This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Disneyland Monorail" – news ·newspapers ·books ·scholar ·JSTOR(January 2021) (Learn how and when to remove this message) |
Disneyland Monorail | |
---|---|
![]() Mark VII (Mk7) Monorail Red passes over theFinding Nemo Submarine Voyage show building in 2008 | |
Disneyland | |
Area | Tomorrowland andDowntown Disney |
Status | Operating |
Opening date | June 14, 1959 |
Ride statistics | |
Attraction type | Straddle beam monorail |
Designer | WED Enterprises |
Height | 41 ft (12 m) |
Speed | 30 mph (48 km/h) |
Vehicle type | Monorail Trains |
Vehicles | 3 |
Riders per vehicle | 120 |
Duration | 11 minutes |
Vehicle names | Monorail Red, Monorail Blue, Monorail Orange |
Track gauge | Single straddle-beam |
TheDisneyland Monorail (originally named theDisneyland Alweg Monorail System) is an attraction and transportation line at theDisneyland Resort inAnaheim, California, United States. It was the first daily operatingmonorail in the world.[1]
Disneyland Monorail System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Walt Disney originally envisioned the monorail as a practical form ofpublic transport for the future. However, the technology would never catch on in the United States. The monorail came about during a time when America's—and particularlyLos Angeles'—obsession with theautomobile was increasing, and monorails in the United States were mostly only located in Disney's theme parks.[2]
The job of building the monorail was originally assigned to the Standard Carriage Works of East Los Angeles, but in late 1958, Walt Disney, pressured for time, moved it to his Burbank studios. Disney designerBob Gurr then headed a Disney team that designed and manufactured the cars, chassis, suspension and propulsion systems. Gurr and Disney were assisted byAlweg, the German company that pioneeredstraddle beam monorails.
The Disneyland Alweg Monorail System opened on June 14, 1959,[3] just in time for the re-dedication ofTomorrowland and a broader expansion ofDisneyland which included theMatterhorn Bobsleds, theSubmarine Voyage, the expanded version ofAutopia, and theMotor Boat Cruise. The Mark I trains (Red and Blue) consisted of three cars each. The opening ceremony was attended by then-Vice PresidentRichard Nixon and his family.[4]
At opening, the monorail was merely an attraction, taking people on a scenic trip around Disneyland before returning to its only station. In 1961 it became a true transportation system when the track was extended 21⁄2 miles outside the park to a second station near theDisneyland Hotel. As part of this project, the Tomorrowland station was lengthened to accommodate four-car Mark II trains and a third Yellow train was added.
From Hotel Station there were two trips above Disneyland available aboard the monorail—a quick tour and general admission. Guests wishing to embark upon a vista-dome view of the park, including a leisurely layover in Tomorrowland within the tail-cone could purchase an exclusive round-trip tour ticket at Hotel Station and save the expense of general admission to Disneyland. Nose and tail-cone door latches were independent of the main door release button. A simple dial indicator above the tail-cone compartment door could be turned to one of three positions—General admission guests, round-trip only guests, and mixed. Hostess attendants at Tomorrowland Station would check the dial position and open the door for general admission guests. If general admission guests boarded the tail-cone in Tomorrowland, the dial would be set to mixed, then all mixed tail-cone guests disembarked at the hotel.
Both platforms were lengthened in 1968 for the new five-car Mark III trains, which added a fourth Green train.
By the early 1980s, the Mark III trains were showing their age and the wear of years. In 1985, Disneyland began phasing out the Mark III trains one by one. The older trains were stripped to the chassis and rebuilt as Mark V trains. The Mark III Green went first, to become the Mark V Purple followed by the Mark III Yellow becoming the Mark V Orange. The Mark III Blue remained blue (albeit a lighter shade) and the last was Red, remaining Red. The notable difference was the loss of the bubble-top driver's area in favor of a streamlined "Learjet" look similar to theMark IV trains at theWalt Disney World Resort. The new trains also sported closed passenger compartments (with windows that could be opened) and pneumatic doors. Following the1985 Disney World monorail fire, a safety handrail was added along the top of the train, as well as emergency fire exit hatches leading to the roof. The attraction's name remained the "Disneyland Monorail System", as it had been painted on the Mark III trains' skirts. The Mark V trains were built byRide & Show Engineering, Inc., incorporating bodies that were produced by Messerschmitt-Bolkow-Blohm of Germany (nowAirbus). Purple first made its appearance for testing in Autumn of 1986 and began regular operations a few months later. Orange was delivered in late Summer of 1987, followed by Blue in early 1988. The oldest train, Red, was also the last to be removed from the line for refurbishment in early 1988.
The beamway path was re-aligned into the Eeyore section of the parking lot in 1994 to accommodate the construction of theIndiana Jones Adventure show building. The trains were fitted with new electrical pick-up shoes and tail view cameras, enabling two-train point-to-point shuttle service where the first arriving train was disembarked, moved along empty to just beyond the station, the second train arrived, disembarked, embarked and dispatched so the first train could be loaded and dispatched for the return. In 1999, the monorail began lengthy periods of closures due to construction of theDisney California Adventure theme park where the monorail beamway passed through what had formerly been the parking lot. Although the beamway's route was not altered, a significant amount of construction was done around the existing beamway, and much of the terrain under the beamway's support columns were regraded, necessitating the closures. Additionally, the Disneyland Hotel Station and all of its nearby hotel structures were completely demolished and a new station built in the same location.[5] Downtown Disney Station is treated as a second gate intoDisneyland Park, so a general admission passport or valid annual pass must be presented to ride the monorail and the tail-cone tour is no longer offered.
The system resumed limited shuttle operations in 2000 when theDowntown Disney Station became operational, but a significant portion of the beamway was still unusable due to construction. In 2001 the monorail resumed full capacity forward direction circuit operations, passing throughDisney's Grand Californian Hotel & Spa, as well as showcasing the new park.
In 2004, Monorail Orange was removed from the line and taken toWalt Disney Imagineering inGlendale to bereverse engineered. Monorail Blue was removed in September 2006 for rebuilding. TheFinding Nemo Submarine Voyage show building was extended into the lagoon beneath the monorail, which closed from August 21 through late December 2006 to prepare for the 2007 opening of Nemo.
Like the Mark III to Mark V conversion, the refurbishment from Mark V to Mark VII was done one train at a time. The entire Mark VII Monorail fleet consists of three trains—Red, Blue, and Orange. The first Mark VII train, Monorail Red, arrived at Disneyland on December 20, 2007. It was originally expected to be in service by the end of February 2008, but due to design change issues, it did not begin serving park guests until July 3, 2008. Mark VII Blue arrived on-site on April 10, 2008, began daytime riderless testing on August 1, 2008, and began guest service on September 16, 2008. Monorail Mark VII Orange arrived on-site on August 14, 2008, began riderless testing in March 2009 and began guest service on April 7, 2009.
The Disneyland Monorail has two stations: one in Tomorrowland, and another in theDowntown Disney District. The original Monorail was a round trip ride with no stops. In 1961, the track was expanded to connect to a station at theDisneyland Hotel, making it an actual transportation system. The original Hotel station was torn down in 1999 and a new station, now called the Downtown Disney Station, was built in the same place.[5] All riders must disembark at Tomorrowland Station, and during peak traffic periods, the monorail offers only one-way trips where all passengers must also disembark at the Downtown Disney Station and re-board for the return trip to Tomorrowland. Admission toDisneyland Park must be purchased to ride the monorail.
In the fall of 2006, the Tomorrowland Station was remodeled due to theFinding Nemo Submarine Voyage construction. The original speed ramps were removed, and a new concrete ramp was added on the east end of the station to handle the queue and access to the station, with concrete stairs on the west end to handle the exiting Monorail passengers.
The monorail travels in one direction only. All passengers board at a single platform. Leaving Tomorrowland station, the monorail crosses theDisneyland Railroad and continues along Harbor Boulevard on the eastern edge of the park. Turning to enter Disney California Adventure, it passesMonsters, Inc. Mike & Sulley to the Rescue! and the Sunset Showcase Theater. The track then crosses through the gateway to theDisney California Adventure park. Passengers can see Disneyland Park on the right and Disney California Adventure on the left. The monorail then passes throughDisney's Grand Californian Hotel & Spa then makes a sharp curve to the right and enters the Downtown Disney station, which has a vegetative theme to match the floral motif throughout the shopping district.
