Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Chengdu Metro

From Wikipedia, the free encyclopedia
Rapid transit system of Chengdu, Sichuan, China

Chengdu Metro
Overview
OwnerCity of Chengdu
LocaleChengdu,Sichuan, China
Transit typeRapid transit
Number of lines15 (1 tram line excluded)[1]
Number of stations423[1](36 tram stations included)
Daily ridership5.967 million (Jan.-Jun. 2024)[2]
8.0821 million (Peak)[3]
Annual ridership2.11 billion (2023)[4]
Websitechengdurail.com
Operation
Began operation27 September 2010; 14 years ago (2010-09-27)
(10 September 2010; 14 years ago (2010-09-10) Public Trial)
Operator(s)Chengdu Rail Transit Group
Technical
System length633.6 km (393.7 mi) (excludingChengdu Tram)
672.9 km (418.1 mi)[1] (includingChengdu Tram)
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
ElectrificationOverhead line1,500 V DC[a] and25 kV 50 Hz AC[b]
System map

TheChengdu Metro is therapid transit system ofChengdu, the capital ofSichuan, China. With the opening of Line 1 on 27 September 2010, the system has fifteen subway lines and one light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the3rd longest metro system in the world.

There are currently (December 2024) 15 operating subway lines totaling 633.6 km (393.7 mi) of track, and 1 tram line (Line T2). The Chengdu Metro serves about 6 million trips per day.[5] As of 2021, about 2.2 million and 4.6 million people live within 500 and 800 metres (1,640 and 2,625 ft) of a subway station in Chengdu, respectively.[6]

Operating network

[edit]

There are 15 subway lines operating currently, covering 633.6 km (393.7 mi) with 387 stations and a light rail line with 36 stop (Line T2) operating, covering 39.3 km (24.4 mi).

Chengdu Metro Network
LineTerminals
(District/County)
CommencementNewest
Extension
Length
km
Stations
1Weijianian
(Jinniu)
Science City
(Shuangliu)
2010201840.9935
Wugensong
(Shuangliu)
2Xipu
(Pidu)
Longquanyi
(Longquanyi)
2012201442.3232
3Chengdu Medical College
(Xindu)
Shuangliu West Station
(Shuangliu)
2016201849.8937
4Wansheng
(Wenjiang)
Xihe
(Longquanyi)
2015201743.2830
5Huagui Road
(Xindu)
Huilong
(Shuangliu)
201949.02[7]41
6Wangcong Temple
(Pidu)
Lanjiagou
(Shuangliu)
202068.8855
7
loop line
Cuijiadian
(Chenghua)
Cuijiadian
(Chenghua)
201738.6131
8Guilong Road
(Chenghua)
Longgang
(Shuangliu)
2020202436.7132
9Financial City East
(Jinjiang)
Huangtianba
(Qingyang)
202022.1813
10Taipingyuan
(Wuhou)
Xinping (Baodun)
(Xinjin)
2017201937.97216
17Jiujiang North
(Shuangliu)
Jitouqiao
(Wuhou)
202020236.713
18South Railway Station
(Wuhou)
Tianfu Airport North
(Jianyang)
202069.39[8]12
19Jinxing
(Wenjiang)
Tianfu Station /Tianfu Airport North
(Tianfu New Area) / (Jianyang)
2020202360.13918
27Shifo
(Xindu)
Shuxin Road
(Qingyang)
202424.8622
S3Futian
(Jianyang)
Ziyang Bei Station
(Yanjiang,Ziyang)
202438.76
Total633387

Line 1

[edit]
Jinjiang Hotel station of Line 1
Main article:Line 1 (Chengdu Metro)

The first phase of Line 1 cost 7 billionyuan to construct.[9] A natural ventilation system has been used in the underground section of Line 1 on the subway system from Southern Third Ring Road to Jincheng Plaza Station. Square ventilation units are built every 30 m (98 ft 5 in) along the subway top to allow fresh air from the ground enter the construction site underground. The method is used in subway construction in other countries as it cuts the construction cost and it saves energy. The subway system is the first in China to adopt such a ventilation system during construction. Chengdu Metro is planning to set up a section for subway fire control and introduce the latest fire fighting technologies and vehicles. Line 1's color isdark blue.[10]

Line 2

[edit]
People's Park station of Line 2
Main article:Line 2 (Chengdu Metro)

Line 2 is a crosstown northwest–southeast trunk route. This line serves theChengdu East railway station. Line 2 began operation on 16 September 2012. An 11 km (6.8 mi) long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014. It total it is currently 42.32 km (26.30 mi) long. Line 2's color isorange.[11]

Line 3

[edit]
Xinnanmen station of Line 3
Main article:Line 3 (Chengdu Metro)

Line 3 runs in a northeast–southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is 49.85 km (30.98 mi). Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016. It was Chengdu's final line to use the lower capacity type B trains, subsequent lines favoring the longer and wider Type A cars. Line 3's color ismagenta.

Line 4

[edit]
Taisheng Road South station of Line 4
Main article:Line 4 (Chengdu Metro)

Line 4 is the third line to enter revenue service on the metro network in Chengdu, Sichuan. Line 4 runs in an east–west direction, stretching from Wansheng in Wenjiang to Xihe in the Longquanyi. The first phase started construction on 22 July 2011, and began operation on 26 December 2015. Testing began on the east of west extensions of Line 4 as part of Phase II expansion on 10 December 2016. Line 4's color isgreen.

Line 5

[edit]
Fuqin station of Line 5
Main article:Line 5 (Chengdu Metro)

Line 5 is a crosstown north–south trunk line. Despite being numbered such, it was the seventh line to open, having started operation on 27 December 2019. Line 5's color ispurple.

Line 6

[edit]
Xipu station of Line 6
Main article:Line 6 (Chengdu Metro)

Line 6 is a crosstown northwest–south-west pivotal line. It is the second longest metro line in Chengdu and the longest non-branching line in China at 68.88 km (42.80 mi) (withChengdu Line 18 being in first place for both). It has more stations than any other metro line in China, with 54 currently plus two more infill stations coming later. It is one of the four lines to have started operation on 18 December 2020. Line 6's color isbrown.

Line 7

[edit]
Shizishan station of Line 7
Main article:Line 7 (Chengdu Metro)

Line 7 is a 38.61 km (23.99 mi) loop line which runs around downtown Chengdu. Despite the number, it was actually the sixth line to open, having started operation on 6 December 2017. Line 7's color issky blue.

Line 8

[edit]
Dongjiao Memory station of Line 8
Main article:Line 8 (Chengdu Metro)

Line 8 is a 29.1 km (18.1 mi) crosstown northeast–southwest metro line. It connects the Wangjiang and Jiang'an campuses of Sichuan University. Phase 1 began operation on 18 December 2020, the same day as lines 6, 9, and 18. Phase 2 opened on 19 December 2024. Line 8's color ischartreuse.



Line 9

[edit]
Huaxing station of Line 9
Main article:Line 9 (Chengdu Metro)

Line 9 will be the system's second circle line when it is completed. It is the first driverless metro line in Mid/West China. Phase 1 started operation on 18 December 2020. Line 9's color isbright orange.

Line 10

[edit]
Terminal 1 of Shuangliu International Airport station of Line 10
Main article:Line 10 (Chengdu Metro)

Line 10 is a 39.972 km (24.837 mi) line servingChengdu Shuangliu International Airport. It started operation on 6 September 2017. It was also the first line to use the higher-capacity type A trains. Line 10's color isblue.

Line 17

[edit]
Fengxihe station of Line 17 previously (now Line 19)
Main article:Line 17 (Chengdu Metro)

Line 17 is a 6.71 km (4.17 mi) metro line at west side of Chengdu. Phase 1, including phase 1 of line 19, started operation on 18 December 2020. On 22 September 2023, theJinxing-Jiujiang North section was integrated intoLine 19. Like line 18 is uses a special variant of Type A trains with one less door per side and using25 kV AC overhead power, as opposed to the "standard" 1500 V DC most newer metros in China use. Line 17's color ispale green.

Line 18

[edit]
Main article:Line 18 (Chengdu Metro)
Century City station of Line 18

Line 18 is the first express subway line in the city. It parallels the southern section of Line 1 servingTianfu New Area. It started operation on 27 September 2020. Phase 2 started operation on 18 December 2020. At 69.39 km (43.12 mi), it is the third longest metro line in China afterChongqing Line 6 being the longest andShanghai Line 11 in second place. It is still however the longest line that does not have any branches. Like line 17, it uses a special variant of Type A trains with one less door per side and using25 kV AC overhead power. Line 18's color isteal.

Line 19

[edit]
Main article:Line 19 (Chengdu Metro)

Line 19 is an express subway line linking Shuangliu International Airport and Tianfu International Airport. It partly shares the track with Line 18 between Tianfu Station and Tianfu Airport North. It started operation on 22 September 2023. Line 19's color islight purple.

Line 27

[edit]
Main article:Line 27 (Chengdu Metro)

Line 27 is a 27.86 km (17.31 mi) metro line connecting several northern regions of the city. It's the city's second metro line that use driverless trains. Line 27's color islight blue.

Line S3

[edit]
Main article:Line S3 (Chengdu Metro)

Line S3 is an express subway line linking Futian in Jianyang, Chengdu to Ziyang North Railway Station along theChengdu-Chongqing Intercity Railway inZiyang. It is Chengdu’s first intercity rapid transit line. It started operation on 29 September 2024. Line S3's color isgrey.

Tram Line 2

[edit]
Hexin Road station of Tram Line 2
Main article:Line 2 (Chengdu Tram)

Chengdu Tram Line 2 has 39.3 km (24.4 mi) of operating tracks and 35 stations (47 when fully completed). The line uses low-floor trams derived from theAlstom Citadis. Tram Line 2's color islight green.

History

[edit]
Evolution of the Chengdu Metro

Inception

[edit]

In 1985, the Chengdu Planning Bureau set up an integrated transportation planning office which began the process of the planning for arapid transit network for Chengdu.[12] By 1992, a proposal for the subway was sent to the National Planning Commission[13] and was subsequently rejected.[12] In 2004 before the approval of theNational Development and Reform Commission Chengdu started reconstructingTianfu Square with provisions forTianfu Square station.[14] The first phase of Chengdu Metro, consisting of Lines 1 and 2, were approved by the NDRC on 11 September 2005.[15]

First phase projects

[edit]

2005

[edit]
  • Line 1 construction commenced on 28 December 2005.[16]

2007

[edit]
  • Construction ofLine 2 began on 29 December 2007.[17]

2009

[edit]
  • In May 2009, the National Development and Reform Commission (NDRC) approved western and eastern extensions of Line 2, along with the first phase of Lines3 and4.[18]

2010

[edit]
  • Line 1 opened on 27 September 2010.[19][20]

2011

[edit]
  • Construction of the first phase of Line 4 started on 22 July 2011.[21]

2012

[edit]
  • On 25 April 2012, Line 3 received approval from the NDRC.[22]
  • On 16 January 2012, the NDRC officially approved the southern extension of Line 1.[23]
  • Line 3 construction began on 28 April 2012.[24]

2013

[edit]
  • On 8 June 2013, Line 2 West Extension to Xipu and Ocean Park Station on Line 1 opened; Ocean Park was later renamed Jincheng Plaza.

2014

[edit]
  • On 26 October 2014, Line 2 East Extension to Longquanyi opened.

2015

[edit]
  • On 25 July 2015, Line 1 South Extension opened.[25]
  • On 10 December 2015, Line 4 Phase 1 opened.

2016

[edit]
  • On 31 July 2016, Line 3 Phase 1 was opened, marking the completion of the first phase.

Second phase projects

[edit]

2009

[edit]
  • In May 2009, the National Development and Reform Commission (NDRC) approved the second phase of expansion for the Chengdu Metro, encompassing Line 1 Phase 3, Line 3 Phase 2 and 3, Line 4 Phase 2, Line 5 Phase 1 and 2, Line 6 Phase 1, Line 7, Line 10 Phase 1, and Line 18. The total length of Phase 2 amounted to 183.3 km (113.9 mi) of new subway infrastructure.[26]

2014

[edit]
  • On 4 June 2014, construction commenced for Line 10 Phase 1.[27]

2015

[edit]
  • In August 2015, construction began for Line 5 Phase 1.[28]

2017

[edit]
  • On 28 February 2017, the first tunnel boring machine for Line 18 was launched.[29]
  • On 2 June 2017, Line 4 Phase 2 was opened.[30]
  • On 6 September 2017, Line 10 Phase 1 was opened.[31]
  • On 6 December 2017, Line 7 was opened.[32]

2018

[edit]
  • On 18 March 2018, Line 1 Phase 3 was opened.[33]
  • On 26 December 2018, Line 3 Phase 2 and 3 were opened.[34]

2019

[edit]
  • In November 2019, Chengdu Metro introduced new signage branding coinciding with the opening of Line 5.[35]
  • On 27 December 2019, Line 5 and Line 10 Phase 2 were opened.[36]

2020

[edit]
  • On 27 May 2020,Line 6 began testing.[37]
  • On 2 June 2020, Line 18, the largest Public-Private Partnership (PPP) project in China, commenced its 3-month trial operation.[38]
  • On 6 August 2020, Line 18 completed its fire-prevention assessment.[39]
  • On 27 September 2020, Line 18 Phase 1 was opened.
  • On 18 December 2020, Line 6 Phases 1 to 3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, and Line 18 Phase 2 were opened, marking the completion of Phase 2 and 3 projects. With these openings, Chengdu Metro updated the wayfinding in all stations, introducing alpha-numeric station identifiers, and installed new LCD passenger information systems.[40]
  • In 2020, with the opening of Line 6, Line 18 and other lines, Chengdu Metro refreshed the wayfinding in all stations with alpha-numeric station identifiers.[41] In addition, new LCD passenger information systems, such as "comprehensive information screen" LCD, in station concourses and on screen doors at some stations.[42]

2022

[edit]
  • On 16 February 2022, in response to noise issues onLine 5, operational speed limits were imposed on theXingfuqiao toBeibu Shopping Mall toLiaojiawan sections, with an average speed of 60 km/h, to minimize noise impact on the environment and neighboring areas.[43]

Third phase projects

[edit]

2016

[edit]
  • On 11 July 2016, the National Development and Reform Commission (NDRC) approved the third phase of Chengdu Metro's expansion plan. This phase included Line 6 Phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18.[44] Simultaneously with the second phase, the construction of the third phase commenced.
  • On 16 August 2016, Line 18's construction officially started.[45]
  • On 31 December 2016, construction began for Lines 8, Line 9, and Line 10 Phase 2.[46]

2017

[edit]
  • On 27 February 2017, Line 17 Phase 1 construction was initiated.[47]

2019

[edit]
  • On 19 February 2019, Chengdu received its first-ever subway train capable ofGoA4 ATO for Line 9.[48]
  • On 30 July 2019, thetunnel boring machine completed tunneling for Line 9 between Chengdu West Railway and Huangtianba Stations.[49]
  • On 5 August 2019, all stations on Line 17 Phase 1 completed the construction of main structures and roofing.[50]

2020

[edit]
  • On 14 January 2020, the last section of track was laid for all of Line 9 Phase 1, between Sanyuan Station to Jincheng Avenue Station.[51]
  • On 11 April 2020, Chengdu Metro reported the completion of track-laying for Line 8.[52]
  • On 19 June 2020, both Line 9 and Line 17 started their 3-month trial operations.[53]
  • On 24 June 2020, the construction of Wutongmiao Temple Depot for Line 17 was completed.[54]
  • On 8 July 2020, Line 6 Phase 1 and 2 were officially powered on.[55]
  • On 17 July 2020, the construction officially started for the 4 stations on Line 30 inLongquanyi District.[56]
  • On 8 August 2020, Line 8's whole line power network passed quality assessment.[57]
  • On 18 December 2020, Line 6 Phase 1/2/3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, and Line 18 Phase 2 were opened, marking the completion of Phase 2 and 3 projects. This milestone also positioned the Chengdu Metro as the fourth largest subway system globally with over 500 km of operating subway routes after 15 years of rapid growth.

Fourth phase projects

[edit]

2019

[edit]
  • On 17 June 2019, the NDRC approved the fourth phase expansion for the Chengdu Metro. It includes Line 8 Phase 2, Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[58] The Fourth Phase encompasses 176.65 km of new lines.[59]

2020

[edit]
  • On 18 March 2020, construction commenced on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, andLine 30 Phase 1.[60]
  • On 11 April 2020, construction began on Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, and Line 19 Phase 2.[52]
  • On 18 May 2020, Line 8 Phase 2, Line 27 Phase 1, and Line 30 Phase 1 started construction, marking the commencement of all Fourth Phase projects.[61]
  • On 17 July 2020, construction officially began for the last 4 stations on Line 30 inLongquanyi District.[56]
  • On 27 November 2020, construction officially started forLine S3, a connection line between Chengdu and Ziyang.[62]

2021

[edit]
  • On 2 April 2021, Chengdu Metro reached a ridership of 7 million per day for the first time.[63]

2022

[edit]
  • On 16 December 2022,Line 13 Phase 1 completed the tunnel construction from Sanguantang to Jiuyanqiao Section, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.[64]
  • On 22 December 2022, Line 30 Phase 1 completed the structure construction of Jiaozi Flyover.[65]
  • In December 2022, Line 30 Phase 1 completed the water/cable/pipe reroute for Financial City North station, marking the station's main structure construction entering the next stage.[64]
  • In December 2022, Chengdu Metro's deepest and first 4-line transfer station, Luomashi, finished digging. Line 18 Phase 1's platform is 45.5 meters deep, with Chengdu North to Luomashi's deepest tunnel at 48.8 meters, equivalent to 16 floors underground. Luomashi serves Line 1, Line 4, Line 10, and Line 18.[64]

2023

[edit]
  • On 13 January 2023, all 15 stations of Line 13 Phase 1 finished structural construction. The line's tunnel is 62% complete, and the railroad is 10% complete.[66]
  • On 12 February 2023, Line 19 Phase 2 was officially powered on.[67]
  • On 17 February 2023, Line 30 Phase 1 from Terminal 2 of Shuangliu International Airport East to Sisheng section's left tunnel was finished, marking the completion of the 18th tunnel.[68]
  • On 21 February 2023, Line 19 Phase 2's signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[68]
  • On 22 February 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.[68]
  • On 20 March 2023, Line 19's Changshun Villige Depot (长顺村停车场) was handed over to the operation.[67]
  • On 21 March 2023, Line 27 finished all station construction.[69]
  • On 26 March 2023, Line 18 increased express service from 6 to 16 trains to meet the increasing needs for Chengdu Tianfu International Airport and daily commuters. Line 18 also increased 58 trains daily, with 36 trains for Airport Express Service.[70][71]
  • On 27 March 2023, Line 8 Phase 2 finished tunnel work for the Longgang to Lianhua section. Line 8 Phase 2 entered the railroad construction, electrics, and refurbishment stage.[72]
  • On 28 March 2023, Line 19 Phase 2 finished the 160 km/h high-speed train testing, entering 1–2 months of systematic testing.[73]
  • On 28 March 2023, the Chengdu Rail Transit 2023 Annual Media Gala was held in Wenjiashan Station on Line 19.[74]
  • On 29 March 2023, construction for the left tunnel between Baotai Avenue and Changhong Square on Line S3 finished.[75][76]
  • On 30 March 2023, the tunnel boring machine used for the Jiuyanqiao-Xinnanmen section of Line 13 makes a breakthrough.[77]
  • On 30 March 2023, Line 19 Phase 2 finished construction and is handed over to the operation team for operational testing.[78]
  • On 30 March 2023, Chengdu Metro and Shanghai Metro's QR Code ticketing systems were officially unified and connected.[79]
  • On 31 March 2023,Line 30 Phase 1's Gaobeiba Depot (高碑坝车辆段) was powered on.[80]
  • From January to March 2023, Chengdu Metro TOD initiated four new land projects covering 200,000 square meters, along with 23 TOD projects and 38 new construction project sections.[67]
  • On 26 May 2023, all 45 trains ofLine 19 Phase 2 were delivered.[81]
  • On 31 May 2023,Line S3 (Ziyang Line) began mechanical and electrical work after completing line construction.[82]
  • On 11 September 2023,Line 30 Phase 1's longest station -Terminal 2 of Shuangliu International Airport East - finished structure construction, marking the 23rd station to complete structure contraction.[83]
  • On 17 September 2023, the original Line 17 Phase 1 (Jinxing -Jitouqiao) split into Line 19 Phase 1 (Jinxing -Jiujiang North) and new Line 17 (Jiujiang North -Jitouqiao). A 4-Car A-Train started operating on Line 17, and all passengers were required to transfer at the same platform atJiujiang North between lines 17 and 19.[84][85]
  • On 20 September 2023,Line 13's first train was finished. This marked Chengdu's second metro line to use driverless automatic trains.[86]
  • On 22 September 2023,Line 30 Phase 1 finished tunnel construction.[87]
  • On 26 September 2023,Line 18 andLine 19 began co-operational testing.[88]
  • On 30 September 2023,Line 17 Phase 2'sPeople's Park Station finished structure construction.[89]
  • On 3 October 2023,Line 17 Phase 2's Qingshuihedaqiao-Huanhuali stations completed both tunnel construction.[90]
  • On 28 November 2023,Line 19 Phase 2 opens, extending the line fromJiujiang North toTianfu Station.[91]

2024

[edit]


Fifth phase projects

[edit]

2023

[edit]
  • On 13 January 2023, the Chengdu Government published the fifth phase expansion and the environmental assessment for Chengdu Metro. The Fifth Phase plan consists of 199.8 km (124.1 mi) of 10 new lines, includingLine 5 Phase 3,Line 9 Phase 2,Line 10 Phase 4,Line 12 Phase 1,Line 16 Phase 1,Line 18 Phase 4,Line 20 Phase 1,Line 22 Phase 1,Line 23 Phase 1, andLine 27 Phase 2.[95]
  • On 15 February 2023,Line S11 was approved by theSichuan Development and Reform Commission.[68]
  • On 30 March 2023,Line S11 (Chengdu - Deyang Line) started construction. This line is planned to open in 2026, consisting of a 70.84 km route with a 45.30 km elevated section, a 23.91 km underground section, and a 1.63 km transit section.[96]
  • On 31 March 2023, Chengdu Metro reached 1 billion ridership, as a rider entered the gate at 15:29:16.[97]
  • On 6 September 2023,Line S11 started construction at Banzhuyuan Station in Xindu.[98]
  • On 6 September 2023, Chengdu Metro debuted Train Maintenance Bots (车辆巡检机器人), AI-Railway Maintenance Bots (轨道智能巡检机器人), and Power-line Surveillance AI (弓网在线监测装置) onLine 19. This marks the world's first AI-Maintenance Robot & System. Chengdu Metro aims to implement full AI-Operation by 2025.[99]

Network expansion

[edit]

Lines under construction

[edit]
Map of Chengdu Metro plan (2025)

Chengdu had built about 291 km (181 mi) of subway lines in 2020.[100] In 2017, the construction of the first phases of Lines 8, 9, 11, 17 and Line 10 (Phase 2) started, the length of subway under construction in Chengdu totaling 400 km (249 mi).[101] It is expected by the end of 2020, Lines 6, 8, 9, 17 and 18 will open. Extending the Chengdu Metro network to 518.5 km (322.2 mi) of route (excludingChengdu Tram).[102]

Est. OpeningLinePhaseTerminalsLength (km)StationsNotes
202510Phase 3TaipingyuanLuomashi6.446
13Phase 1WayaotanLong’an29.0721
17Phase 2JitouqiaoGaohong24.818
18Phase 3 North SectionNorth Railway StationSouth Railway Station10.994[103][104]
Phase 3 Guanyan SectionTianfu International Airport NorthGuanyan2.571
30Phase 1Terminal 2 of Shuangliu International AirportLongquan27.7424[105]
2026S5HonglianMeishan East Railway Station59.31513
2027S11Phase 1Deyang Railway StationWeijianian70.84516

Phase 5

[edit]

The Chengdu Metro Phase 5 construction plan (2024-2029) was announced in 2023.[106]

LinePhaseTerminalsLength (km)Stations
5Phase 3HuilongYongan6.54
9Phase 2Financial City EastHuangtianba45.026
10Phase 4People's ParkBailianchi10.18
12Phase 1DeyuanYujialaofangzi38.7532
 16 Phase 1HuaxibaShaba'er37.522
18Phase 4North Railway StationFengtai 3rd Road7.13
GuanyanJianyang South Station
 20 Phase 1YinglongBaihelin18.313
 22 Phase 1LinjiangcunYinglong9.710
 23 Phase 1Tianfu 1st RoadPanda Paradise24.818
27Phase 2Shuxin RoadHuangtianba2.083

Long-term planning

[edit]

In December 2020, Chengdu Municipal Bureau of Planning and Natural Resources announced the long-term planning including Lines 1-33, D1-D6 and S1-S19.[107]

Fares

[edit]

Single ride card

[edit]

Single Ride Card is an IC card for one trip. Riders can buy it through attendants in station's Service Centers or useticket-vending machines. One ticket allows only one rider in with validity of the same day. If riders have not used the Single Ride Card, they may refund it at the same day at the same station.[108]

From its opening until 1 June 2017, Chengdu Metro used a fare system based on station counts.[109] With a 2-hour grace period in the subway system.[110] In October 2016, Chengdu Metro held public meeting for price changing issues and set new pricing plans.[111]

From 2 June 2017, Chengdu Metro starts new fare system based on distance.[112]

Distance (km)Distance to next price level (km)Total Price (CNY)
0~44¥2
4~84¥3
8~124¥4
12~186¥5
18~246¥6
24~328¥7
32~408¥8
40~5010¥9
When the trip is longer than 50 km, each additional 20 km requires another ¥1
Each rider has a 3-hour grace period in the system.

Reloadable IC cards

[edit]

The Tianfutong Pass is a reloadable IC Card accepted by the Chengdu Metro.[113] Normal Tianfutong Passes provide 10% discounts. Student Tianfutong Passes provide 50% discounts. Senior Tianfutong Passes have special discounts depending on time of use.[114][113] Additionally, passengers can pay for single rides directly using Debit IC cards offered by participating banks.[115][116]

Train types and technology

[edit]
The interior of a Line 7 train showing local ancientSanxingdui/Jinsha culture.

All "standard" Chengdu Metro lines in operation run on 1,500 V DC supplied byoverhead lines.[117][118][119] Express lines meanwhile run on25 kV AC to get to top speed quicker. Trains on Lines 3, 4, 7, 10 and some of the newer Line 2 trains have aGolden Sun Bird insignia. New trains are equipped with LCD passenger information systems.

Line 6 Train LCD Passenger Information System

Signalling system

[edit]

All Chengdu Metro lines are equipped withCBTC.[120] Chengdu Metro Line 1, which opened to traffic in 2010, used a CBTC signaling system provided by Zhejiang Zhonghe Technology, a subsidiary ofZhejiang University,[121] in collaboration withAnsaldo STS.[122] This system is also used on Chengdu Metro Line 6[123] and 10.[124] Chengdu Metro Line 3, which opened in 2016, was one of the first adoptions of a domestic CBTC signal system implementation by Beijing Traffic Control Technology.[125] Beijing Traffic Control Technology's CBTC system is also used in Line 5.[126]Alstom's Urbalis 888 CBTC signal system in collaboration with CASCO is used on Line 18, 19, Chengdu Light Rail Line 2 and the fully automated GoA4 Line 9.[127]

Type A trains

[edit]

In response to congestion and high ridership, Lines 7, 8 and 10 are equipped with higher capacity 6-car aluminum alloy Type A trains. The total length of 140 metres (459 ft 4 in) and width is 3 metres (9 ft 10 in). All trains have a maximum operating speed of 80 km/h (50 mph). The capacity of a 6-car train is 1,828 passengers with acrush load capacity of 2,488 passengers. Line 7 trains are designed and managed by CRRC Qingdao Sifang with CRRC Chengdu performing manufacturing and assembly.[128] Lines 5, 6 and 9 are equipped with even higher capacity eight car aluminum alloy Type A trains. The capacity of an eight car trainset is 2,480 passengers with acrush load capacity of 3,456 passengers.[129]

Type B trains

[edit]

Lines 1, 2, 3 and 4 use six car stainless steel Type B trains with a total length of 120 metres (393 ft 8 in) and width 2.8 metres (9 ft 2 in). The capacity of each train set is 1,460 people with acrush load capacity of 1,880 passengers.[130] All trains have a maximum operating speed of 80 km/h (50 mph). Lines 1 and 2 useCRRCQingdao Sifang andCRRC Chengdu trains.[131] Trains on Line 3 and 4 are manufactured byCRRC Changchun Railway Vehicles andCRRC Chengdu.[132] In 2008, Chengdu Metro in anticipation of the opening of Line 1, purchased and initial order of 17 six car trains sets fromCRRCQingdao Sifang.[133] In April 2011, a further order was announced for trains from CRRC for Line 2, taking the total to 59 six car sets.[134]

Light rail trains

[edit]

Currently, only Chengdu Light Rail Line 2 is in operation. Light Rail Line 2 uses low floor light rail trains provided by domestic manufacturerCRRC. The tram system uses light rail trains, of each having 5 cars and 8 doors.Chengdu Light Rail Line R2 opened to public on 26 December 2018 and extended on 27 December 2019. It is 39.3 km (24.4 mi) long, with 35 stations (47 station when completed). In early 2020, this line is included in the latest Chengdu Metro's official system map.[135][136][137]

Other rail transit

[edit]

High-speed intercity rail

[edit]

There are also two high-speed intercity railways in Chengdu, not part of Chengdu Metro system: theChengdu–Dujiangyan intercity railway andChengdu–Pujiang intercity railway. They are operated by Chengdu Metropolitan Railway Company Limited, which is China's first joint venture between a local government andChina's national rail operator. The city and theMinistry of Railways worked together in building high-speed intercity rail lines.[138]

Network map

[edit]

Map

See also

[edit]

Notes

[edit]
  1. ^Lines 1–10, 27, 30
  2. ^Lines 13, 17, 18, 19

References

[edit]
  1. ^abc成都地铁 (19 December 2024)."8号线二期、27号线一期正式开通,成都都市圈轨道交通线网里程超670公里!".
  2. ^"1—6月成都地铁客运量10.86亿人次同比增长8.1%".成都市国资委. Retrieved19 December 2024.
  3. ^"首次破800万!成都地铁单日客运量再创新高!".成都地铁. Retrieved19 December 2024.
  4. ^"剑指3万亿!这个超大城市,凭什么?".新浪财经. 8 March 2024. Retrieved19 December 2024.
  5. ^"1—6月成都地铁客运量10.86亿人次同比增长8.1%".成都市国资委. Retrieved19 December 2024.
  6. ^袁弘 (23 August 2021).成都轨道交通成网效果评估出炉 市民平均通勤时长减少.成都市住房和城乡建设局 (in Chinese). Retrieved16 March 2022.
  7. ^"成都地铁5号线、10号线竣工验收!创下国内多个"首次"". 28 November 2019.
  8. ^"成都"东进"首条主动脉 18号线一二期首开段竣工验收".
  9. ^Huang Zhiling and Bao Xinyan,Work begins on new metro schemes,China Daily, 2005-12-29
  10. ^Chengdu Municipal Government,Subway to Adopt Natural VentilationArchived 30 September 2007 at theWayback Machine, Retrieved on 2007-03-13
  11. ^成都地铁2号线今日正式开通试运营. Archived fromthe original on 19 December 2012. Retrieved16 September 2012.
  12. ^ab成都地铁梦想到现实的记忆切片.honglian88.com. Archived fromthe original on 11 August 2018. Retrieved10 August 2018.
  13. ^四川在线 – 总工于波缺席首发 给1号线打90分.sichuan.scol.com.cn. Retrieved10 August 2018.
  14. ^天府"地铁总站"占了地宫两层[图]_新闻频道.news.sohu.com. Retrieved11 August 2018.
  15. ^成都地铁1号线最迟明年6月全面开建(图)_网易新闻.news.163.com. Retrieved11 August 2018.
  16. ^成都开通我国西部地区首条地铁 (in Simplified Chinese). Xinhua News Agency. 27 September 2010. Archived fromthe original on 20 October 2010. Retrieved27 September 2010.
  17. ^成都地铁二号线一期工程本月16日开通试运营 (in Chinese). Sichuan Online. 13 September 2012. Archived fromthe original on 6 May 2014. Retrieved13 September 2012.
  18. ^成都市城市快速轨道交通建设规划(2005-2015)调整方案通过批准.ndrc.gov.cn (in Chinese (China)). Archived fromthe original on 11 August 2018. Retrieved11 August 2018.
  19. ^http://www.chinadaily.com.cn/china/2010-09/27/content_11355596.htm,China Daily, 2010-09-27
  20. ^成都进入地铁时代 市民体验1号线开通试运营 (in Simplified Chinese). Sichuan Online. 24 August 2010. Archived fromthe original on 26 January 2016. Retrieved27 September 2010.
  21. ^成都地铁4号线获发改委批复 10月正式开建 (in Simplified Chinese). Sichuan Online. 22 July 2011. Archived fromthe original on 5 June 2014. Retrieved22 July 2011.
  22. ^成都地铁3号线一期工程获批 最高时速80公里 (in Simplified Chinese). 华西都市报. 27 April 2012. Archived fromthe original on 6 May 2014. Retrieved27 April 2012.
  23. ^成都地铁1号线南延线获国家发改委批复 (in Simplified Chinese). 四川新闻网. 29 August 2012. Archived fromthe original on 21 February 2013. Retrieved29 August 2012.
  24. ^成都地铁3号线一期获批 明日开工设15站点 (in Simplified Chinese). 新华网四川频道. 27 April 2012. Archived fromthe original on 23 May 2012. Retrieved28 April 2012.
  25. ^"地铁1号线南延线今日正式开通 天府新区半小时到市中心_本网最新_新闻首页_成都全搜索".
  26. ^成都市城市轨道交通近期建设规划(2013~2020年)通过批准.ndrc.gov.cn (in Chinese (China)). Archived fromthe original on 11 August 2018. Retrieved11 August 2018.
  27. ^成都地铁10号线一期启动建设 2号线东延线10月有望开通试运营_本网原创_四川新闻_四川在线.sichuan.scol.com.cn (in Chinese (China)). Retrieved19 August 2018.
  28. ^成都地铁5号线开建 北起新都南至天府新区2019年开通 -四川新闻-四川新闻网.scnews.newssc.org. Archived fromthe original on 18 July 2020. Retrieved19 August 2018.
  29. ^"国内设计时速最快 成都轨道交通18号线首台盾构机始发" (in Chinese). 四川新闻网. 28 February 2017. Archived fromthe original on 7 May 2018. Retrieved28 February 2017.
  30. ^成都地铁4号线二期正式开通试运营,移动电子支付系统即日起用于全线网 (in Chinese). Chengdu Metro. 2 June 2017. Archived fromthe original on 6 June 2017. Retrieved2 June 2017.
  31. ^通车!地铁10号线一期今天试运营 "最成都号"上线首发 (in Chinese).163.com news Sichuan. 6 September 2017. Archived fromthe original on 6 September 2017. Retrieved6 September 2017.
  32. ^成都地铁7号线正式开通试运营 (in Chinese). Sichuan Online. 6 December 2017. Retrieved6 December 2017.
  33. ^成都地铁1号线三期今日9点开通试运营 (in Chinese). Sichuan Online. 18 March 2018. Retrieved18 March 2018.
  34. ^双流新都居民喜提成都地铁3号线二三期:晚上都可以去逛春熙路了 (in Chinese). Sina Sichuan. 26 December 2018. Retrieved26 December 2018.
  35. ^""妈妈再也不用担心我'打不到方向'了"!".
  36. ^"明日 成都轨道交通三线齐开". 26 December 2019.
  37. ^成都商报 (严丹 闫宇恒)."成都地铁6号线三期工程轨行区全面转入列车动车调试阶段".
  38. ^"成都轨道交通18号线首开段实现空载".
  39. ^成都商报 (7 August 2020)."6号线、8号线、9号线、17号线、18号线 这些地铁线路今年开通". Sichuan Online.
  40. ^中國新聞网 (18 December 2020)."成都地铁新开5条线 运营里程558公里".
  41. ^爱你的."迎接大运会,成都地铁每个车站有了"身份证号"!".Weixin Official Accounts Platform. Retrieved6 July 2022.
  42. ^爱你的."为了迎接18号线开通,火车南站再添新装备!(放大招,送票卡)".Weixin Official Accounts Platform. Retrieved6 July 2022.
  43. ^"关于成都地铁5号线幸福桥至廖家湾地铁噪音问题,已降低列车运行". 7 August 2020.
  44. ^关于成都市城市轨道交通第三期建设规划(2016~2020年)的批复(发改基础〔2016〕1493号).ndrc.gov.cn. Archived fromthe original on 22 June 2019. Retrieved19 August 2018.
  45. ^成都地铁18号线一期工程昨日正式开工-Chengdu Municipal Development and Reform Commission.cddrc.gov.cn. Archived fromthe original on 7 May 2018. Retrieved19 August 2018.
  46. ^网易.成都地铁8号线一期9号线一期10号线二期正式开工_网易新闻.news.163.com. Retrieved19 August 2018.
  47. ^"成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 28 February 2017. Archived fromthe original on 8 May 2018. Retrieved28 February 2017.
  48. ^"厉害!成都首条无人驾驶地铁要来了!全自动无人驾驶列车亮相!".Sohu. Archived fromthe original on 25 July 2020. Retrieved25 July 2020.
  49. ^"中国西部首条全自动无人驾驶地铁线路——成都轨道交通9号线全线"洞通"".
  50. ^"成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 7 August 2019.[permanent dead link]
  51. ^"成都地铁9号线一期工程长轨通" (in Chinese). 中国中铁. 24 January 2020. Retrieved26 July 2020.
  52. ^ab"8号线一期全线"轨通"!还有其他在建线路最新进展!".
  53. ^"即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
  54. ^"成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
  55. ^"成都地铁6号线一二期工程"通电"啦".
  56. ^ab"喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
  57. ^新浪网 (12 August 2020)."成都地铁8号线建设最新进展".
  58. ^"国家发展改革委关于成都市城市轨道交通第四期建设规划(2019-2024年)的批复". 17 June 2019. Retrieved21 August 2019.
  59. ^"成都市城市轨道交通第四期建设规划全面启动 未来5年再建8个地铁新项目-新闻-上海证券报·中国证券网".news.cnstock.com. Retrieved15 September 2019.
  60. ^"刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线".sichuan.scol.com.cn. Retrieved14 June 2020.
  61. ^"成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工".sichuan.scol.com.cn.
  62. ^"轨道交通资阳线年底前开工建设 预计2024年底通车试运营".
  63. ^"成都地铁单日客运量首次突破700万". 3 April 2021.
  64. ^abc"成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
  65. ^"「四川全"拼"图」成都地铁30号线娇子立交站顺利封顶" (in Chinese). 21 December 2022.
  66. ^"10号线三期、17号线二期、18号线三期……成都轨道交通9条在建线路进展→" (in Chinese).
  67. ^abc"195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  68. ^abcd"地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 21 December 2022.
  69. ^"成都地铁27号线一期全线车站主体结构顺利封顶" (in Chinese).
  70. ^"赶飞机注意!成都地铁18号线快线时刻表公布→".
  71. ^"成都地铁18号线运力增长18%,还提供"地铁+机场"无障碍预约服务".
  72. ^"成都地铁8号线龙莲盾构区间顺利通过验收".
  73. ^"热滑完成!成都地铁19号线二期提前通车有望".
  74. ^"成都轨道交通19号线二期举办"开门评风"媒体交流活动".
  75. ^"成都地铁S3资阳线宝台大道站~苌弘广场站盾构区间左线顺利洞通!".
  76. ^"#成都轨道交通建设进展# 3月29日上午10时左右,伴随着盾构机刀盘缓缓破除玻纤桩驶入车站,轨道交通资阳线"同城一号"盾构机在苌弘广场站顺利出洞,标志着宝台大道站~苌弘广场站盾构区间左线顺利洞通,取得了阶段性的胜利。".weibo.
  77. ^"成成都地铁13号线九新区间顺利完成盾构吊装". 13 January 2023. Retrieved2 April 2023.
  78. ^"成都轨道交通19号线二期轨行区正式移交运营".
  79. ^"成都、上海轨道交通二维码实现互联互通".
  80. ^"#成都轨道交通建设进展# 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电。".weibo.
  81. ^"成都轨道交通19号线二期45列电客车全数交付".Sohu (in Chinese).
  82. ^"轨道交通资阳线,预计明年9月通车!" (in Chinese).
  83. ^"成都轨道线路最新进展:已有109座车站封顶 盾构累计掘进占总量的89%" (in Chinese).
  84. ^"地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese). 18 September 2023.
  85. ^"成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese). 19 September 2023.
  86. ^"成都地铁13号线有最新消息 不止是一条全自动地铁线路" (in Chinese).
  87. ^"成都地铁30号线一期工程全线洞通" (in Chinese).
  88. ^"离开通再近一步!成都地铁19号线二期最新消息" (in Chinese).
  89. ^中铁广州工程局城建公司 (29 September 2023)."中铁广州局重点项目之成都地铁10号线项目". 中铁广州工程局城建公司. Retrieved9 October 2023.
  90. ^"【e周发声】第247期-成都轨道交通17号线清水河大桥站~浣花里站区间双线贯通".Sohu. 9 October 2023. Retrieved9 October 2023.
  91. ^sina_mobile (27 November 2023)."官宣!11月28日,成都地铁19号线二期开通初期运营!".sc.sina.cn. Retrieved29 November 2023.
  92. ^"4月8日!6号线青岛路站正式开启运营服务".成都地铁. 8 April 2024. Retrieved19 December 2024.
  93. ^"今天!S3(资阳)线开门迎客!".成都地铁. 29 September 2024. Retrieved19 December 2024.
  94. ^"8号线二期、27号线一期正式开通,成都都市圈轨道交通线网里程超670公里!".成都地铁. 19 December 2024. Retrieved19 December 2024.
  95. ^"成都轨道交通第五期规划最新公示". 13 January 2023. Retrieved31 March 2023.
  96. ^"成德市域铁路S11线30日开工".chengdu.gov.cn. Retrieved1 April 2023.
  97. ^"四川成都轨道交通线网累计客运量突破100亿人次".ChinaNews.com.cn. Retrieved1 April 2023.
  98. ^"S11线新都段正式开工".
  99. ^"成都:创新引领科技赋能轨道交通高质量发展".
  100. ^2020年 成都市轨道交通运营网总规模约291公里 (in Simplified Chinese). Sichuan Online. 9 November 2012. Archived fromthe original on 6 January 2014. Retrieved9 November 2012.
  101. ^成都地铁加速成网今年13条线同时在建_新闻资讯_新闻首页_成都全搜索.news.chengdu.cn. Retrieved25 February 2017.
  102. ^"地铁"新7线"陆续开始"跑磨合"".四川省交通运输厅 (Sichuan Transport Department).[permanent dead link]
  103. ^"关于成都轨道交通18号线三期工程环境影响报告书的批复". 21 June 2019.
  104. ^"成都轨道交通18号线三期工程首次环境影响评价信息公开". 9 December 2019.
  105. ^"轨道交通30号线一期工程". Archived fromthe original on 10 November 2021.30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74 km,共设车站24座,全部为地下线
  106. ^"《成都市城市轨道交通第五期建设规划(2024-2029年)》环境影响评价第二次公示". 12 January 2023.
  107. ^"正在公示!成都轨道交通线网规划拟优化,首次出现D字头编号".
  108. ^"单程票" (in Chinese). 成都地铁 Chengdu Metro. Retrieved27 July 2020.
  109. ^"下月起 成都将现6元地铁票" (in Chinese). 新浪. 7 May 2013. Retrieved7 May 2013.
  110. ^"地铁公交免费换乘暂不实施" (in Chinese). 新浪. 15 May 2013. Retrieved15 May 2013.
  111. ^"成都地铁票价调整听证,八成代表赞成方案一,你会赞成吗?" (in Chinese). 四川省人民政府. 19 October 2016. Retrieved19 October 2016.
  112. ^"6月2日起成都地铁票价改里程计价 起步价4公里2元". 腾讯. 四川新闻客户端. 27 May 2017. Archived fromthe original on 26 July 2020. Retrieved28 May 2017.
  113. ^ab"天府通" (in Chinese). 成都天府通 Chengdu Tianfutong. Retrieved27 July 2020.
  114. ^"天府通持卡乘车须知" (in Chinese). 成都地铁 Chengdu Metro. 31 July 2017. Retrieved27 July 2020.
  115. ^"长城华西银行" (in Chinese). 长城华西银行. 31 July 2017. Retrieved27 July 2020.
  116. ^"金融IC卡" (in Chinese). 成都地铁 Chengdu Metro. 31 July 2017. Retrieved27 July 2020.
  117. ^成都地铁1号线南延线接触网成功送电 (in Chinese). 中国中铁. 16 December 2014. Retrieved16 December 2014.
  118. ^成都地铁3号线延长线19个站点公布 南起双流北通新都 (in Chinese). Sichuan Online. 13 January 2015. Retrieved13 January 2015.
  119. ^成都地铁4号线二期工程全线接触网"电通" (in Chinese). 成都地铁. 10 December 2016. Retrieved10 December 2016.
  120. ^"揭秘地铁"最强大脑"控制发车 最短间隔90秒".华西都市报. 22 December 2015. Archived fromthe original on 23 December 2017. Retrieved6 July 2022.
  121. ^"成都地铁声称1号线所用信号系统是安全的".四川新闻. 27 September 2011. Archived fromthe original on 31 December 2011. Retrieved6 July 2022.
  122. ^"众合机电与意大利军工巨头签3700万欧元采购备忘-搜狐财经".business.sohu.com. Retrieved6 July 2022.
  123. ^"众合科技:7.12亿地铁信号系统项目中标公示结束_证券_腾讯网".腾讯网. 28 August 2017. Archived fromthe original on 5 April 2020. Retrieved6 July 2022.
  124. ^"两年磨一剑,众合欲争先 —— 成都地铁10号线一期工程文化主题列车首发仪式".搜狐. 7 September 2017. Archived fromthe original on 5 April 2020. Retrieved6 July 2022.
  125. ^"系统集成业绩_交控科技".Traffic Control Technology. Archived fromthe original on 26 December 2017. Retrieved6 July 2022.
  126. ^"交控科技中标成都地铁5号线信号系统项目_交控科技".Traffic Control Technology. Archived fromthe original on 26 December 2017. Retrieved6 July 2022.
  127. ^"7号线开通 卡斯柯助力成都地铁进入"井+环"时代".CASCO. Archived fromthe original on 20 January 2019. Retrieved6 July 2022.
  128. ^成都地铁7号线列车下线 315天刷新"成都速度".sc.sina.com.cn. Retrieved7 October 2018.
  129. ^北京报道, □记者 王璐 (27 December 2019)."成都最长地铁建成通车在即".tech.sina.com.cn. Retrieved26 December 2019.
  130. ^"最成都"地铁车成功试跑 取名"天府神韵"(图) -四川新闻-四川新闻网.scnews.newssc.org. Archived fromthe original on 5 April 2020. Retrieved7 October 2018.
  131. ^明年2月 成都市民将坐上"成都造"地铁.news.chengdu.cn. Archived fromthe original on 5 April 2020. Retrieved7 October 2018.
  132. ^成都地铁4号线二期车辆有望10月全部交付使用_四川新闻_蓉城聚焦_四川在线.sichuan.scol.com.cn. Retrieved7 October 2018.
  133. ^网易.来了!地铁列车开到成都了(图)_网易新闻.news.163.com. Retrieved7 October 2018.
  134. ^"Chengdu Metro orders more cars". 7 April 2011. Retrieved8 April 2011.
  135. ^成都头条."成都地铁线路图更新,你家在哪条新线附近".新浪网.
  136. ^成都地铁规划建设."官方发布的成都地铁2020年线网图,快来围观".
  137. ^"成都地铁线路图".
  138. ^全国首家地铁合资公司9月10日将在成都诞生.Chengdu Post (in Simplified Chinese). 4 September 2010. Archived fromthe original on 6 May 2014. Retrieved6 September 2010.

