Alstom Traxx family (electric) | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Bombardier TRAXX Last Mile | |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
|
Alstom Traxx (sold asBombardier TRAXX before 2021) is a modular product platform of mainlinediesel-electric andelectric locomotives. It was produced originally byBombardier Transportation and laterAlstom, and was built in both freight and passenger variants. The first version was a dual-voltage AC locomotive built for German railways from the year 2000. Later types included DC versions, as well as quadruple-voltage machines, able to operate on all fourelectrification schemes commonly used in Europe.[6] The family was expanded in 2006 to include diesel-powered versions. Elements common to all variants include steel bodyshells, two bogies with two powered axles each, three-phase asynchronousinduction motors, cooling exhausts on the roof edges, and wheel disc brakes.
The TRAXX brand name itself was introduced in 2003. The acronym stands forTransnationalRailwayApplications with eXtreme fleXibility.[7] With the takeover of Bombardier Transportation by Alstom in January 2021, the trademark rights were transferred to the new owner. In the summer of 2023, Alstom extended the use of the word mark to the entire range of locomotives and completely stopped using its own word markPrima . At the same time, communication was switched to the journalistic spelling Traxx and additional word marks were registered.
Locomotives were primarily made for the railways of Germany, with orders coming from other countries includingFrance,Israel,Switzerland,Sweden,Norway,Italy,Belgium,Luxembourg,Poland,Spain,Hungary,South Africa[8] and theNetherlands.
The TRAXX locomotives were developed at Bombardier plants inMannheim,Zürich Oerlikon inSwitzerland andVado Ligure inItaly. The final assembly of the vehicles takes place at Bombardier's locomotive production centres atKassel inGermany and Vado Ligure (only the DC Variant).
In the early 1990s, West German federal railwayDeutsche Bundesbahn (DB) sought to replace its ageing electric locomotive fleet with a single type. In the previous decade, DB introduced its first universal locomotives with three-phase asynchronous induction motors and two bogies with two powered axles each, theDB Class 120, which had been successful. In 1991, DB requested bids[9] for about 1000 more universal locomotives with an improved design and increased power, the planned DB Class 121. The railway industry began developing new locomotives, but in October 1992, DB cancelled the tender[10] due to the high price of the offers and the changed situation.[9] In 1994, Deutsche Bundesbahn merged with the former East GermanDeutsche Reichsbahn, creatingDeutsche Bahn, bringing over 600 modernDR Class 243 locomotives into the joint locomotive fleet. In addition, the merger coincided with a railway reform, dividing the rolling stock of Deutsche Bahn between its regional passenger, long-distance passenger and freight business areas, making the universal locomotive plans obsolete.[10] From late 1993, the business areas of Deutsche Bahn and their predecessors called new bids for electric locomotives tailored for their specific needs.[9][11]
The competitors for the DB Class 121 included two of the forerunners of Bombardier Transportation: German locomotive manufacturerAEG Schienenfahrzeuge, a part ofAEG which was controlled byDaimler-Benz at the time; and ABB Henschel, a German locomotive manufacturing branch of Swedish-Swiss companyABB. Components of both the AEG and ABB concepts were built into the prototypes of the DB Class 120 for trials from late 1991.[10][12] AEG followed up its development effort by building an experimental universal locomotive, the12X.[13] This locomotive can be considered the predecessor of the TRAXX family. The 12X was delivered in June 1994[14] and, although owned by AEG, was designated Class 128 by DB. The 12X featured several innovations compared to the Class 120,[14] including water-cooledinverters based onGTO thyristors, a new final drive concept with pivot axle bearings on both sides,[15] and a new bogie concept with a shortwheelbase of 2,600 mm (102.4 in).[16] The locomotive also had a modular design, allowing the derivation of different versions for different operational needs,[14] and thus it formed AEG's basis to compete for the new orders of Deutsche Bahn's business areas.[9][11] Meanwhile, ABB developed its own design of a modular electric locomotive platform, theEco2000 concept.[9] ABB's concept included a version of its Flexifloat high-speed bogie family with a wheelbase of 2,650 mm (104.3 in); andbiodegradableester cooled inverters with GTO thyristors and an also ester cooled main transformer,[12] which can be considered the origin of the inverters and transformer of the first generation of TRAXX locomotives.[improper synthesis?]