Downtown Disney station has one platform. After a five-minute loading, the train leaves Downtown Disney and makes a short loop around the district before crossing above theesplanade between the two parks and heads back to Disneyland. Once inside the park, the monorail crosses the railroad again and goes into a series of sharp bends and curves around Tomorrowland. The track travels above the Submarine Lagoon andAutopia. The track crosses the lagoon four times. The track then curves around the Matterhorn Bobsleds, giving a view of Fantasyland, then turns left to reenter the Tomorrowland Station.
All monorails are equipped with Grover 1056 2-chime air horns. The horn must be sounded twice when departing a station, at one point where the track parallels the currently unused PeopleMover/Rocket Rod track, and when approaching the Matterhorn. They are also sounded when a bird lands on the track, and as a greeting to passing Disneyland Railroad trains near the switch to the barn. The original monorails were equipped with horns that sounded more like real ground-level trains.
"Monorail Shop", as it is officially known ("Shop" for short), is Disney's monorail maintenance facility located behind "it's a small world" andI-5 Freeway entrance toHarbor Blvd. at Disneyland and provides space for four monorails on its upper level (the bottom level houses the five steam locomotives that circle Disneyland). Monorails access this yard by stopping at the switch near the road crossing and then the switch will switch to the facility spur. Then the monorail travels slowly into the yard where another switch leads it into the designated track. No train will ever be left outside the facility because routine maintenance is performed nightly.
The diesel/hydraulic powered "work tractors" are primarily used each morning for beam inspection and maintenance-of-way which includes trimming vegetation beyond the reach of guests, cleaning and repairing the electricalcommutator rails as well as periodically scheduled servicing and painting of the concrete beam guideway. They are powerful enough to return a fully loaded train fitted with tow-bars to a station platform, then to the Monorail Shop, independent of 600 V track power.
In order to remove old monorail trains and replace them with new ones, they are shunted to maintenance shop beam "D" where each car segment is prepared individually for removal by supporting the remaining segment and disconnecting the bellows, cables, and articulated motor truck. The car is then rolled outside along the beam to a position where a custom crane-hoist harness is fitted to it and the car is hoisted off the beam and transferred to a truck trailer on which a transport beam is bolted. The Diesel/hydraulic tractor (pictured) is used as a switcher to carefully tow each car into and out of the maintenance shop. The procedure is reversed for fitting new segments of monorail train cars to the beam while testing each system and connection. Each fully assembled train is then slowly and methodically tested thoroughly over many months before it can be placed into revenue service for guests. It was determined after delivery of Mark VII Monorail Red that platform clearance was too tight for the new, elongated end-compartments, so Monorail Blue was modified at the manufacturer and entered service before Red[citation needed] .
Emergencies requiring train evacuation will be handled differently depending upon the location of the train and the nature of the emergency.
If a train is stopped at a station platform or the work platform, guests can exit the train onto the platform. Exiting a train is possible even when the doors of the train cars are closed. A cast member outside the car can also forcibly open the rightmost door panel of the car by releasing the air pressure holding that panel closed. The air pressure release is a handle beneath the rectangular center window that is similar in appearance to a car door handle.
If a train is stopped on an open beam, then guests evacuate through emergency exits located in the roof of the train. Guests open roof hatches by first removing decorative plastic from the ceiling above a bulkhead footstool and then by lifting open a hinged hatch that will flip across the bulkhead dividing two train cars. Guests evacuate to the roof by climbing through the open hatch onto the top of the train. The bulkheads separating cars are designed as firewalls that will contain a fire within a car to just that car. The open hatch allows guests in the affected car to transfer to an adjacent car where they can safely wait for evacuation by fire response crews.
If the emergency affects the entire train, then guests are evacuated to the surface of the beam. Guests again open the emergency roof hatches but do not simply move to the adjacent car. Instead, they use a small handrail present along the top of each train car to move to the front of the train. The Disneyland Fire Department assists in the safe evacuation of the disabled train.
Platform gates are operated manually and remain closed until the next train arrives and cast members determine that it is safe to board.
The trains are powered by 600 V DC electric current, drawn from a small rail (bus bar) running along the right side of the beam. This bus bar is similar to the electrified or "third" rail of a subway train.
33°48′46″N117°55′00″W / 33.8128°N 117.9167°W /33.8128; -117.9167