Commuter rail system in Chongqing, China
Chongqing Suburban Railway is acommuter rail transit system in construction inChongqing ,China . According to theComprehensive Transport Plan of Chongqing Main City Zone , the system will have a total of 14 lines.
This section needs to beupdated . Please help update this article to reflect recent events or newly available information. (September 2024 )
Opening Project Terminus Top speed Type Length(km) New stations Start of construction Status Notes 2022 Jiangtiao [ Note 1] Phase I Tiaodeng Shengquansi 120 km/h (75 mph) Double-track 26.7 7 2014 Operational [ 1] TBA Yuhe Yuhe line Moxinpo Weituo 160 km/h (99 mph) Double-track 49.5 5 TBA On hold TBA Heyong Heyong line Huangniba Yongchuannan 160 km/h (99 mph) Single-track 95.0 8 TBA In planning 2025 Bitong Bitong line Bishan Tongliangxi 140 km/h (87 mph) Double-track 37.5[ 2] 9[ 2] 2019 Operational [ 2] 2025 Jiangtiao [ Note 1] Phase II Shengquansi Dingshan 120 km/h (75 mph) Double-track 4.61 2 2022 In full construction [ 1]