The 12X was later used as testbed for new technologies, becoming the first locomotive in the world withIGBT based converters in 1997[17][18] and testing the MITRAC traction control electronics from 1998.[17] Both of these technologies would later find their commercial application in TRAXX locomotives.
In November 1994, Deutsche Bahn chose ABB and AEG for two of its orders: ABB was to deliver 145 express locomotives for DB's long-distance business areaDB Fernverkehr, theDB Class 101, while AEG was to supply DB's freight business areaDB Cargo with eighty locomotives for medium-weight freight trains, theDBAG Class 145.[19]
The original Class 145 design was a cheaper derivative of the 12X, omitting components for higher speeds, including hollow-shaft drives, which were replaced by simpler axle hung drives.[20] In January 1996, ABB and Daimler-Benz merged their railway business areas into a joint venture,ADtranz.[21] The final design of the locomotive was adapted for more commonalities with the DBAG Class 101.[20] The biodegradable[19] ester cooled inverters with GTO thyristors and the also ester cooled main transformer of the DBAG Class 145 was derived from those of the DBAG Class 101, but with less components for the lower maximum power, providing for individual bogie control rather than individual axle control.[20] The bogie design was also adapted and merged into the ABB-originated Flexifloat family, with wheelbase increased to 2,650 mm (104.3 in).[20] Due to the shared features, the Class 145 was sometimes described as a member of the Eco2000 family.[20]
Adtranz rolled out the first Class 145 in July 1997.[20] In addition, 17 identical locomotives were built for lease to private railways. A further six locomotives were built for the Swiss railway MittelThurgauBahn.[22]
In March 1998, Adtranz announced its intent to consolidate its product range into seven modular product platforms.[23][24] The electric locomotive platform with the brand name"Octeon" was to be based on Adtranz's newest types for Germany (the Class 145 and Class 101).[23] Adtranz originally intended to introduceOcteon types alongside existing products,[23] and applied the name to its new products outside Germany at the end of the nineties, like theFS Class E464[25] or the heavy-haul locomotiveIore.[26] The GTO thyristor based converters of these locomotives were from the water-cooledCamilla family,[25] which was developed by ABB as successor for the oil-cooled converters in theSBB-CFF-FFS Re 460.[27] TheOcteon brand name did not catch on and was abandoned when Bombardier acquired Adtranz in 2001.
Between 2000 and 2002, a version of the DBAG Class 145 for passenger trains, with hollow shaft final drive and a higher top speed of 160 km/h, was produced for DB's regional business areaDB Regio.[3] The top of the front of the carbodies was modified to provide space for aflip-disc display.[28] These locomotives were given the designationDBAG Class 146.0.
Although the production of the DBAG Class 145 ended by the time Bombardier bought Adtranz in 2001, and even the production of the Class 146.0 locomotives ended by the time the TRAXX brand name was introduced in 2003, in Bombardier's own publications, the Class 145 was included in the TRAXX F140 AC,[29] the Class 146.0 in the TRAXX P160 AC type.[30] The still in-production FS Class E464 got the designation TRAXX P160 DCP,[31] while TRAXX H80 AC was applicable to the Iore class,[32] however, these then still in production types were excluded from the TRAXX family in publications after 2007.[33]
In July 1998, Adtranz received a follow-on order for 400 more locomotives for medium-weight freight trains, theDBAG Class 185.[34] The double voltage Class 185 was meant for international operation, and was also dubbedEuropalok.[34] The basic concept of the running gear, the axle hung motors, the ester cooled inverters and transformer was maintained from the Class 145.[35] In addition to the electronics for double voltage operation, modifications included the provision for the installation of the full variety oftrain protection systems in use in Europe, and the lowering of the roof by 105 mm to fit the vehicle in the internationalUIC 505-1 loading gauge.[35][36]
In 2001 Bombardier bought Adtranz, thus acquiring locomotive building technology. Under Bombardier, the Class 185 was developed into a family like that of the Class 145, with private railway and passenger (DBAG Class 146.1) versions. In May 2003, Bombardier also received an order for a quadruple system version from theSwiss Federal Railways (SBB).[37]
In September 2003, Bombardier gave the Class 185 family a brand name,TRAXX, intended to allude to the terms 'traction', 'track' and 'attraction'.[38] The acronym stands forTransnationalRailwayApplications with eXtreme fleXibility.[7] The first letter of TRAXX type designations provides for differentiation according to the area of application, withF for freight andP for passenger.[32] The original system also tentatively includedH for heavy-haul andS forhigh-speed,[32] but no actual vehicles were delivered under this designation. The number following the first letter indicates the top speed of the locomotive in kilometers per hour.[32] The next two letters indicate the supply system, withAC foralternating current electric locomotives,DC fordirect current electric locomotives,MS for multi-system locomotives capable of operating both under AC and DC overhead wires, andDE was foreseen from the start for an eventualDiesel-electric version.[32] An extraP letter at the end was to designate powerheads (traction heads), that is locomotives with one driving cabin for push-pull operation.[32] An also optional number at the end designates different versions,[32] later used for the designation of generations.
In the new system, the factory designation of the DBAG Class 185 and its sisters with other railways becameTRAXX F140 AC, that of the DBAG Class 146.1TRAXX P160 AC, and that of the planned quadruple voltage SBB locomotiveTRAXX F140 MS.
When Bombardier introduced the first TRAXX 2 types, the original family was also designatedTRAXX 1,[7] and the number1 was added at the end of the type designation of first-generation locomotives still in delivery.
In 2004, the basic TRAXX design was subjected to a major overhaul, with the carbody and the front redesigned to suit currentcrashworthiness standards, and the replacement of GTO thyristor based inverters withIGBT based inverters.[39] The option of individual axle control in place of individual bogie control was also introduced.[28] The coolant of the inverters and the main transformer was also changed from ester to water.[28] The carbody design was completely standardised, by default providing a space for the mounting of aflip-disc display above the windshield, which is covered by a non-structural hood in freight versions.[28] The bogie frame was strengthened, to allow an increase ofaxle loads to 22 tons.[28] This generation of the family is also referred to as theTRAXX 2 platform,[7][40] and is sometimes also indicated with a number2 at the end of the type designations.[41]
The TRAXX carbody design and internal configuration was modified again in 2006 when the first actual Diesel-electric version was built, to provide the same layout for Diesel and electric versions.[39] In the electric versions, the central location of the diesel engine was used for the AC transformer or the DC chokes. The weight of the component at the central location is supported on a horizontal mounting plate that fits onto the main frame using the same fixtures.[39] This generation of the family is also referred to as theTRAXX 2E platform,[7] the type designations themselves didn't change.[42] The TRAXX 2E generation also included the first actual deliveries of the DC versions of the TRAXX platform.[42] The AC version of the TRAXX 2 remained in production in parallel with the 2E versions of other types.[43]
In March 2014Transnet ordered 240 dual-voltage1,067 mm (3 ft 6 in) Traxx Africa locomotives, to be built in South Africa.[8] The first locomotive was handed over to Transnet in December 2017, with revenue service planned to begin early in 2018.[44] As of December 2020[update], Transnet is in possession of 56 Traxx Africa locomotives.[45]
All Traxx locomotives are assembled and tested at Alstom's (originally Bombardier) plant inKassel Germany, except the DC only versions which are assembled atVado Ligure and someRENFE Class 253, which have been assembled byRENFE in its shop inVillaverde (Madrid).
The individual components are sourced from a variety of sites:[4]
TRAXX F140 AC / P160 AC TRAXX F140 AC2 | |||||||||
---|---|---|---|---|---|---|---|---|---|
![]() TRAXX F140 AC, DB Class 185 | |||||||||
| |||||||||
| |||||||||
| |||||||||
|
TheTRAXX F140 AC operates on AC overhead lines. They can work under both the 15 kV/16.7 Hz and the 25 kV/50 Hz AC systems. As built they are configured for futureETCS /ERTMS train control and safety systems.[1]
The 200 units built between 2001 and 2003 for Deutsche Bahn were classified asDBAG Class 185, orDBAG Class 185.1 once production switched to the TRAXX F140 AC2 design.[49] A further 57 units were built for various European leasing companies, and were classified in Germany asClass 185.5.
Another 35 units were produced for the freight business area of the Swiss Federal Railways,SBB Cargo (SBB Re482), and 20 units for Swiss private railwayBLS AG (BLS Re485). The Swiss locomotives differ from the German versions in details such as pantographs (2 more, with smaller contacts for running under Swiss catenary (not because of tunnels)) and Switzerland specific safety systems in addition to the German systems.[50][51]
In LuxembourgCFL operates 20 locomotives.
TheTRAXX P160 AC is the passenger version of this class, with a correspondingly higher top speed of 160 km/h. A lower unsprung mass was achieved by using hollow shaft final drives instead of the axle hung motor arrangement of the 140 km/h maximum speed versions. The bogies and drive unit are the same as used in theDBAG Class 146.0.[3]
In Germany,DB Regio acquired 32 units between 2003 and 2005, where they are designatedDBAG Class 146.1.
Additionally, (Landesnahverkehrsgesellschaft Niedersachsen mbH (LVNG), (Hannover) ) has 10 units which are leased to the railway companymetronom (operating asME146).[52]
The first AC member of the TRAXX 2 family, which featured carbodies with improved crashworthiness and water-cooledIGBT-based inverters, was the demonstrator loco185 561, delivered in May 2004. It was produced ahead of the main tranche of TRAXX F140 AC2 locomotives forhomologation of the class in Germany.
Another demonstrator TRAXX F140 AC2,185 568 was used for tests on the then newHSL-Zuid in 2006. Subsequently, it was used for tests of theETCS system.
Both demonstrator locomotives were eventually sold to private operators for normal use.
The remaining 200 of the 400 Class 185 freight locomotives ordered forDB Cargo were to be of this type, and the new versions were given the subclass designationDBAG Class 185.2. Since this large order represented the main body of production at Bombardier'sKassel plant, any further private orders for the AC locomotives would be included into the F140AC2 production line - thus the original F140 AC type effectively ceased production when the production of DB Cargo's (by then renamedRailion) Class 185.2 began.
The locomotives operated by SBB Cargo are designatedRe482.2.
Alongside the F140 AC2 locomotives, the passenger versions received the same improvements. DB Regio received 47 units between 2005 and 2006; as with the freight version the '.2' subclass was used to distinguish these new versions - the Deutsche Bahn locomotives being classified asClass 146.2, following on from the Class 146. A number of smaller orders have been received, including more units for themetronom railway - procured viaLNVG.DB Fernverkehr, the German Railways branch which operates Intercity services, ordered 27 more Class 146.2 locos on 12 January 2011. The locos will start service in December 2013.[53]
In 2012, Bombardier presented the third generation TRAXX. Its exterior is different from previous generations.[54]DB Fernverkehr took delivery of its first TRAXX AC3 locomotives (Class 147.5) in 2018 in a batch of 17. According to a January 2020 IRJ article, DB Fernverkehr refused to take delivery of the second batch of TRAXX AC3 locomotives in 2019 due to software-related issues. The rail-transport company uses its TRAXX AC3 locomotives for its IC2 trains (as seen in the photograph on the right).[55] Models operated byDB Regio are classed as DB Class 147. The TRAXX AC3 has an installed power of 5.6 MW, and a top speed of 160 km/h.[56]
![]() | This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(November 2013) |
As of 2010, production of the AC2 versions is still ongoing, with the DB Schenker order expected to be completed in late 2009. Along with German companies the AC locomotives have orders from Scandinavian countries and from Hungary – where theHungarian State railways (MÁV) (Magyar Államvasutak) has placed an order for 25 (and optional 25) P160 AC2 machines.
Type | Operator | Number | Delivery date | Class | Notes |
---|---|---|---|---|---|
TRAXX F140 AC[47] | DB Cargo (thenRailion, inherited byDB Schenker) | 200 | 2001–2003 | 185.1 | Part of an order of 400, the second batch of 200 were produced as TRAXX F140 AC2 (DBAG Class 185.2)[57] Parts of the class are fitted for operations into Switzerland/Austria/France[58] |
SBB Cargo | 35 | 2002–2003 | Re482 | ||
BLS AG | 20 | 2002-2004 2006 | Re485 | 10 ordered byBLS Lötschbergbahn AG, after merger withRegionalverkehr Mittelland AG (RM) to formBLS AG; a further 10 locomotives | |
CB Rail | 3 | 185.5 | Leasing company, formerlyPorterbrook All leased toVeolia Cargo Deutschland[59] | ||
Alpha Trains | 34 | 185.5 | Leasing company | ||
MRCE | 11 | 185.5 | Leasing company Some equipped to operate in France | ||
Rail4Chem | 8 | 185.5 | |||
ITL Eisenbahngesellschaft | 1 | 185.5 | |||
TRAXX P140 AC | CFL | 20 | 4000 | Units for passenger and freight work – top speed of 140 km/h, also fitted with the necessary equipment for passenger trains.[48] | |
TRAXX P160 AC | DB Regio | 32 | 2003–2005 | 146.1 | |
LNVG | 10 | ME146 | Leased to the railway companymetronom[52] | ||
TRAXX F140 AC2 | Railion since Sept. 2007 DB Schenker[60] | 199 | 2004- | 185.2 | From 185-205 onwards following locomotives were delivered with DB logistics logos, from 185-360 onwards locomotives were delivered in DB Schenker livery[60] 185-321 to 185-337 fitted for work in Sweden via Denmark for subsidiaryRailion Denmark[60] |
SBB Cargo[61] | 15 | 2006 | Re482.2 | For operations in Germany, Switzerland, and after September 2006, Austria. Order included second-hand former Bombardier demonstrator loco 185-561[61] | |
MRCE | 11 | 2005/6 | 185.2 | For use in Germany, Austria and Switzerland | |
Alpha Trains[62] | 25+ | 2006- | 185.2 | Leasing company, customers includeHGK. Most for work in Germany–Austria, also Switzerland, Hungary.[62] | |
10 | 2009 | CE119 or El 19 | Leasing customerCargoNet, locomotive go in Norway and Sweden. | ||
CBRail | 16 | 2007–2009 | 241 | Leasing/finance company. Customers include HGK | |
HectorRail[63] | 10 | 2007–2009 | 241 | For operations in Sweden, Denmark and Germany. Fleet includes formerETCS test machine 185-568. Units also leased. 241-004 namedR2-D2[63] | |
ITL Eisenbahngesellschaft[64] | 1 | 2005 | 185.5 | ITL 185–562, for use in Germany and Austria | |
Green Cargo | 22 | 2010 | Re | 16 units for operation between central and northern Sweden, 6 for operation between Germany and Sweden through Denmark | |
Others (Orders still ongoing as of 2009) | 17 | 2007- | hvle 2 units, Eurocom 2 units for Hungary as Class 481,Beacon Rail 12 units for leasing. | ||
TRAXX P160 AC2 | DB Regio[65] | 47 | 2005–2006 | 146.2 | |
DB Fernverkehr | 27 | 2013–2014 | 146.2 | ||
MÁV | 25 | 2011–2012 | 480 | 001-025 | |
LNVG[65] | 17 | 2005–2007 | ME146/2 | Acquired by LVNG formetronom railway company in Germany | |
Connex nowVeolia[65] | 4 | 2006 | 146.5 | Initially acquired forNord-Ostsee-Bahn, since transferred toVeolia Deutschland and used byRegionalbahn Bitterfeld-Berlin and others including freight work forVeolia Cargo Deutschland | |
TRAXX P160 AC3 | Israel Railways | 62 | 2017 | Ordered in 2015.25 kV 50 Hz AC operation. 6 MW electric output. Initial delivery began in 2017. |
TRAXX F140 MS | |||||||||
---|---|---|---|---|---|---|---|---|---|
| |||||||||
| |||||||||
| |||||||||
|
The first multi-system TRAXX unit that could operate under AC and DC electrified catenaries,SBB Re484 001, was introduced at the same time185 561 was introduced as demonstrator locomotive for the F140 AC2 type. In addition to the 15 kV/16.7 Hz and 25 kV/50 Hz AC supplies, the new model could also be operated under 3 kV DC overhead electrification.[28] Later models also supported a 1.5 kV DC supply. This locomotive for SBB was also the first TRAXX variant with individual axle control in place of individual bogie control.[28] The general type name given by Bombardier wasTRAXX F140 MS.[66]
Apart from the different pantographs, electrical systems for DC operation, the F140 MS types are identical to the contemporary dual voltage versions. However, under 1.5 kV DC, the maximum available power is limited to 4.0 MW, although this does not affect the maximum tractive effort, which is limited by other factors. As a consequence of the additional equipment required, the locomotives weigh approximately 1 tonne more than their dual voltage relatives.[note 1]
The locomotives are designed for cross border operations; the addition of 1.5 kV and 3 kV DC operability potentially allows the locomotives to operate in Poland and Italy. In practice the delivered locomotives were used for work into Switzerland and Italy, and equipped with either the Italian safety systemSCMT orETCS.
Post 2006 many more of thesemulti-system locomotives were produced, this time with some for use in theBenelux countries, as well as France and Poland, with further units being produced for Swiss/Italian traffic. In Poland, locomotives used byPKP Cargo have been designated as theEU43 class (this designation was originally meant for what is now known as theFS Class E.412, which was initially intended for Poland but now mainly operated by Italy). Units hired fromAlpha Trains cargo toSNCB (Belgium) have also received the class numberSNCB Class 28
In July 2018, Bombardier introduced the third generation of TRAXX multi-system locomotives, named the MS3, which in addition to carrying over compatibility with the four electrification systems introduced an onboard engine to enable travel over short distances of non-electrified track.[68]
Type | Operator | Number | Delivery date | Class | Notes |
---|---|---|---|---|---|
TRAXX F140 MS | SBB Cargo[67][69] | 18+3 | 2004/6 | Re484 | First order for the multi-system locomotives. Units fitted with Swiss and Italian safety systems only. Initial units fitted with Integra, ZUB262, and RS4 Codici safety systems, later all fitted with ETCS and SCMT safety systems.[70] |
MRCE | 5 | 2006 | Re484 | Leasing company locomotives. Only homologated and fitted with safety systems for Italy and Switzerland. Numbered Re484.901 onwards. | |
TRAXX F140 MS2 (post 2006 version) | Alpha Trains[71] | 105 | 2006- | E 186 also EU43 (PL) andSNCB Class 28 (BE) | Leasing company. Locomotives delivered and certified for a variety of operations - some for (NL/DE/AT/CH/IT orDE/PL orDE/AT/NL/BE. Others certified for 160 km/h operations onHSL-Zuid.[71] 6 on long-term lease toPKP Cargo (Poland) - designated as classEU43 numbers EU43 001 to EU43 006.[71][72][73] Also asSNCB Class 28 in Belgium. |
CBrail[74] | 35 | 2007- | E 186 | Leasing company. Version built for either operations via Germany to the Low countries, Poland, or Italy (trans-alpine) | |
EuroCargoRail | 20 | 2008- | E 186 | For work in France, also to Germany via Belgium | |
BLS Cargo | 10 | 2008- | Re484 | For transalpine routes via Italy/Austria/Switzerland/Germany | |
Nederlandse Spoorwegen | 45 | 2015- | E 186 | For work in Netherlands (Intercity Service andHSL-Zuid (160 km/h)) and Belgium | |
others | 30+ | 2008/9+ | ITL Eisenbahngesellschaft 2 units,Veolia 6 units,Railpool more than 20 on order[75] | ||
TRAXX MS3 | TX Logistik | 40[68] | Ordered in July 2018, with options for 25 more[68] | ||
Akiem | 10[68] | Ordered in July 2018[68] | |||
ČD Cargo | 10[76] | Class 388[76] | Ordered in August 2018, with options for 40 more[76] | ||
RegioJet | 13[77] | Ordered in February 2023, when delivered, RegioJet will become the largest operator of TRAXX MS3 locomotives.[78] |
TRAXX F140 DC and TRAXX F160 DC[79] | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() Renfe 253.053 atCastellbisbal (Spain) | |||||||||||
| |||||||||||
| |||||||||||
|
Once Bombardier completed the first TRAXX F140 MS, a single-voltage version for DC overhead wires could be produced cost effectively by leaving away the AC equipment of a multi-system locomotive, and Bombardier began seeking a launch customer in 2004.[28] In 2005,Angel Trains (today Alpha Trains) placed an order for 10 DC electric locomotives withBombardier. The first machine, designatedE483 001, was produced in August 2006 at Bombardier's plant in Kassel.
Later machines were built at Bombardier's plant inVado Ligure in Italy, which has become the official site for production of DC versions of the TRAXX locomotives.[80]
The weight of the TRAXX F140 DC is slightly reduced compared to the AC machines which require a particularly heavy high-voltage transformer for use with the low 16.7 Hz frequency of the 15 kV AC system.The machines are built to the same specifications as the rest of the TRAXX family, but only have equipment for 3 kV DC - making them suitable for internal work in Italy, Spain and Poland. If necessary the machines can be rebuilt for multi-system use.[39][80]
Renfe Mercancías, the freight division ofRenfe Operadora ordered 100 locomotives for freight use to be designatedRENFE Class 253; these are the first TRAXX locomotives to be built to anything other than standard gauge.
AdditionallyTrenitalia has ordered 42 locomotives for freight use, which will be operated at up to 160 km/h.
Type | Operator | Number | Delivery date | Class | Notes |
---|---|---|---|---|---|
TRAXX F140 DC | Alpha Trains[80] | 10+10 | 2006-7 2009 | E483 | Leasing company |
others | 19 | 2008-2012 | E 483 series | Nordcargo (DB Schenker Rail) (5+3 units), Ferrovia Emilia Romagna (FER) (2 units), Sistemi Territoriali (2 units), GTS (3+2 units), APS Savona (2 units). All for Italian operations.[81] | |
TRAXX F140 DC Iberian gauge | Renfe Operadora[82] | 100 | 2007–2010 | Class 253 | 55 machines to be built at Vado Ligure, the remaining 45 to be assembled from parts atVillaverde (nr. Madrid). These machines have headlights above cab window and roof mounted air-conditioning.[82] |
COMSA Rail Transport | 3 | 2009 | Class 253 | In September 2009, these units were outshopped in Vado Ligure, Italy, and transported to Spain. | |
TRAXX F160 DC | Trenitalia (Mercitalia)[79] | 42[79] | 2017 | E 483 series | Freight locomotives with top speed of 160 km/h.[79] |
TRAXX P160 DC | Koleje Mazowieckie | 11 | 2011 | E 583 | For push&pullBombardier Double-deck Coaches |
TRAXX F140 DE, TRAXX P160 DE | |||||||||
---|---|---|---|---|---|---|---|---|---|
![]() metronom TRAXX P160 DE locomotive | |||||||||
| |||||||||
| |||||||||
|
The diesel version of the TRAXX platform was introduced with the 2E version of the TRAXX platform. In the diesel version, the fuel tank occupies the same space as the transformer in the electric versions, centrally and below the main frame members. Installed motor power is 2.2MW.[4] The diesel and electric TRAXX locomotives share the same driver cabin and control desk, body, bogies, and drive system.[83] The maximum tractive effort is slight reduced by 30 kN to 270 kN due to the lower power of the diesel engine.
The first order for the diesel passenger version (designated as Class246, Bombardier's designationTRAXX P160 DE) came frommetronom via the leasing companyLNVG. The company already used TRAXX electric locomotives and required locomotives for the non-electrifiedHamburg-Cuxhaven line. 11 locomotives were ordered in 2005, delivery would take place in 2007. The first three engines were built in 2006 for type certification, with one machine being presented officially at theInnoTrans 2006 railfair;[84] they were in service by late 2007.[85]
Leasing companyCBrail was the first to order the freight version (as Class285, Bombardier's designationTRAXX F140 DE) in 2006, the first locomotive was delivery in mid-2007, and had been certified for use by 2008.[86] On 5 December 2008,SNCF Fret placed an order for 45TRAXX F140 DE locomotives, the order being valued at 160 million Euros.[87] The class are to be designated asSNCF Class BB 476000.[88] The contract includes an option for a further 35 locomotives.[89]
In April 2011DB Regio awarded Bombardier a framework agreement for up to 200Traxx DE Multi-Engine locomotives worth a total of €600m; an initial 20 locomotives will be delivered from mid-2013 at a cost of €62m.[90] Thesegenset locomotives will have four 540 kW (720 hp) diesel engines in place of one large engine, with the aim of reducing fuel consumption and exhaust emissions because the engines can be shut down when not needed.[90]
Type | Operator | Number | Delivery date | Class | Notes |
---|---|---|---|---|---|
TRAXX P160 DE | LNVG[85] | 11 | 2007 | 246 | Acquired by LNVG for use bymetronom |
TRAXX F140 DE | CBrail[86] | 10 | 2008 | 285 | Leasing company, Operators includeHVLE,ITL Eisenbahngesellschaft |
Akiem /SNCF[88] | 45 | SNCF BB 476000 | Order of 80, with last 35 as an option. | ||
TRAXX DE ME | DB Regio[90] | 23 | 2013- | 245 | Options for total of 200 |
TRAXX DE ME | DB Fernverkehr | 7 | 2016 | 245 | As above. |
On 10 May 2011, Bombardier announced a new TRAXXelectro-diesel model, dubbed the "Last Mile Diesel", that combined a standard AC propulsion system with a diesel engine to power the locomotive in light-duty applications such as operating on non-electrified sidings or yards.[91] The design was based on Bombardier's experience with building theALP-45DP.[91] At the time the new model was introduced, a launch order for five units was announced byRailpool, which had signed the order in late 2010.[91]
A number of other locomotives built by Bombardier have been derived from or share some technical features with the TRAXX platform:
Die beiden Adtranz-Elloks, die Baureihe 101 und die Baureihe 145, sind heute Teile der Lokomotivfamilie Eco2000 in zukunftssicherer Modulbauweise auf der Basis erprobter Baugruppen. Die Baureihe 145 ist eigentlich als Variante der fortschrittlicheren Baureihe 128 (12X) geplant worden, aber im Laufe ihrer Entwicklung auf Kundenwunsch immer mehr der Baureihe 101 angepaßt worden. Die Entwicklungschritte der 12X sind dabei dennoch berücksichtigt worden. ...Haupttransformator und Stromrichter in Esterkühlung sind konzeptionell von den Loks der Baureihe 101 übernommen und an die geringere Leistung angepasst.
Für die Stromrichter werden statt die bisher verwendeten GTO (Gate-Turn-Off-Thyristoren) mit Esterkühlung nunmehr modernste IGBT mit Wasserkühlung eingesetzt.
However, on 9 December 2020 Transnet stated that only 56 TRAXX Africa locomotives were delivered and accepted for regular service until now (see far below).