External links

[edit]
Wikimedia Commons has media related toChengdu Metro.
  • Metros

  • Light metros
Operational
Under planning
Proposed
  • Anqing Metro
  • Baoji Metro
  • Chengde Metro
  • Chenzhou Metro
  • Chifeng Metro
  • Chuzhou Metro
  • Datong Metro
  • Dazhou Metro
  • Ezhou Metro
  • Fuxin Metro
  • Fuyang Metro
  • Guangyuan Metro
  • Haikou Metro
  • Handan Metro
  • Heze Metro
  • Huainan Metro
  • Huizhou Metro
  • Huzhou Metro
  • Jinzhong Metro
  • Liaocheng Metro
  • Lijiang Metro
  • Longyan Metro
  • Luzhou Metro
  • Ma'anshan Metro
  • Mudanjiang Metro
  • Nanchong Metro
  • Nanyang Metro
  • Neijiang Metro
  • Putian Metro
  • Quanzhou Metro
  • Quzhou Metro
  • Rizhao Metro
  • Sanya Metro
  • Shangrao Metro
  • Shiyan Metro
  • Suqian Metro
  • Tangshan Metro
  • Tongling Metro
  • Weifang Metro
  • Weihai Metro
  • Weinan Metro
  • Wuzhou Metro
  • Xiangyang Metro
  • Xingtai Metro
  • Xuancheng Metro
  • Yancheng Metro
  • Yangzhou Metro
  • Yulin Metro
  • Zhangzhou Metro
  • Zhanjiang Metro
  • Zhenjiang Metro
  • Zhuzhou Metro
  • Zibo Metro
  • Zunyi Metro
Suspended
  • Monorail

  • Maglev
Operational
Under
construction
Under planning
Recreation
Operational
Under
construction
Under planning
Closed
APM
Airport
Others
  • Regional rail

  • Suburban rail

  • Commuter rail
China RailwayCR S-train
Beijing
Tianjin
Yangquan
Lianyungang
Ningbo
Shaoxing
Haikou
CRH C-train
CR Shenyang
CR Beijing
CR Zhengzhou
CR Shanghai
CR Wuhan
CR Chengdu
CR Jinan
CR Guangzhou
CR Lanzhou
BRT
Operational
Under
construction
Planned
Autonomous Rail
Rapid Transit

(ART)
Operational
* in / related to the special administrative regions
Public transportation inSichuan Province (SC)
Chengdu MetroChengdu MetroChengdu Metro
Lines in operation
Under construction
Planned
Guang'an MetroGuang'an Metro
Under construction
Planned
Yibin ART
Lines in operation
  • T1
  • T4
Under construction
  • T2
China Railway C-train
Lines in operation
China Railway Intercity rails
Lines in operation
Chengdu Trams
Lines in operation
Under construction
Under planning
Other rail transits
Under construction
Chengdu BRT
Lines in operation
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
Line 1
Main
Spur
Line 2
Line 3
Line 4
Line 5
Line 6
Line 7
Line 8
Line 9
Line 10
Line 17
Line 18
Note: Stations inItalic are under construction.
※only interchange service available, no entrance/exit
Administrative divisions
Districts
Cities
Counties
Transport
Attractions
Education
Secondary
Sec. int'l
Higher
Merged
Military and Law Enforcement
Ground Force
Air Force
Armed Police
Public Security Bureau
MSS
Culture
Sports
Economy
This list is incomplete.
 Bangladesh
 China (PRC)
 India
 Indonesia
 Iran
 Japan
 Kazakhstan
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Chengdu_Metro&oldid=1281849617"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp