Bellevue 600

Coordinates:47°36′57″N122°11′42″W / 47.61583°N 122.19500°W /47.61583; -122.19500
From Wikipedia, the free encyclopedia
Proposed high-rise office building in Bellevue, Washington, United States

Bellevue 600
Bellevue 600 under construction with 555 Tower visible at left
Map
General information
StatusTopped-out
TypeOffice and retail
Location600 108th Avenue Northeast
Bellevue, Washington, U.S.
Coordinates47°36′57″N122°11′42″W / 47.61583°N 122.19500°W /47.61583; -122.19500
Construction startedMarch 2021
Topped-outSeptember 2024
Estimated completion2025
OwnerAmazon
Height
Architectural600 ft (180 m)
Technical details
Floor count43
Floor area1,036,000 square feet (96,200 m2)
Design and construction
Architecture firmNBBJ
DeveloperAmazon
Structural engineerMagnusson Klemencic Associates
Main contractorSellen Construction
Other information
Parking1,175 spaces

Bellevue 600 is a futurehigh-riseoffice building developed byAmazon inBellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2025. The 43-story, 600-foot-tall (180 m) building would join555 Tower as thetallest building in Bellevue. The project is located inDowntown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to theBellevue Transit Center and its Bellevue DowntownLink light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.

History

[edit]

Bellevue 600 is planned to be located on a block bound to the south by Northeast 6th Street, to the west by 108th Avenue Northeast, and to the east by 110th Avenue Northeast. The Bellevue Corporate Center, a 10-story office building on the southwest corner of the block, was built in 1980 to serve as the regional office ofHoneywell.[1][2] A three-storyparking garage with 650 stalls was built on the southeast corner of the block and was later joined by acustomer service center for theBellevue Transit Center that opened in 2006.[1][3] The north half of the block is occupied by a church and a surface parking lot, both of which were sold in 2014 and 2015 to a developer planning athree-tower residential complex.[4][5]

In February 2016, Seattle developer Touchstone and Chicago developerEquity Group Investments applied for permits to build a 34-story office building and 41-story hotel with 500 rooms on the south half of the block, which would retain the Bellevue Corporate Center.[6] The master development plan for the project, named "Bellevue 600", was approved by the city government in April 2017 with minor conditions, but Touchstone and Equity did not plan to begin construction.[1] The approved design included a shared podium between the two towers, an underground parking garage with 1,960 stalls, and a pedestrian bridge connecting to a future development on the north side of the block.[1][7]

Equity Commonwealth, a sister company to Equity Group, retained ownership of the Bellevue Corporate Center and the full 3.5-acre (1.4 ha) property and renovated the building in 2016. The property and project rights were sold toAmazon in April 2019 for $194.9 million through ashell corporation named Acorn Development.[8][9] A revised design plan from NBBJ for a 43-story office building was filed for permitting in July 2019, taking advantage of a city zoning change in 2017 that allows buildings with heights of up to 600 feet (180 m).[10] Amazon announced that it planned to begin construction in 2021 and open the building by 2024 as part of a major expansion into Bellevue with 15,000 total employees in the city.[11][12]

The Bellevue city government granted planning approval for the first phase of the Bellevue 600 project in January 2021.[13] Construction began in March 2021 with demolition of the parking garage on the site.[14][15] The tower topped out in September 2024 and is scheduled to open in 2025.[16]

Design

[edit]

The 43-story, 600-foot-tall (180 m) tower would be the tallest building in Bellevue and the tallest to be built by Amazon, surpassing itsSeattle campus.[10] It is planned to include 885,000 square feet (82,200 m2) of office space, 121,000 square feet (11,200 m2) of office amenities, and 14,000 square feet (1,300 m2) of retail space, including a potentialdaycare. The complex would have an undergroundparking garage with 1,175 stalls that would be shared with a potential 33-story, 430-foot (130 m) tower on the southwest corner of the block.[17][18] A four-story, 16,000-square-foot (1,500 m2) meeting center and publicplaza would be located at the southeast corner of the block, facing theBellevue Downtown light rail station.[11][17] It is designed by Seattle-basedNBBJ and is planned to be built bySellen Construction, working with various contractors and consultants; both companies previously worked with Amazon on their Seattle campus.[11]

A second tower on the southwest corner of the block, replacing the Bellevue Corporate Center, is also planned as part of the Bellevue 600 project.[11] It was initially proposed as a 33-story, 571-foot (174 m) office building, but was later reduced to 27 stories and 392 feet (119 m).[13] The second tower will have 764,000 square feet (71,000 m2) of office space, 13,800 square feet (1,280 m2) of retail and exhibition space on the ground floor, and a childcare center. Its underground parking garage—connected to the first building's garage—will have six levels with 718 stalls for cars and 1,000 stalls for bicycles.[19] Excavation for the second tower began in June 2023 and is scheduled be completed by 2025.[20][21]

See also

[edit]

References

[edit]
  1. ^abcdMiller, Brian (April 10, 2017)."Touchstone gets MDP approval for 600 Bellevue project".Seattle Daily Journal of Commerce. RetrievedFebruary 6, 2020.
  2. ^Varney, Val (May 2, 1979). "Honeywell to make regional home here".The Seattle Times. p. H8.
  3. ^"Around the Eastside: Police substation to open Monday".The Seattle Times. June 23, 2006. p. B3.
  4. ^Stiles, Marc (March 10, 2015)."Chinese group lays out early plans for big downtown Bellevue property".Puget Sound Business Journal. RetrievedFebruary 6, 2020.
  5. ^Miller, Brian (March 22, 2018)."Plus sells majority stake in Elev8 to Stanford Hotels for $128M".Seattle Daily Journal of Commerce. RetrievedFebruary 6, 2020.
  6. ^"Touchstone eyes big project with two towers in Bellevue".Seattle Daily Journal of Commerce. February 26, 2016. RetrievedFebruary 6, 2020.
  7. ^Stiles, Marc (April 10, 2017)."Bellevue approves Sam Zell's plan for two new downtown towers".Puget Sound Business Journal. RetrievedFebruary 6, 2020.
  8. ^Rosenberg, Mike; Romano, Benjamin (April 24, 2019)."Amazon grabs large downtown Bellevue property next to transit hub".The Seattle Times. RetrievedFebruary 6, 2020.
  9. ^Stiles, Marc (January 4, 2019)."Source: Amazon 'most likely' buyer of prime downtown Bellevue property".Puget Sound Business Journal. RetrievedFebruary 6, 2020.
  10. ^abRomano, Benjamin (July 2, 2019)."Amazon plans its tallest tower, marking growing presence in Bellevue".The Seattle Times. RetrievedFebruary 6, 2020.
  11. ^abcdStiles, Marc (January 29, 2020)."First look: Amazon's Bellevue 600 skyscrapers designed to be gateway".Puget Sound Business Journal. RetrievedFebruary 6, 2020.
  12. ^Romano, Benjamin (February 6, 2020)."Amazon plans for 15,000 employees in Bellevue".The Seattle Times. p. A1. RetrievedFebruary 6, 2020.
  13. ^abMiller, Brian (January 11, 2021)."Amazon gets the OK for first Bellevue 600 office tower".Seattle Daily Journal of Commerce. RetrievedFebruary 23, 2021.
  14. ^Craigehad, Callie (March 31, 2021)."Construction on Amazon's Bellevue 600 office building begins as company expands presence on Eastside".Seattle Post-Intelligencer. RetrievedApril 1, 2021.
  15. ^Miller, Brian (March 30, 2021)."Work begins on Amazon's first Bellevue 600 tower".Seattle Daily Journal of Commerce. RetrievedApril 1, 2021.
  16. ^"Bellevue 600 tower tops out".Seattle Daily Journal of Commerce. September 17, 2024. RetrievedNovember 1, 2024.
  17. ^abMiller, Brian (February 7, 2020)."More details emerge for 2-tower Amazon development in Bellevue".Seattle Daily Journal of Commerce. RetrievedFebruary 8, 2020.
  18. ^Stewart, Ashley (July 8, 2019)."Details about Amazon's Bellevue 600 project revealed in public records".Puget Sound Business Journal. RetrievedFebruary 6, 2020.
  19. ^Stiles, Marc (September 11, 2020)."Documents reveal early details of Amazon's Bellevue 600 second tower".Puget Sound Business Journal. RetrievedFebruary 23, 2021.
  20. ^"Project Update – Bellevue 600"(PDF). Sellen Construction. June 2023.
  21. ^Miller, Brian (January 5, 2022)."Amazon's second Bellevue 600 tower gathers more steam".Seattle Daily Journal of Commerce. RetrievedApril 1, 2022.

Further reading

[edit]
People
Current
Former
Facilities
Products and
services
Subsidiaries
Cloud
computing
Services
Devices
Technology
Media
Retail
Logistics
Former
Litigation
Other
Unions
Geography
Areas
Education
Primary and secondary schools
Other education
Other
Sports
Landmarks
This list is incomplete.
See also:List of tallest buildings
Retrieved from "https://en.wikipedia.org/w/index.php?title=Bellevue_600&oldid=1279870778"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp