Location | |
---|---|
Territory | Northern Territory |
Country | Australia |
Coordinates | 12°42′47″S130°47′20″E / 12.713°S 130.789°E /-12.713; 130.789 |
Production | |
Products | Spodumene |
Production | 95,020 dmt Spodumene concentrate[1] |
Financial year | 2024 |
History | |
Opened | 2022 |
Owner | |
Company | Core Lithium |
Website | Finniss Lithium Operation |
TheFinnis Lithium mine is alithium mine situated nearDarwin in theNorthern Territory,Australia. It is being developed byCore Lithium.
Theore body was discovered in 2016, and feasibility work was done in 2018–2020 with a firm investment decision made in September 2021. Commercial production began in February 2023 with an 8-year lifespan.[2]
The mine comprises 500 km2 (190 sq mi) ofleases, covering the Bynoepegmatite field (BPF) and several pegmatites near Darwin.[2] Specifically, it encompasses the five ore deposits "Grants, Carlton, Sandras, Hang Gong SW, and BP33."[2] The:[3]
ore bodies of the Finniss lithium project are characterised aslithium-cesium-tantalum (LCT) pegmatite deposits that are hosted within the Burrell Creek metasedimentary rock formation. The pegmatites at the deposits comprise lithium-bearingspodumene,quartz,albite,microcline as well asmica
with a consistent lithium content across the ore body.[3]
Core Lithium is developing the mine,[4] having completed a pre-feasibility study (PFS) in June 2018 and a definitive feasibility study (DFS) in April 2019. Revisions to the feasibility study were completed in 2020 to incorporate underground mining methods in the mining plan. A revised DFS was completed in July 2021 outlining a project that will occur in multiple stages. The first stage will involve open-pit mining near Grants and Hang Gong, as well as underground mining at the Grants, BP33, and Carltonprospects.[2] The AustralianJORC 2012 compliance process estimated 3.45 million tonnes (Mt) of mineral resource at 1.4 percentlithium oxide.[4] Major Project Status (MPS) was granted by theAustralian government in March 2021, recognizing the strategic significance of the project.[5]
Battery-gradelithium hydroxide was produced as part of the test works onspodumene mineral concentrate sample from the mine in April 2021.[2] Construction began in 2021 and full operational mining commenced in October 2022,[6] with the first shipment of spodumene concentrate being exported fromPort Darwin in May 2023.[2]
Development of the mine is an $89 million project. Over the 12-year lifespan of the project 16 million tonnes (35 billion pounds) of ore are expected to be mined. Most lithium concentrate is expected to be exported overseas.[6]
In 2022,Tesla contracted for 110 thousand tonnes (240 million pounds) of spodumene concentrate over four years from the Core Lithium and its Finniss lithium mine.[7][6]