Capital Airport Express[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() A Capital Airport Express train leavingTerminal 3 station with a landing Boeing 737-700 on the background | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | M34[2]/L1[3] (planned name) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Dongcheng,Chaoyang, andShunyi districts Beijing | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 5 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Airport rail link | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing Capital Metro Corp., Ltd. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Tianzhu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 4-car Type LB (QKZ5 - CNR/CRRC Changchun–Bombardier Innovia ART 200) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 31,300 (2014 Avg.) 49,100 (2014 Peak)[4] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 19 July 2008; 16 years ago (2008-07-19) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 29.9 km (18.6 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground and elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DCthird raillinear induction motor | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 110 km/h (68 mph)[5] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Capital Airport Express | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 北京地铁首都机场线 | ||||||
Traditional Chinese | 北京地鐵首都機場線 | ||||||
| |||||||
TheCapital Airport Express[1] of theBeijing Subway (Chinese:北京地铁首都机场线[1];pinyin:Běijīng Dìtiě Shǒudū Jīchǎng Xiàn), also known by the initialsABC,Airport Beijing City, is anairport rail link fromBeixinqiao station to theBeijing Capital International Airport.[6] The line became operational on July 19, 2008. On subway maps, the Capital Airport Express' color is purplish gray (Pantone 666C).[7]
Capital Airport Express trains first departBeixinqiao, stop atDongzhimen andSanyuanqiao, then stop atTerminal 3. Trains then reverse at Terminal 3 and head toTerminal 2. Trains reverse again and proceed to Beixinqiao, stopping at Sanyuanqiao and Dongzhimen along the way.
A one-way fare on the Capital Airport Express costsRMB(¥) 25, with no free transfers to or from other lines.[8]
Service routes | Station Name | Connections | Nearby Bus Stops | Distance km[9] | Location | ||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
● | ● | Beixinqiao | 北新桥 | 5 | 13 82 84 106 107 116 117 135 612 夜6 夜10 | 0.000 | 0.000 | Dongcheng | |
● | ● | Dongzhimen | 东直门 | 2 13 | 3 18 24 44 75 106 107 117 123 130 132 135 142 200 359 401 404 413 416 418 612 850 850快 852 852快 915 916 916快 918 935 935快 942 980快 快速直达专线72 快速直达专线102 通医专线3 夜6 夜10 夜20 夜32 专26 | 1.822[10] | 1.822 | ||
● | ● | Sanyuanqiao | 三元桥 | 10 12 | 18 95 104 132 300 300快 302 359 368 379 401 403 404 419 536 604 641 671 847 850 850快 852 915 916 916快 918 935 935快 939 980快 快速直达专线72 快速直达专线141 快速直达专线169 快速直达专线195 快速直达专线196 夜18 夜30 | 3.022 | 4.844 | Chaoyang | |
● | ↑ | 3 Hao Hangzhanlou (Terminal 3) | 3号航站楼 | ![]() | 18.322 | 23.166 | Shunyi | ||
↳ | ● | 2 Hao Hangzhanlou (Terminal 2) | 2号航站楼 | ![]() | 7.243 | 30.409 | Chaoyang | ||
The Airport Express was originally planned to run non-stop between Dongzhimen and the Capital Airport. An intermediate stop at Sanyuanqiao was subsequently added for the convenience of passengers connecting to Line 10.[11][12]
Designers for the new line considered several types of technology for the Airport Express, including:
The linear motor option was ultimately decided upon.[11][13]
Planning accelerated after the city won the bid to host the2008 Summer Olympic Games, which included a promise to connect the airport to the Olympic village by subway.[11] The project cost ¥5.4bn and involved a consortium of companies led by the Beijing Dongzhimen Airport Express Rail Company.[14]
The project operated under a tight delivery schedule, initially with very limited public disclosure.[14][15] During construction, officials from both the Beijing Dongzhimen Airport Express Rail Co. andBombardier expressed concerns about whether the project would be completed, as originally planned, by the end of 2007, with test operations to start in April 2008.[15] At the time, Zhang Jianwei, chief country representative for Bombardier, called the short timetable for a project of this type unprecedented. Zhang expressed confidence that Bombardier would meet its responsibilities as its Chinese contractors routinely worked 24 hours a day, something not possible in other countries. He also noted, however, that even if the line were to open on time, the need for haste could compromise the quality of construction.[15]
There was also considerable uncertainty over the progress of the project, the identity of contractors and its operational arrangement. Construction was reported to have begun on June 14, 2005, but aspects of the project still awaited the central government's approval.[16] Local media reported in January 2005 that the train supplier had been “basically decided”, but was not officially selected and announced until March 2006.[15]
Track-laying began in March 2007 and was completed by November 2007.[17] Testing using empty trains commenced in April 2008 and official operations started on July 19 of that year, in time for the opening of the Summer Olympic Games on August 8, 2008.[18][19] The line delivered 2.17 million rides in 2008.[20]
An expansion of the Tianzhu depot was approved in November 2017, improving headways from 10 minutes to 4 minutes.[21]
The line was renamed from Airport Express to Capital Airport Express in September 2019,[22] to avoid confusion withDaxing Airport Express.
A 1.8 km (1.1 mi) western extension toBeixinqiao station was opened for service on 31 December 2021.[23]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dongzhimen — Terminal 3 / Terminal 2 | 19 July 2008 | 28.1 km (17.5 mi) | 4 | Initial phase |
Dongzhimen — Beixinqiao | 31 December 2021 | 1.8 km (1.1 mi)[10] | 1 | Western extension |
The Airport Express line adoptsAdvanced Rapid Transit (since renamed Innovia Metro) technology fromBombardier Transportation, with a fleet of 10QKZ5 trains assembled byChangchun Railway Vehicles (CRV, now part ofCRRC Corporation) under atechnology transfer agreement.[24] The vehicles were based on those used onAirTrain JFK inNew York City, with Bombardier providingbogies as well as theelectrical,propulsion andbrake systems, which were assembled by CRV.
As with the majority of Beijing Subway trains, the Airport Express trains use a 750 Vthird rail power supply, and have a maximum speed of 110 kilometres per hour (68 mph).[5] Trains are configured in fixed sets of four cars with a total of 230 seats, arranged in a longitudinal layout to maximize their quantity.
The line usesAlstom's "Urbalis"communications-based train control system, which is capable ofdriving trains automatically, although staff still monitor the trains from the front (Grade of Automation level 2).[25] At the time of opening, this system made the Airport Express the first rapid transit line with automated operation in China, and the second such rail line of any kind, after thepeople mover in Terminal 3 at the airport, which was also supplied by Bombardier.[15]
Since January 2020, the interiors of the QKZ5 trains were being renovated. The LCD TV display in the passenger compartment has been changed to a 27-inch smart multimedia display that can display flight information and the static paper route map above the door has also been replaced by dynamic LCD screens showing maps and passenger information.[26]
In September 2018, an announcement requesting an 8 additional linear motor trainsets was made.[27] CRRC Changchun won the bid in November of the same year.[28] In 2021, the first train was delivered.[29] The new trains have a blue livery was delivered, equipped with wider seats and mobile phone charging sockets.[30][31]
Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
QKZ5 | CRRC Changchun Railway Vehicles Bombardier Transportation | 2007 | 10 (2007) | L1 101–L1 110 (2007) | Tianzhu | |
CCD3004 | ![]() | CRRC Changchun Railway Vehicles | 2021 | 5 (2022) | L1 111–L1 115 (2021) | Tianzhu |
Reserved space for aninfill station atWangjingnan, where the Capital Airport Express intersects withLine 14, is also part of long-term plans.[32]
In the short term, there is little scope to increase the Capital Airport Express's capacity. The 4-car train sets used on the line have significantly lower capacity than those on other Beijing Subway lines, which operate 6-car or 8-car train sets.[33] Also, the Capital Airport Express track design requires trains from Terminal 3 to first travel to Terminal 2 before returning to the city. If trains were able to return directly from Terminal 3 to the city the capacity on the route could be increased.
最高运行速度110公里/小时
机场线西延工程线路全长约1.822公里