government Center,Haymarket, andNorth Station – all with connections to other lines of theMBTA subway system. TheBoylston Street subway runs roughly east–west through theBack Bay neighborhood, with stations atArlington,Copley,Hynes Convention Center, andKenmore; it connects to the Tremont Street subway at Boylston. TheHuntington Avenue subway diverges from the Boylston Street subway at a flat junction west of Copley, running southwest, with stations atPrudential andSymphony.[11]: 96  A branch of the Tremont Street subway, disused since 1962, runs south from Boylston to the formerPleasant Street incline.

The Green Line has four western surface branches, each with a letter designation:

B and C branch service terminates at Government Center, while D and E branch service continues north from downtown Boston. North ofNorth Station, the line inclines up to theLechmere Viaduct, which crosses theCharles River with an elevated station atScience Park. The elevatedLechmere station is located on theGreen Line Extension viaduct, which continues north to a flying junction with two branches:

Former branches

[edit]
For a more comprehensive list, seeBoston-area streetcar lines.

TheGreen Line A branch was the northernmost of the branches, running from theBlandford Street portal (still used by the B branch), west toWatertown, mostlystreet-running. The57 bus replaced the streetcar line in 1969. The A branch diverged from Commonwealth Avenue west of Boston University and ran to a terminus inWatertown, across the Charles River from Watertown Square, until 1969. Although the route-letter scheme had been introduced two years prior to its closure, the "A" designation was never signed on streetcars toWatertown. It was, however, included in thedestination signs on theBoeing-Vertol LRVs ordered in the mid-1970s, when reopening service to Watertown was under consideration. The "A" line tracks remained in non-revenue service to access maintenance facilities at Watertown until 1994.

ThePleasant Street portal hosted two services in its final days. The9 toCity Point ended in 1953, and the43 toEgleston was cut back toLenox Street in 1956, cut back to the portal in 1961, and ended operation in 1962. Prior to that, the48 serviced Tremont Street to Dover Street andWashington Street, ending atDudley, and last running in 1938.

The last two routes to continue beyond theCanal Street portal both ran toSullivan. The92 ran via Main Street, last running in 1948, and the93 via Bunker Hill Street last ran in 1949. Until 1997, trains continued to use the portal and its North Station surface station as a terminal.

In addition to the lines that later became the E branch, the predecessors to the58 and60 split inBrookline, one branch running into the current "E" tracks and into theBoylston Street portal, and the other running upBrookline Street to end atMassachusetts Avenue station. These were truncated in 1932 into a shorter route fromBrookline Village to the subway via the Boylston Street portal, which itself stopped running in 1938 (being cut back toBrigham Circle short-turn trips), three years before the closure of that portal.

The last "foreign" cars to operate in the subway were those of theEastern Massachusetts Street Railway, running from theCanal Street portal to theBrattle Loop atScollay Square until 1935. It was then that the oldMystic River Bridge toChelsea was closed to streetcars and the lines were replaced by bus service; the next year theBoston Elevated Railway (BERy) bought the Eastern Mass Chelsea Division and through-routed it with its lines connecting to theEast Boston Tunnel atMaverick.

Rolling stock

[edit]

Like the three other MBTA subway lines, the line usesstandard gauge tracks. However, instead of heavy rail metro rolling stock, the Green Line uses modern streetcars (light rail vehicles) as heavy rail stock would be inappropriate for the surface branches with their numerousgrade crossings.

Listing

[edit]

Active fleet

[edit]

Rolling stock as of June 2024[update]:[2][12]

Year BuiltManufacturerModelImageLengthWidthFleet NumbersQuantity
1986–1988Kinki SharyoType 7 LRV72 ft (22 m)104 in (2.64 m)3600–3699100 (78 active, all overhauled)
19973700–371920 (15 active, all overhauled)
1998–2007AnsaldoBredaType 8 LRV74 ft (23 m)3800–389495 (80 active)
2018–2020CAF USAType 9 LRV3900–392324 (all active)

Retired fleet

[edit]

Only MBTA operated vehicles are included here, not cars from the Boston Elevated Railway era.

Years in ServiceManufacturerModelImageLengthWidthFleet NumbersQuantity
1976–2007Boeing VertolUS Standard Light Rail Vehicle71 ft (22 m)104 in (2.64 m)3400–3543144 (31 units cancelled)
1937–1985[a]Pullman StandardPCC streetcar48 ft (15 m)100 in (2.54 m)3000–3346344 (2 cars scrapped before 1964)
  1. ^10 PCC streetcars are currently in revenue service on theMattapan Line.

History

[edit]

Early rolling stock

[edit]
PCC streetcars on the D branch in 1965

When it opened at the end of the 19th century, the Tremont Street subway was not intended as a full-scale rapid transit line (though it was built tosemi-metro standards), but to allow ordinary streetcars to bypass the worst street congestion in downtown Boston.[6][13] Operations by several different companies were eventually consolidated into the Boston Elevated Railway, which ran a mixture of car types. After receiving a test unit in 1937, the BERy began to standardize onPCC streetcars, acquiring 320 units between 1941 and 1951 plus an additional 25 in 1959 to phase out the last older cars.[12] Beginning in 1923, all streetcars on the system were painted orange for maximum visibility in traffic. In 1971, the MBTA began painting Green Line streetcars in a green and white scheme to match the new line name.[14]

Two older streetcars are on display on the unused outer inbound track at Boylston station, which formerly carried cars coming from thePleasant Street portal. Car #5734, a Type 5 A-1 car built in 1924 and retired in 1959, is owned by theSeashore Trolley Museum, but resides semipermanently in Boston. PCC #3295, built in 1951 and retired in 1986, is owned by the MBTA.[12] The cars were formerly used forfantrips, the most recent one being in 1998.

Boeing LRV

[edit]
Main article:US Standard Light Rail Vehicle
Boeing LRV on the C branch in 2005

In the early 1970s,light rail—which had largely disappeared from North America after the slow decline of streetcar systems from the 1920s to the 1950s—was reintroduced as a method ofurban renewal less expensive than conventional metro systems.[15] In 1971, as part of a program to supply further work to defense contractors as theVietnam War wound down, theUrban Mass Transit Administration selectedBoeing Vertol as systems manager for a project to design a new generic light rail vehicle. The UMTA hoped that this "US Standard Light Rail Vehicle" would jumpstart the development of transit lines just as the standardized PCC streetcars had done decades prior.[16]

Boston (with its older streetcar tunnel systems) and San Francisco (with a newMuni Metro streetcar tunnel being built as part ofBART construction) were chosen as the testbeds for this new rolling stock.[15][17] The vehicle was designed as the largest rolling stock that would fit through the Tremont Street tunnel, the Muni Metro'sTwin Peaks Tunnel, andSEPTA'ssubway–surface lines tunnel.[13] The new cars were faster—a top speed of 50 miles per hour (80 km/h) versus the PCC's 36 miles per hour (58 km/h)—and had an articulated middle section for higher capacity.[13]

Boeing began construction of 175 cars for the MBTA in May 1973.[16] The first LRVs entered service on the D branch in December 1976 but were immediately beset with problems. Certain cars frequently derailed on tight turns in the Riverside, Boston College and Lechmere yards. Battery trays, air conditioners—mounted under the cars, continually drawing in dirt and debris from under the car when in the tunnels—and air compressors all suffered numerous failures; the plug-style doors had trouble sealing properly; and traction motors failed sooner than expected.[18]

Desperate for reliable rolling stock, in 1977 MBTA launched an overhaul program to extend the availability of its older PCC cars. A total of 34 cars, primarily out-of-service wrecks and parts cars, were rebuilt to as-new condition.[18] As of 2022[update], some of these rebuilt PCC cars still run on theMattapan Line.[12][18]

After years of fighting between the MBTA and Boeing-Vertol, both sides reached a settlement in 1979. MBTA was allowed to reject the final 40 SLRVs, and Boeing would return $40 million to MBTA for the cost of repairs and modifications to several cars.[19][20]

Modern fleet

[edit]
Type 7 (left) and Type 8 streetcars at Tappan Street in 2012

In the early 1980s, with a final settlement with Boeing in place, MBTA started looking for new equipment to supplement and replace the problematic LRVs.

In 1980, the MBTA testedCanadian Light Rail Vehicles for three months to determine whether they could be used on the Green Line.[21] The MBTA ultimately found them unsuitable.

Ultimately, the MBTA purchased LRVs from the Japanese firmKinki Sharyo. These Type 7 were designed with the best features of the US SLRV, the Canadian LRV, and the PCC cars. A total of 120 Type 7 vehicles were purchased, 100 were delivered between 1986 and 1988, and an additional 20 cars ordered and delivered in 1997.[22]

Low-floor LRVs were added starting in 1998, allowing for accessible boarding directly from slightly raised platforms. MBTA ordered 100 of these Type 8 cars fromItalian companyAnsaldoBreda.[12] The first Type 8s entered revenue service in March 1999, and quickly proved problematic and difficult to maintain: the first cars failed every 400 miles (640 km), far short of the 9,000 miles (14,000 km) specified by the MBTA, and were prone to derailment at higher speeds as well as brake problems, echoing the problems with the Boeing stock. In December 2004, the MBTA canceled orders for the cars still to be delivered as part of the authority's nine-year, US$225 million deal with Breda.[23] One year later, in December 2005 the MBTA announced that it had entered into a restructuring of the deal, reducing the order to 85 cars (with spare parts to be provided in lieu of the 15 remaining cars), and providing for the remaining payment under the original deal only if the cars met performance requirements.[24] Construction of the last car under the order was completed on December 14, 2006.[25] Ultimately, 10 additional cars would be assembled and delivered in late 2007, with five spare shells retained (95 cars in service). The MBTA was criticized for their failure to assess Bredas' reliability before entering into the deal, and during delivery. The agency was also forced to spend an additionalUS$9.5 million to modify tracks to prevent derailments and the Type 8 fleet was unable to be used on the D branch (where cars reach full speed) after those modifications were complete in 2008.[7]

As the final Type 8s were delivered, the last of the Boeing-Vertol cars were retired in March 2007 and all except ten of the cars were scrapped.[26] Of the remaining cars, six were sold to the US Government and are now inPueblo, Colorado for testing purposes, one was given to theSeashore Trolley Museum, and three were retained by the MBTA for work service.

In 2006, as part of alegal settlement, the MBTA committed to always operate at least one low-floor car in each train, with no trains consisting only of Type 7 cars.[27]

Of the 120 Type 7 cars, 103 were overhauled byAlstom inHornell, New York. The work includes new propulsion systems, climate control systems and interiors as well as exterior work. The pilot car for the program left in October 2012 and was returned in November 2014, with the last car overhauled in April 2019.[28][12]

Type 9
[edit]
Type 9 LRV at Cleveland Circle in 2023

Twenty-four new Type 9 Green Line cars were delivered between 2017 and 2020. Revenue service began in late 2018 and all 24 cars were planned to enter service by the fall of 2019, although actual acceptance continued through 2021. The Type 9 cars will provide additional rolling stock to allow forGreen Line Extension operations, and will not replace any of the existing fleet.[29] The cars were made byCAF USA, Inc., with the shells and frames made in Spain, and final assembly and testing done at their plant inElmira, New York.[30] As of March 2017[update], the first unit had been expected to enter passenger service in Spring 2018, with all 24 cars in service by the end of the year.[31] The first Type 9 car, #3900, began revenue service on December 21, 2018.[32]

Future fleet

[edit]
A full-scale mockup of the planned Type 10 "Supercar" LRV

Planning for a Type 10 fleet—which would replace all Type 7 and Type 8 cars in the mid-2020s—began in 2018 with plans for a fullylow floor fleet.[33][34] At 113 feet (34 m) long, Type 10 cars would be significantly longer than the existing fleet, and carry twice as many passengers as existing cars.[35] The MBTA released arequest for proposals in December 2019, with notice to proceed expected to be given in 2021. In June 2021, the MBTA indicated that the initial order would be for 102 LRVs operating as single cars, with two-car trains deferred for a later project with federal funding. Manufacturer bids were due in July 2021.[36]

The MBTA awarded an $811 million contract toCAF USA on August 31, 2022, to manufacture 102 seven-segment Type 10 "Supercar" LRVs. Four pilot vehicles are to be delivered in spring 2026, with deliveries of two LRVs per month from spring 2027 to spring 2031.[37] The contract included options for additional LRVs.[38] As a separately-funded project,Lake Street Yard will be fully reconstructed to support Type 10 vehicles, with Riverside Yard and the GLX Vehicle Maintenance Facility also modified.[39] When the Type 10 cars are delivered, the Type 9 fleet is expected to be transferred over to theMattapan Line, replacing thePCC streetcars.[35]

Accessibility

[edit]
A low-floor Type 8 car at Longwood station, which has slightly raised platforms for accessible boarding
See also:MBTA accessibility

TheRed Line,Blue Line, andOrange Line runrapid transit cars and use stations withhigh platforms level with the car floor providing easy access for the disabled. The Green Line originated as astreetcar line, and used a variety of streetcars before converting to light rail vehicles.

Originally all the Green Line stations had platforms at track level, and passengers had to ascend several steps up into the vehicles. This limited accessibility for persons with disabilities. To address this issue and comply with changing federal and state laws, additional facilities have been added:[40]

  • Wheelchair lifts have been provided at some stops. They are rolled up to the car door and the lift mechanism is operated using a hand crank. They are quite time-consuming to operate, causing significant delays when used during peak periods.
  • Short platforms level with car floors, accessed by ramps, were installed just before or after selected stations. Because the car door arrangement required a large gap between the platform and the car, a bridge plate attached to the raised platform had to be positioned after the train stopped with a door at that platform.
  • The MBTA has followed the worldwide trend of operatinglow-floor streetcars. Platforms are being raised slightly to about the height of a street curb. Low-floor cars have remotely controlled bridge plates at the center doors to allow wheelchairs and strollers to reach the car floor a few inches higher.[citation needed] As of 2022[update], the D branch will be the first branch to be completely retrofitted with raised platforms as part of this program.[41]

History

[edit]
See also:History of the MBTA andBoston-area streetcar lines

Beginning in the 1850s, Boston sprouted a large network ofhorsecar lines, the first public transit in the city. TheWest End Street Railway was created by the state legislature in 1887 to build a single line, but soon consolidated many of the existing lines into a single privately owned system with consistent fares and route designations. The Allston – Park Square line (which served the general area of theA branch) was the first section to be converted toelectric traction in 1889. It used modified existing horsecars outfitted withFrank J. Sprague's revolutionary electrical equipment, which had first been demonstrated the previous year inRichmond, Virginia.[42]: 9–10  In 1897, the West End Street Railway property was handed over to the Boston Elevated Railway in the form of a 24-year lease, and the companies were ultimately combined.

By the early 1890s, the sheer quantity of streetcars during peak periods was clogging the streets of downtown Boston. The Tremont Street subway, the first passenger subway in North America, was opened in stages in 1897 and 1898, with underground stations atBoylston, Park Street,Scollay Square,Adams Square, andHaymarket. TheMain Line Elevated was run through the tunnel from 1901, displacing through-running streetcars,[42]: 19–21  until it was rerouted to its ownWashington Street Tunnel in 1908, and the streetcars were returned to the Tremont tunnel.[42]: 27 

Though initially intended merely to clear streetcars from the busiest sections of downtown streets, the Tremont Street subway became useful as a rapid transit service in its own right. The 1912 completion of theCauseway Street Elevated andLechmere Viaduct extended grade-separated service toLechmere Square in Cambridge, and in 1922 theLechmere transfer station was built. In 1914, the Boylston Street subway opened as a westward extension to just short ofKenmore Square, and in 1933Kenmore station and short tunnel extensions towards two surface lines were added. In 1941, theHuntington Avenue subway and its two additional underground stations removed the last surface streetcars from downtown Boston.

Beginning in the 1930s, themassive surface streetcar system was "bustituted" with buses andtrackless trolleys which had lower operating costs and more flexible routes. As the 1950s closed out, the only remaining streetcar lines were theWatertown Line,Commonwealth Avenue Line,Beacon Street Line,Arborway Line, and theLenox Street Line plus severalshort turn services. In 1959, theBoston and Albany Railroad's Highland Branch was converted to theRiverside Line, a fully grade-separated suburban service. In 1961, the last through service to Lenox Street via thePleasant Street portal ended, though a Pleasant Street – Boylston shuttle continued for one more year. In 1963, part of the original subway was rebuilt underGovernment Center, abandoning and partially demolishing Adams Square station.

In 1947, the now-bankrupt BERy was replaced by the publicMetropolitan Transit Authority (M.T.A.). The new agency was unpopular, even spawninga popular protest song; in 1964, it was replaced with theMassachusetts Bay Transportation Authority which had an expanded funding area to preserve suburban commuter rail lines. In 1967, as part of a systemwide rebranding that included new station names and color names for the transit lines, the remaining streetcar services were designated the "Green Line" because several of them traveled near theEmerald Necklace park system. The streetcar lines were given letter designations: "A" to the Watertown Line, "B" to the Commonwealth Avenue Line, "C" to the Beacon Street Line, "D" to the Riverside Line, and "E" to the Arborway Line.

The Watertown Line ran mostly inmixed traffic after diverging from Commonwealth Avenue; it was permanently replaced with buses in 1969. The section of the Arborway Line pastHeath Street was "temporarily" – ultimately permanently – bustituted in 1985. In 2001, with new low-floor streetcars entering service, the MBTA began retrofitting underground stations and major surface stops with low raised platforms for accessibility for all. In 2004, the Causeway Street Elevated was replaced with a new tunnel under theBoston Garden, which consolidated the Orange Line and Green Line at a newNorth Station "superstation", while continuing to connect to Commuter Rail service north of Boston.

The name "Green Line" was assigned in 1967 as part of a major reorganization of the MBTA system's branding.[7] In the 1970s, the Green Line and all other MBTA lines were re-evaluated by theBoston Transportation Planning Review for region-wide efficacy and future modernization alternatives initiated as far as physical plant and operating measures.

Operations and signaling

[edit]
Trains on the D branch operate using wayside signals.

As of February 2023[update], each of the four branches operate on 7- to 9-minute headways during weekday peak hours, and 8- to 12-minute headways at other times. Vehicle usage ranges from 45 trains (90 cars) to 62 trains (124 cars).[43]

Unlike the MBTA's heavy rail subway lines, the Green Line has only limited central control and monitoring. This also means that it has lagged behind the other three rail lines in the availability of countdown signs and "next train" arrival information. The line is signalled with advisorywayside signals, except on surface portions in street medians orin-street running. Wayside signal territory stretches from Lechmere to the surface portals at Kenmore, and along the entire length of the D–Riverside branch. There are noautomatic protection devices, but the cars havetrack brakes, giving the ability to stop quickly under control of the operator. Interlockings are controlled through a wayside Automatic Vehicle Identification (AVI) system that relies on the operator properly entering the destination manually on a roto-wheel in the train cab at the beginning of a run.

The line is monitored from theOperations Control Center (OCC). Responsibility for controlling service is shared by the control room and field personnel along the right of way. Track circuit and signal indications are not transmitted to the operational personnel sites. In lieu of track circuit indications, the AVI system is displayed in the control room to provide a periodic update to train position wherever AVI detectors exist. The AVI system user interface was solely text based until the current control room was opened, in which a new schematic display based on AVI data was instituted. Track circuit indications are available digitally in signal houses at the Park Street interlocking, at the new North Station interlocking, and at the new Kenmore interlocking, but are not transmitted to OCC. In January 2013, the MBTA announced plans to add full vehicle location tracking on the Green Line for countdown signs and smartphone applications, including using AVI data in the tunnels and GPS receivers on the surface lines.[44] The first real-time data—location data on the surface lines—became available in October 2014. Full tracking was expected by early 2015.[45]

The MBTA typically runs two-car trains at all times. The last scheduled use of one-car trains on weekdays was in March 2007.[7] Three-car trains were added on the B and D branches in 2010 – their first use since 2005 – and a four-car train was tested in April 2011.[7] In March 2011, the number of three-car trains was substantially increased, including use on the E branch.[7][46] However, three-car trains suffered from reliability problems and slow boarding.[47] The use of three-car trains ended in March 2016.[7]

Positive train control

[edit]

The MBTA approved an $82.6 million contract in May 2019 for atrain protection system for the Green Line. The system would enforce red signals and automatically stop a train if it approached another train too closely.[48] The project was 28% complete by December 2021; installation of in-vehicle electronics was scheduled to be complete by September 2023, with wayside installation complete in June 2024 and full operation that December.[49] A reallocation of funds in January 2022 shortened the project timeline, with completion expected in 2023.[50] However, in January 2023, an NTSB report found that the project had been delayed to June 2025.[51] The MBTA cancelled the contract in June 2024 citing a lack of progress and an inability by the contractor to complete the project.[52]

The MBTA worked with a different contractor to develop the GLTPS-2 system in two phases. Phase 1, expected to be installed on the existing Type 7, Type 8, and Type 9 fleet by the end of 2025, will be an operator warning system with alarms that trigger when a train is exceeding speed limits or is at risk of imminent collision with another train. Phase 2, which will be installed only on the Type 9 and future Type 10 fleet, adds automatic enforcement by braking and is planned to be finished by June 2028. A $112.5 million contract to install the system was approved in February 2025.[53]

Turnarounds

[edit]
A D branch train on the loop at Kenmore station in 2024

Aside from the terminal stations, several locations haveturnaround loops orcrossover switches where trains can reverse direction forshort turns. One of these, where northbound trains can turn southbound, is regularly used as the downtown terminal for two of the branches:

Several other loops and crossovers are not used in regular revenue service but may be used during construction work or service disruptions, or for non-revenue trains, with some having been regularly used as terminals in the past:[2][7]

  • AtNorth Station, a pair ofpocket tracks allow reversing.
  • At Government Center, theBrattle Loop allows southbound trains to turn northbound, however, this loop is currently only used during service disruptions.
  • AtPark Street, a loop connects the inner tracks. The MBTA plans to add a crossover to allow through movements from the terminating (inner) northbound platform at Park Street are expected to increase capacity and reliability.[54]
  • AtKenmore, a loop allows eastbound (inbound) C and D branch trains to turn westbound.
  • On the B branch, a pocket track atBlandford Street allows trains to reverse in either direction. It is sometimes used to reverse westbound trains to provide extra service in the subway. Occasionally-used crossovers are located atBabcock Street,Washington Street, and east ofBoston College.
  • On the C branch, occasionally-used crossovers are located atSt. Mary's Street andCoolidge Corner.
  • On the D branch, occasionally-used crossovers are located west ofFenway,Brookline Hills,Beaconsfield,Reservoir,Newton Highlands, andWaban. At Reservoir, the spur tracks to Reservoir Carhouse have platforms for short turn trains.
  • On the E branch, crossovers are located atPrudential,Northeastern University, andBrigham Circle, along with a siding at Northeastern. The Brigham Circle crossover is frequently used for short turns during traffic congestion on the street-running section of the line.

Location tracking

[edit]
Activated countdown signs at Kenmore station in August 2015

The Red, Orange, and Blue lines have block signalling systems that make tracking the location of trains easier. Signs in most station on those lines began to display real-time train information in late 2012 and early 2013, while data feeds have been available for smartphone applications since 2010.[44] However, the wayside signalling system used in the Green Line's tunnels and the D branch does not provide for that level of tracking, nor do the basic stop/go signals used on the street-level branch lines. In January 2013, the MBTA announced plans to provide full tracking data for the Green Line by 2015, allowing use of smartphone applications and in-station countdown signs.[44] The $13.4 million system is funded by MassDOT; it uses existing Automatic Vehicle Identification (AVI) systems plus additional sensors in the tunnels, and GPS receivers on the surface sections.[55]

In September 2013, the MBTA announced that "Next Train" signs would be unveiled atKenmore that month.[56] On October 23, 2014, location tracking data became available for Green Line trains above ground. Arrival predictions for surface stations – including the activation of countdown signs along theD branch – and underground tracking and predictions were to be rolled out in two phases by early 2015.[45] In March 2015, the MBTA announced that enough AVI equipment had been installed to allow the release of some underground data by April.[55] Most underground data was live by August, but trains near Park Street and Boylston waited until September.

The first predictive countdown signs on the Green Line were activated atNewton Centre andNewton Highlands on April 24, 2015, followed shortly by other D branch stations.[57] Countdown signs at Kenmore and Hynes were activated in August 2015. Signs at Copley and Arlington plus eastbound-only signs from Boylston through Science Park were activated in October 2015.[58] The final set of signs – those on the westbound platforms of Science Park through Boylston – were activated in January 2016. Because holding and short-turning trains at the downtown terminals makes time-based predictions unreliable, the signs instead show how many stops away a train is.[59]

Projects

[edit]

Somerville/Medford extension

[edit]
Map of the Green Line Extension. Nearby parts of the Red Line and Orange Line are also shown.

TheGreen Line Extension (GLX) project added two new branches into the northern suburbs ofSomerville andMedford. The project opened in two phases in 2022 at a total cost of $2.28 billion. The rebuiltLechmere station and the Union Square Branch toUnion Square opened on March 21, 2022, as an extension of the D branch (briefly the E branch). The Medford Branch opened toMedford/​Tufts on December 12, 2022, as an extension of the E branch, with intermediate stations atEast Somerville,Gilman Square,Magoun Square, andBall Square.[60][61] The total project cost is estimated to be $2.28 billion: $0.996 billion from the federal government and $1.28 billion from the state. Daily ridership on the extension is projected to be 45,000 by 2030.[62]

The GLX begins at the north end of theLechmere Viaduct, with a new elevated line continuing north for about 0.6 miles (0.97 km) parallel to theO'Brien Highway. The former surface-level Lechmere station was replaced by an elevated station on the new alignment. The two branches split with an aerialflying junction on the Red Bridge viaduct in theInner Belt area. The Union Square Branch runs 0.7 miles (1.1 km) west from Red Bridge, sharing theFitchburg Line right of way. The Medford Branch runs 3.0 miles (4.8 km) northwest from Red Bridge, sharing theLowell Line right of way. Like the existing D branch, the new branches are fully grade-separated, with nolevel crossings. A new vehicle storage yard and maintenance facility is located in the Inner Belt area, with leads from both branches at Red Bridge. An extension of theSomerville Community Path runs along the Medford Branch south of Lowell Street, with a high bridge carrying it above the Red Bridge viaduct.

An extension north from Lechmere was first proposed in the 1920s, and again several times during the 20th century. To settle a lawsuit with theConservation Law Foundation to mitigate increased automobile emissions from theBig Dig, the Commonwealth of Massachusetts agreed in 1990 to extend the Green Line from Lechmere to Medford Hillside through Somerville and Medford, two suburbs underserved by the MBTA relative to their population densities, commercial importance, and proximity to Boston. After delays in planning, the state agreed in 2006 to complete the project by 2014.[63] The preferred alternative from the 2009 Draft Environmental Impact Report added the Union Square Branch; the Medford Branch terminus was set as College Avenue, with a potential future extension toMystic Valley Parkway.

The planned completion was delayed to 2018 in 2011, and to 2020 in 2014.[64][65] A groundbreaking ceremony was held in December 2012.[66] The project was expected to cost about $2.2 billion, with half of that paid by theFederal Transit Administration (FTA). However, in 2015 it became clear that the project would cost $3 billion, putting its future in doubt.[67] The project wasvalue engineered to reduce its cost: station designs were simplified, several bridge reconstructions eliminated, the Community Path extension shortened, and the maintenance facility reduced in size.[68][69] The FTA approved the modified $2.3 billion plan on April 4, 2017.[70] The contract was rebid with a provision for the optional restoration of six of the elements deleted in the 2016 plan. The winning bid, selected in November 2017, included six optional elements, including canopies and additional elevators at stations, public art, a full-size vehicle maintenance facility, and the full extension of the Community Path to East Cambridge.[71][72] Construction reached 20% completion in November 2019; it was over 50% completed by October 2020, and 80% by June 2021.[73][74][75]

Accessibility renovations

[edit]
Government Center station under reconstruction in September 2014

The majority of the Green Line opened by 1959, long before the 1990Americans with Disabilities Act mandated that new construction be fullyaccessible. The MBTA began modifying Red, Orange, and Blue Line stations for accessibility in the late 1980s; however, Green Line stations were not modified until the late 1990s, when the Type 8 vehicles were under construction. The MBTA began the Light Rail Accessibility Program in 1996.[76]: 30  Because modifying the numerous stations all at once would be prohibitively expensive, the MBTA designated "key stations" – largely those with high ridership or bus connections – for prioritization.[77]

Riverside station was completely rebuilt with raised accessible platforms around 1998.North Station andPark Street (both of which already had elevators from previous projects) were outfitted withportable lifts for temporary accessibility around 2000, as wereLechmere and ten surface stations.[77] Between 2001 and 2003, 16 surface stations (4 on the B branch, 4 on the C branch, 3 on the D branch, and 5 on the E branch) were retrofitted with raised platforms.[78] The 13 B, C, and E branch stations collectively cost $32 million.[79] Construction of raised platforms was completed at Park Street and Haymarket around 2003; Prudential was also reconstructed that year by the developer of111 Huntington Avenue. The fully accessible underground "superstation" at North Station opened in 2004.[7] Woodenmini-high platforms, allowing level boarding on older Type 7 LRVs, were installed at eight Green Line stations in 2006–07 as part of the settlement ofJoanne Daniels-Finegold, et al. v. MBTA.[27][80]

Renovations for accessibility were completed atArlington in 2009,[81]Kenmore andCopley in 2010,[82][83] andScience Park in 2011.[84] A two-year closure ofGovernment Center ended in 2016 with the opening of the accessible transfer station.[85] As part of the Green Line Extension, Lechmere was replaced by a fully accessible elevated station in 2022.[86] Reconstruction work on Symphony is expected to take place from 2025 to 2028.[87]Hynes Convention Center (with renovations in design) andBoylston are the other remaining inaccessible stations in the central subway.[86]

Other projects have moved towards full accessibility of the surface branches.Woodland was made accessible in 2006.[88] Renovations completed in 2009 madeLongwood accessible for the first time, and replaced the lifts atBoston College andBrookline Village.[89][90] A reconstruction ofBrookline Hills (replacing lifts) was completed in 2022.[91] Construction of two accessible stations (Babcock Street andAmory Street) on the B branch to replace four non-accessible stations took place in 2021.[92] Temporary work to makeNewton Highlands accessible was done in 2019, followed by the four remaining D branch stations in 2024; larger reconstructions of the five stations are planned for later in the 2020s.[87] Several other surface accessibility projects are planned:

  • The nine remaining non-accessible B branch stations are to be reconstructed in 2025–2027. Consolidations will reduce the nine stops to six.[87]
  • The nine remaining non-accessible C branch stations are to be reconstructed in 2025–2026. Consolidations will reduce the nine stops to seven.[87]
  • The four remaining non-accessible E branch stations are to be reconstructed in 2027–2029. Consolidations will reduce the four stops to two.[87]

Core Capacity Program

[edit]

In the late 2010s, the MBTA began planning a capital project to meet future capacity needs that year on the Green Line. A study completed in 2018 settled on the size for Type 10 vehicles and evaluated infrastructure needed to support the new vehicles. In 2022, the MBTA entered the project development phase for theFederal Transit Administration Capital Investment Grants Program, which provides funding for "core capacity" projects on crowded sections of existing transit systems. As of April 2025[update], the MBTA intends to enter the engineering phase by mid-2025, with the full funding grant agreement expected in late 2028 and construction lasting through the mid-2030s. In April 2025, the MBTA Board approved plans for the $3.8 billion Core Capacity Program, of which half ($1.9 billion) would be federally funded. It includes:[93]

  • Signal upgrades, new crossovers, and other work in the Central Subway
  • Systemwide overhead catenary relocation
  • Traction power improvements on the D Branch
  • Modifications to the Riverside, Reservoir, Lake Street, and Inner Belt yards
  • Accessibility and infrastructure work on the B and E branches
  • 58 additional Type 10 vehicles
  • A test track between Chestnut Hill and Newton Centre for Type 10 vehicles
  • Upgrades to a Type 10 simulator for operators

Station listing

[edit]

This listing includes only the Green Line section betweenLechmere andKenmore, which are served by multiple branches. For stops served by only one branch, seeGreen Line B branch § Station listing,Green Line C branch § Station listing,Green Line D branch § Station listing, andGreen Line E branch § Station listing. All stations in the central subway haveprepaid fare areas (fare control).

LocationStationBranchesOpenedNotes and connections
East CambridgeDisabled accessLechmereD, EMarch 21, 2022TheLechmere Viaduct opened on June 1, 1912, with a direct connection to surface lines until July 9, 1922. The surface station was open from July 10, 1922, to May 23, 2020.
MBTA bus:69,80,87, 88
Bus transportEZRide
West EndDisabled accessScience ParkAugust 20, 1955
North EndDisabled accessNorth StationJune 28, 2004Original surface station was open from September 3, 1898, to March 27, 1997. Elevated station was open from June 1, 1912, to June 24, 2004.
MBTA subway:Orange Line
MBTA Commuter Rail:Fitchburg,Lowell,Haverhill,Newburyport/Rockport
MBTA bus:4
Amtrak:Downeaster
Bus transportEZRide
Disabled accessHaymarketSeptember 3, 1898MBTA subway:Orange Line
MBTA bus:4,92,93,111,354,426,428, 450
Downtown BostonDisabled accessGovernment CenterB, C, D, EMBTA subway:Blue Line
MBTA bus:354
Disabled accessPark StreetSeptember 1, 1897MBTA subway:Red Line,Silver Line (SL5)
MBTA bus:43
AtDowntown Crossing:Orange Line;7,11,501,504, 505
BoylstonMBTA subway:Silver Line (SL5)
MBTA bus:43
Back BayDisabled accessArlingtonNovember 13, 1921MBTA bus:9,501, 504
Disabled accessCopleyOctober 3, 1914MBTA bus:9,10,39,55,501, 504
Hynes Convention CenterB, C, DMBTA bus:1, 55
Fenway–KenmoreDisabled accessKenmoreOctober 23, 1932MBTA bus:8,19,57,60, 65
AtLansdowne:Framingham/​Worcester Line

Incidents and collisions

[edit]
Type 7 LRV car wrecked in the May 2008 crash

On May 28, 2008,two D branch trains collided inNewton. The operator of one of the trains was killed and numerous riders were taken to area hospitals with injuries of varying degrees of seriousness. While it was originally thought that cell phone use was responsible for the crash, the cause was officially determined to be an episode ofmicro-sleep caused by the driver'ssleep apnea.[94]

On May 8, 2009, two trolleys rear-end collided underground between Park Street andGovernment Center when the driver of one of the trolleys, 24-year-old Aiden Quinn, wastext messaging his girlfriend while driving.[95] Quinn had run through a red light before the crash, which injured 46 people. MBTA officials estimated that the cost of the crash was $9.6 million.[96] A strict ban on cell phone usage by MBTA operators was later enacted.[97]

On October 8, 2012, two E branch trolleys collided in the 700 block ofHuntington Avenue nearBrigham Circle when one derailed into the other, injuring three people including a train operator.[98] The next month on November 29, two trolleys collided at low speed atBoylston, injuring several dozen passengers.[99]

On March 10, 2014, a D branch trolley with passengers aboard derailed in the tunnel just west of Kenmore Station, near theflat junction between the "D" and "C" branches. A second train had to brake suddenly to avoid hitting the derailed train.[100] Ten people were treated for moderate injuries.[101]

In October 2016,The Boston Globe reported that the Green Line had the highest number of derailments and collisions on light rail lines in the United States in 2015. The number of incidents had been increasing for several years due to deferred maintenance on tracks and wheels, which resulted in more low-speed derailments of Type 8 cars.[102]

On July 30, 2021, two B branch trains collided atBabcock Street, causing 25 injuries.[103]

On October 1, 2024, a train derailed nearLechmere, injuring seven people and disrupting service on theGreen Line Extension.[104][105] Regular service resumed on October 3. TheNational Transportation Safety Board,Federal Transit Administration, and Massachusetts Department of Public Utilities are investigating the derailment.[106] A preliminary NTSB report noted the train was going 36 mph in a 10 mph zone and passed through a double red signal that required a stop. The train passed through a switch that was still moving into position, causing part of the first truck of the lead car to go straight and the rest of the train into the diverging track and causing the derailment.[107]

On February 9, 2025, a E branch train crashed into an out of service train atEast Somerville, injuring five people.[108]

In 2009, theNational Transportation Safety Board recommended that the Green Line be outfitted withpositive train control to prevent collisions as part of its various crash investigations. The MBTA decided in 2012 not to implement PTC, estimating the cost at $645 million to $721 million. In 2015, as crashes continued to happen, the NTSB complained the agency was moving too slowly identifying a feasible alternative. In 2019, the MBTA awarded a contract to implement a similar safety system by 2024, at a cost of $170 million. A train would automatically brake if a driver violated a traffic signal, or if cameras or radar detected an obstacle.[109] That contract was cancelled in June 2024.[52] A new contract was awarded in February 2025 fora new system that would provide warnings to operators by the end of 2025, and enforce violations with automatically braking by mid-2028.[53]

References

[edit]
  1. ^O'Hara, Mary Ann; Turners, Pat (August 22, 2024)."History of Funding Update"(PDF). Massachusetts Bay Transportation Authority. p. 2.
  2. ^abc"Ridership and Service Statistics"(PDF) (14th ed.).Massachusetts Bay Transportation Authority. 2014.
  3. ^Booz • Allen & Hamilton Inc. (1995)."Applicability of Low-Floor Light Rail Vehicles in North America"(PDF). Transit Cooperative Research Program. RetrievedAugust 7, 2013.
  4. ^"Green Line Transformation (GLT) Program Project Development Profile: FY 2024 Annual Report".Federal Transit Administration.
  5. ^"Green Line D Track and Signal Replacement | Projects | MBTA".www.mbta.com. RetrievedApril 5, 2025.
  6. ^abMost, Doug (January 26, 2014)."The bigger dig". Boston Globe. RetrievedJanuary 22, 2016.
  7. ^abcdefghijBelcher, Jonathan."Changes to Transit Service in the MBTA district"(PDF).Boston Street Railway Association.
  8. ^Sanborn, George M. (1992).A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived fromthe original on November 27, 2019. RetrievedJanuary 21, 2016 – via MIT.
  9. ^"Curiosity Carcards"(PDF). Massachusetts Bay Transportation Authority. Archived fromthe original(PDF) on February 18, 2017. RetrievedJanuary 21, 2016.
  10. ^Malikova, Alexandra A. (June 2012)."MBTA Green Line 3-Car Train Operating Plans to Enhance Reliability and Capacity (Master's Thesis)"(PDF). Massachusetts Institute of Technology Department of Civil and Environmental Engineering. RetrievedAugust 7, 2013.
  11. ^Clarke, Bradley H. (2003).Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association.ISBN 0938315056.
  12. ^abcdef"The MBTA Vehicle Inventory Page". NETransit. RetrievedSeptember 23, 2018.
  13. ^abcDiamant, Emanuel S.; et al. (Spring 1976)."Light Rail Transit : A State of the Art Review". United States Department of Transportation. RetrievedAugust 7, 2013.
  14. ^"This Time In History".Rollsign. Vol. 58, no. 9/10.Boston Street Railway Association. September–October 2021. p. 14.ISSN 0035-7898.
  15. ^abThompson, Gregory L. (November 2003)."Defining an Alternative Future: Birth of the Light Rail Movement in North America"(PDF). Transportation Research Board. RetrievedAugust 7, 2013.
  16. ^ab"History: Light Rail Vehicle/Rapid Transit Car". Boeing. RetrievedAugust 7, 2013.
  17. ^Vuchic, Vukan R. (October 1972).Light Rail Transit Systems: A Definition and Evaluation (Report). Urban Mass Transportation Administration, US Department of Transportation. RetrievedDecember 20, 2018.
  18. ^abcMoore, Scott."Boston's Green Line Crisis". NETransit. Archived fromthe original on April 6, 2004. RetrievedAugust 7, 2013.
  19. ^Sheley Jr., W. H. (November 10, 1980).Massachusetts Bay Transportation Authority's Termination of Contract for Light Rail Vehicles PSAD-81-11(PDF) (Report). United States General Accounting Office. RetrievedDecember 22, 2018.
  20. ^Sullivan, Kathleen (September 14, 1998)."Muni knew about trolley lemons in '70s: Test runs in Boston found major trouble in many systems".The San Francisco Examiner. p. A. RetrievedDecember 7, 2012.
  21. ^A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. 1981. p. 14 – via Internet Archive.
  22. ^"Boston – MBTA: Green Line – Technical Data"(PDF). Kinki-Sharyo. Archived fromthe original(PDF) on July 20, 2014. RetrievedAugust 7, 2013.
  23. ^Flint, Anthony. "MBTA Halts Purchase of Green Line 'Lemons'" (mirrored copy).The Boston Globe. December 12, 2004.
  24. ^Daniel, Mac (December 17, 2005)."Green Line seeks zippier service with upgrade plan".The Boston Globe. Archived fromthe original on January 25, 2007., archived as of January 25, 2007
  25. ^"Bredas".The Boston Globe. December 14, 2006. Archived fromthe original on January 24, 2007. archived as of January 24, 2007
  26. ^"End of the line for T pioneers".The Boston Globe. March 16, 2007. RetrievedAugust 7, 2013.
  27. ^ab"Settlement Agreement"(PDF).Joanne Daniels-Finegold et al. v. MBTA. April 10, 2006. pp. 10–11.
  28. ^Annear, Steve (November 18, 2014)."First of Refurbished Green Line Trolleys Heads Back Home".Boston. Archived fromthe original on February 6, 2017. RetrievedNovember 25, 2014.
  29. ^Annear, Steve (May 13, 2014)."New Green Line Trains Will Hit the Tracks by 2017".Boston. Archived fromthe original on July 13, 2017. RetrievedMay 20, 2014.
  30. ^"CAF wins Boston Green Line order".Railway Gazette. May 16, 2014. Archived fromthe original on August 7, 2020. RetrievedMay 20, 2014.
  31. ^"Green Line Type 9 Project Update"(PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 11. Archived fromthe original(PDF) on March 29, 2017. RetrievedMarch 29, 2017.
  32. ^"New MBTA Green Line Car goes into Passenger Service" (Press release). Massachusetts Bay Transportation Authority. December 21, 2018.
  33. ^"Green Line Transformation Program: Future Capacity Study Update - Fiscal & Management Control Board"(PDF).MBTA. May 7, 2018. RetrievedFebruary 10, 2021.
  34. ^Brelsford, Laura (May 26, 2020)."SWA Initiatives—May 2020"(PDF). p. 18.
  35. ^abVaccaro, Adam (January 31, 2020)."Next on the MBTA spending spree: bigger Green Line cars".Boston Globe. RetrievedFebruary 10, 2021.
  36. ^Peña, Angel (June 21, 2021)."Green Line Transformation (GLT) Update"(PDF). Massachusetts Bay Transportation Authority. p. 9.
  37. ^Peña, Angel; Wolfgang, Bill (August 31, 2022)."RFP No 367F-19 Type 10 Supercar Update and Procurement Award"(PDF). Massachusetts Bay Transportation Authority.
  38. ^"System-Wide Accessibility Initiatives—December 2022"(PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022.
  39. ^"Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed"(PDF). Massachusetts Bay Transportation Authority. March 2022. pp. 66, 67.
  40. ^"MBTA > About the MBTA > Transit Projects > Transit Projects and Accessibility". Archived fromthe original on January 18, 2012. RetrievedOctober 23, 2018.
  41. ^"MBTA reaches 75 percent design completion on Green Line D branch accessibility improvements project".Mass Transit Magazine. June 3, 2022. RetrievedSeptember 26, 2022.
  42. ^abcCudahy, Brian J. (1972).Change at Park Street Under; the story of Boston's subways. Brattleboro, Vt.: S. Greene Press.ISBN 0-8289-0173-2.
  43. ^Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023".Rollsign. Vol. 60, no. 1–2.Boston Street Railway Association. p. 10.
  44. ^abcRocheleau, Matt (January 22, 2013)."MBTA: Mobile apps will be able to track Green Line trains by 2015".Boston Globe. RetrievedJanuary 22, 2013.
  45. ^ab"CUSTOMERS ARE NOW ABLE TO TRACK GREEN LINE TRAINS" (Press release). Massachusetts Bay Transportation Authority. October 23, 2014. RetrievedOctober 28, 2014.
  46. ^"Green Line to nearly triple the number of 3-car trains" (Press release). Massachusetts Bay Transportation Authority. March 16, 2011.
  47. ^Vaccaro, Adam (May 3, 2016)."Why is the Green Line so crowded?".Boston Globe.
  48. ^"Green Line Train Protection System (GLTPS) System Integration Contract"(PDF). Massachusetts Bay Transportation Authority. May 20, 2019.
  49. ^"GLTPS Monthly Review and Lookahead"(PDF). Massachusetts Bay Transportation Authority. December 15, 2021.
  50. ^"New Funding Accelerates Green Line Train Protection System Project Timeline" (Press release). Massachusetts Bay Transportation Authority. February 25, 2022.
  51. ^Dolven, Taylor (January 5, 2023)."Green Line crash "would have been prevented" if MBTA had installed train tech earlier, NTSB finds".Boston Globe. Archived fromthe original on January 5, 2023.
  52. ^abDolven, Taylor (June 7, 2024)."T scraps Green Line crash-prevention contract recommended by NTSB in 2009".The Boston Globe. Archived fromthe original on June 7, 2024.
  53. ^abWolfgang, William G.; Wise, Raymond F. (February 25, 2025)."Green Line Train Protection System (GLTPS-2) Procurement"(PDF). Massachusetts Bay Transportation Authority.
  54. ^"MBTA Capital Investment Program FY15-FY19"(PDF). MBTA. March 12, 2014. p. 124. Archived fromthe original(PDF) on July 25, 2014. RetrievedApril 23, 2015.
  55. ^ab"MBTA installing underground tracking system for Green Line trolleys" (Press release). Massachusetts Bay Transportation Authority. March 3, 2015. RetrievedMarch 12, 2015.
  56. ^Annear, Steve (September 18, 2013)."The MBTA's Green Line Is Getting 'Next Train' Electronic Information Boards".Boston Magazine. Archived fromthe original on April 8, 2016. RetrievedSeptember 18, 2013.
  57. ^"Green Line's First Countdown Signs Go Live in Newton" (Press release). Massachusetts Bay Transportation Authority. April 24, 2015. RetrievedApril 25, 2015.
  58. ^Roberts, Sarah (October 6, 2015)."Green Line to get countdown clocks in downtown stations".Boston Globe. RetrievedOctober 6, 2015.
  59. ^Levenson, Eric (January 20, 2016)."Why the Green Line's new countdown clocks measure 'stops away' instead of time".Boston Globe. RetrievedJanuary 20, 2016.
  60. ^MacCormack, Terry (March 21, 2022)."Baker-Polito Administration Celebrates Opening of the Green Line Extension" (Press release).Government of Massachusetts. Archived fromthe original on December 4, 2022. RetrievedDecember 13, 2022.
  61. ^"MBTA Celebrates Opening of the Green Line Extension Medford Branch" (Press release).Massachusetts Bay Transportation Authority. December 12, 2022.
  62. ^"About the Green Line Extension Project". Massachusetts Department of Transportation. RetrievedSeptember 28, 2020.
  63. ^Cummings, Claire (August 9, 2007)."Proponents rap delay to extend Green Line".The Boston Globe. RetrievedAugust 26, 2007.
  64. ^Byrne, Matt (August 1, 2011)."State: Green Line extension will be delayed til 2018".boston.com (The Boston Globe). RetrievedAugust 1, 2011.
  65. ^Metzger, Andy (September 13, 2014)."Green Line Extension Cost Rises To $2 Billion". WBUR. RetrievedFebruary 10, 2015.
  66. ^"Green Line Extension Phase 1 Construction Begins".Commonwealth Conversation: Transportation. Massachusetts Department of Transportation. December 11, 2012. Archived fromthe original on June 22, 2013. RetrievedDecember 15, 2012.
  67. ^Vaccaro, Adam (December 14, 2015)."Transit officials won't commit additional state money to Green Line extension".Boston Globe. RetrievedDecember 15, 2015.
  68. ^Interim Project Management Team Report: Green Line Extension Project – Report to the MBTA Fiscal and Management Control Board and the MassDOT Board of DirectorsArchived August 29, 2017, at theWayback Machine Submitted May 9, 2016
  69. ^Vaccaro, Adam (May 13, 2019)."Somerville's getting a brand new bike path with the Green Line extension. Is it wide enough?". The Boston Globe.
  70. ^Dungca, Nicole (April 4, 2017)."Feds OK Green Line extension costs, securing project's future".Boston Globe. RetrievedApril 4, 2017.
  71. ^Jessen, Klark (November 17, 2017)."Green Line Extension Project Design-Build Team Firm Selected" (Press release). Massachusetts Department of Transportation. Archived fromthe original on January 28, 2022. RetrievedJune 22, 2021.
  72. ^"MBTA chooses winning bidder for Green Line extension and awards its biggest contract ever".Boston Globe. Archived fromthe original on April 6, 2019. RetrievedNovember 22, 2017.
  73. ^Thompson, Katie (November 15, 2019)."Construction on Green Line extension 20 percent complete".WCVB.
  74. ^"Baker-Polito Administration, Transportation Officials Visit Green Line Extension Project" (Press release). Massachusetts Bay Transportation Authority. October 1, 2020.
  75. ^Dalton, John (June 21, 2021)."Green Line Extension Update"(PDF). Massachusetts Bay Transportation Authority. p. 19.
  76. ^Official Audit Report – Issued June 16, 2014: Massachusetts Bay Transportation Authority, For the period January 1, 2005 through December 31, 2012(PDF) (Report). Auditor of the Commonwealth. June 16, 2014.
  77. ^ab"Executive Summary"(PDF).Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. pp. 2–9. Archived fromthe original(PDF) on February 20, 2012.
  78. ^Ridership & Service Statistics (9 ed.). Massachusetts Bay Transportation Authority. 2004. p. 2.19 – via Internet Archive.
  79. ^"Planned Accessibility Projects – On Board the Green Line". Massachusetts Bay Transportation Authority. Archived fromthe original on August 10, 2004.
  80. ^"Green Line Stations Upgraded to Improve Accessibility"(PDF).TRANSReport. Boston Regional Metropolitan Planning Organization. June 2007. Archived fromthe original(PDF) on January 16, 2011.
  81. ^Bierman, Noah (June 2, 2009)."Arlington T station reopens with disabled access".Boston Globe. RetrievedMay 23, 2012.
  82. ^Rocheleau, Matt (September 14, 2010)."Copley station project nears end; historic church plans repairs".Boston Globe. RetrievedMay 23, 2012.
  83. ^Moskowitz, Eric (April 25, 2010)."Kenmore station upgrades done, finally".Boston Globe. p. B2 – via Newspapers.com.Open access icon
  84. ^"Trolley service to resume as project end".Boston Globe. November 3, 2011. Archived fromthe original on May 31, 2012. RetrievedMay 23, 2012.
  85. ^Moskowitz, Eric (March 21, 2016)."Government Center reopens".Boston Globe. RetrievedMarch 21, 2016.
  86. ^ab"Accessibility Initiatives—June 2024"(PDF). Massachusetts Bay Transportation Authority. June 25, 2024. pp. 2–5.
  87. ^abcde"Accessibility Initiatives—December 2024"(PDF). Massachusetts Bay Transportation Authority. December 6, 2024. pp. 3–6.
  88. ^"MPO Agency Notes"(PDF).TRANSreport. Boston Region Metropolitan Planning Organization. April 2006 – via Internet Archive.
  89. ^Rocheleau, Matt (September 28, 2012)."MBTA to hold meeting on $20m project to rebuild Boston College Station".Boston Globe.
  90. ^"Access in Motion: 2009 Calendar"(PDF). Massachusetts Bay Transportation Authority. 2009. Archived fromthe original(PDF) on January 2, 2010.
  91. ^"Brookline Hills Station Accessibility Improvements". Massachusetts Bay Transportation Authority. January 10, 2022.
  92. ^"New Babcock Street and Amory Street Stations Open November 15" (Press release). Massachusetts Bay Transportation Authority. November 12, 2021.
  93. ^"Green Line Transformation (GLT) Core Capacity Program: Overview and status of the Core Capacity Program"(PDF). Massachusetts Bay Transportation Authority. April 24, 2025.
  94. ^Collision Between Two Massachusetts Bay Transportation Authority Green Line Trains, Newton, Massachusetts, May 28, 2008 (NTSB/RAR-09-02)(PDF) (Report). National Transportation Safety Board. July 14, 2009. Archived fromthe original(PDF) on October 16, 2011.
  95. ^"Trolley Driver Was Texting Girlfriend At Time Of Crash: 46 Injured In Green Line Crash"Archived February 22, 2012, at theWayback Machine, WCVB, Boston, May 8, 2009.
  96. ^Texting Trolley Driver Is Transgendered Male, ABC News, May 11, 2009
  97. ^"Trolley Crash Inspires Tougher Cell Phone Policy: NTSB Still Investigating Crash"Archived February 22, 2012, at theWayback Machine, WCVB, May 9, 2009
  98. ^"MBTA: Human error caused Green Line collision, derailment".WCVB. October 8, 2012. RetrievedSeptember 17, 2024.
  99. ^Moskowitz, Erik; et al. (November 29, 2012)."35 taken to hospital after two trolleys collide at Boylston MBTA station".Boston Globe. RetrievedNovember 29, 2012.
  100. ^Tempera, Jacqueline; Martine Powers (March 10, 2014)."Seven injured as MBTA Green Line train derails near Kenmore Station".Boston.com. RetrievedMarch 11, 2014.{{cite news}}: CS1 maint: multiple names: authors list (link)
  101. ^"Green Line train derails; 'it was intense'".Boston Herald. March 10, 2014. Archived fromthe original on March 11, 2014. RetrievedMarch 10, 2014.
  102. ^Dungca, Nicole (October 13, 2016)."The Green Line had the most derailments in the nation last year".The Boston Globe. RetrievedOctober 13, 2016.
  103. ^Crimaldi, Laura (July 31, 2021)."NTSB investigating Green Line crash that left 25 injured; MBTA operator placed on leave".Boston Globe.
  104. ^Becker, Kaitlin McKinley (October 1, 2024)."Green Line train derails near Cambridge MBTA station; 7 people injured".NBC Boston. RetrievedOctober 2, 2024.
  105. ^"Shuttle Buses Continue to Replace Green Line Service between North Station and Union Square and Medford/Tufts".www.mbta.com. October 2, 2024. RetrievedOctober 2, 2024.
  106. ^"Green Line Service Has Resumed between North Station and Union Square and Medford/Tufts".www.mbta.com. October 3, 2024. RetrievedOctober 3, 2024.
  107. ^"Massachusetts Bay Transit Authority Derailment".National Transportation Safety Board. RetrievedOctober 17, 2024.
  108. ^Glaun, Dan (February 9, 2025)."Five taken to hospital after Somerville Green Line collision".The Boston Globe. RetrievedFebruary 9, 2025.
  109. ^Laura Crimaldi; Elizabeth Koh Globe (August 15, 2021)."On the T's Green Line, another serious crash and questions about the lack of safety technology".The Boston Globe.

External links

[edit]
Wikimedia Commons has media related toMBTA Green Line.
Template:Attached KML/Green Line (MBTA)
KML is from Wikidata
Subway
(List of stations)
Heavy rail
Light rail
Infrastructure
Former lines
 Commuter Rail
(List of stations)
North Station lines
South Station lines
Former lines
Bus
Other services
Planned projects
Predecessors
Other
Retired
Active
Future
Currently operatinglight rail andstreetcar systems in theUnited States
Arizona
Arkansas
California
Colorado
District of Columbia
Florida
Georgia
Illinois
Louisiana
Maryland
Massachusetts
Michigan
Minnesota
Missouri
New Jersey
New York
North Carolina
Ohio
Oklahoma
Oregon
Pennsylvania
Tennessee
Texas
Utah
Virginia
Washington
Wisconsin
Italics denote non-transit streetcar lines, operating only on limited dates and usually not year-round, for tourism or educational purposes.