The175th Tunnelling Company was one of thetunnelling companies of theRoyal Engineers created by theBritish Army duringWorld War I. The tunnelling units were occupied in offensive and defensive mining involving the placing and maintaining ofmines under enemy lines, as well as other underground work such as the construction ofdeep dugouts for troop accommodation, the digging of subways, saps (a narrow trench dug to approach enemy trenches), cable trenches and underground chambers for signals and medical services.[1]
By January 1915 it had become evident to theBEF at theWestern Front that the Germans weremining to a planned system. As the British had failed to develop suitable counter-tactics or underground listening devices before the war, field marshalsFrench andKitchener agreed to investigate the suitability of forming British mining units.[2] Following consultations between the Engineer-in-Chief of theBEF, BrigadierGeorge Fowke, and the mining specialistJohn Norton-Griffiths, theWar Office formally approved the tunnelling company scheme on 19 February 1915.[2]
Norton-Griffiths ensured that tunnelling companies numbers 170 to 177 were ready for deployment in mid-February 1915.[3] In the spring of that year, there was constant underground fighting in theYpres Salient atHooge,Hill 60,Railway Wood,Sanctuary Wood,St Eloi andThe Bluff which required the deployment of new drafts of tunnellers for several months after the formation of the first eight companies. The lack of suitably experienced men led to some tunnelling companies starting work later than others. The number of units available to theBEF was also restricted by the need to provide effective counter-measures to the German mining activities.[4] To make the tunnels safer and quicker to deploy, the British Army enlisted experienced coal miners, many outside their nominal recruitment policy. The first nine companies, numbers 170 to 178, were each commanded by a regular Royal Engineers officer. These companies each comprised 5 officers and 269 sappers; they were aided by additional infantrymen who were temporarily attached to the tunnellers as required, which almost doubled their numbers.[2] The success of the first tunnelling companies formed under Norton-Griffiths' command led to mining being made a separate branch of the Engineer-in-Chief's office underMajor-General S.R. Rice, and the appointment of an 'Inspector of Mines' at the GHQSaint-Omer office of the Engineer-in-Chief.[2] A second group of tunnelling companies were formed fromWelsh miners from the1st and 3rd Battalions of theMonmouthshire Regiment, who were attached to the1st Northumberland Field Company of the Royal Engineers, which was aTerritorial unit.[5] The formation of twelve new tunnelling companies, between July and October 1915, helped to bring more men into action in other parts of the Western Front.[4]
Most tunnelling companies were formed under Norton-Griffiths' leadership during 1915, and one more was added in 1916.[1] On 10 September 1915, the British government sent an appeal toCanada,South Africa,Australia andNew Zealand to raise tunnelling companies in theDominions of theBritish Empire. On 17 September, New Zealand became the first Dominion to agree the formation of a tunnelling unit. TheNew Zealand Tunnelling Company arrived atPlymouth on 3 February 1916 and was deployed to the Western Front in northern France.[6] ACanadian unit was formed from men on the battlefield, plus two other companies trained in Canada and then shipped to France. ThreeAustralian tunnelling companies were formed by March 1916, resulting in 30 tunnelling companies of the Royal Engineers being available by the summer of 1916.[1]
175th Tunnelling Company was formed atTerdeghem in April 1915, and moved soon after into the Railway Wood-Hooge-Armagh Wood area of theYpres Salient.[1] From its formation until August 1917 the company served underThird Army.[3][7]
As part of their continued operations against the Ypres Salient after theSecond Battle of Ypres and theBattle of Bellewaarde, the German forces kept seeking to gain the village ofHooge between 24 May and 3 June 1915.[8] In the grounds of the Château de Hooge was a German strongpoint which was proving particularly troublesome to the British forces defending the area. The redoubt had in fact been started by the British but had fallen into German hands.[9]
Major S. H. Cowan,commanding officer of 175th Tunnelling Company, described the situation at Hooge in June 1915: "There is some urgent [mining] work to be done at once in a village [Hooge] on a main road east of Ypres. We hold one half and the job is to get the G[ermans] out of the other, failing that they may get us out and so obtain another hill top from which to overlook the land. It is a significant fact that all their recent attacks round Ypres have been directed on hill tops and have rested content on the same, without trying really hard to advance down the slopes towards us."[10]
In order to break the stalemate, the 175th Tunnelling Company (which was at the time operating with the3rd Division) dug a tunnel about 66 yards (60 m) long[9] under the German position and placed amine there. This occurred during a time of relative quiet on the British part of the Western Front, when few major assaults were made. Nonetheless, the average casualty rate for the British and Commonwealth forces was around 300 per day.[11]
The officer in charge of laying the mine at Hooge was Lieutenant Geoffrey Cassels. He wrote: "[Hooge] was a small village in ruins on top of the ridge, Hooge meaning height, astride the Menin Road. On the north side of the road was a chateau with a separate annex standing in its own grounds by a large wood. Behind the chateau was Bellewarde Lake. In front of the chateau and east of the village proper were the racing stables (...). The stables were at the very apex of the salient. They were actually in our front line. The trenches were shallow and primitive, even the front line ones, and to reach the front lines some tunnels had been driven under the road and part of the ruins. No Man's Land between us and the Germans was littered with blackened corpses (...) and the stink was abominable. (...) Our objective was to sink a shaft, then tunnel under the chateau and annex and blow them up."[10]
The work was completed in five and a half weeks. The first attempt at tunnelling for the mine, starting from within a stable, failed because the soil was too sandy. A second shaft was sunk from the ruins of a gardener's cottage nearby. The main tunnel was in the end 190 feet (58 m) long, with a branch off this after about 70 feet (21 m), this second tunnel running a further 100 feet (30 m) on. The intention was to blow two charges under the German concrete fortifications, although the smaller tunnel was found to be off course. The explosive – used for the first time by the British – wasammonal supported bygunpowder andguncotton, making the Hooge mine the largest mine of the war thus far built.[11] The main difficulties for thetunnellers were that the water table is very high, and that the clay expands as soon as it comes into contact with the air.[9]
At 07.00 p.m. on 19 July 1915 the mine was fired. The explosion created a hole some 6.6 yards (6 m) deep and almost 44 yards (40 m) wide.[9] The far side of the crater was then taken and secured by men from the 1st Battalion,Gordon Highlanders and 4th Battalion,Middlesex Regiment. Ten of the latter were killed by debris from the mine as they waited in advanced positions.[11] The mine fired by 175th Tunnelling Company at Hooge on 19 July 1915 was only the second British offensive underground attack in the Ypres Salient. On 17 April 1915,173rd Tunnelling Company had blown five mines atHill 60 usinggunpowder andguncotton, but none of these mines were even half as powerful as the Hooge charge.[12]
The Germans tried to recover their lost position but were driven back by infantry and a heavy artillery bombardment.[9] By 30 July the German units had managed to take control of the Château de Hooge and the surrounding area.[8] In November 1915,177th Tunnelling Company arrived at Hooge and continued mining there in the defence of Ypres until August 1917. Fighting in the area continued until 1918, with the Hooge Crater (craters beingstrategically important in relatively flat countryside) frequently changing sides.[8]
175th Tunnelling Company was extended to theHill 60 in July 1915,[1] when172nd Tunnelling Company moved into its place atThe Bluff.[1] Deep mining under the German galleries beneath Hill 60 began in late August 1915 with the 175th Tunnelling Company which started a gallery 200 metres (220 yd) behind the British front line and passed 27 metres (90 ft) beneath the German positions. The British underground works consisted of an access gallery (nicknamedBerlin Tunnel) leading to two mine chambers calledHill 60 A (beneath Hill 60) andHill 60 B (beneath The Caterpillar). The3rd Canadian Tunnelling Company took over in April 1916 and completed the galleries, the Hill 60 mine being charged with 53,300 pounds (24,200 kg) of explosives in July 1916 and a branch gallery under the Caterpillar filled with a 70,000-pound (32,000 kg) charge in October. The1st Australian Tunnelling Company took over in November 1916 and maintained the mines at Hill 60 over the winter.[13][14]
Meanwhile, the bulk of 175th Tunnelling Company had moved briefly toSpanbroekmolen in April 1916.[1] Also in April 1916, 175th Tunnelling Company took over work on the deep mines at Kruisstraat from3rd Canadian Tunnelling Company. 175th Tunnelling Company continued to drive the galleries forward and when the main tunnel reached 320 metres (1,051 ft) it was handed over to171st Tunnelling Company who were also responsible for Spanbroekmolen.[15]
As part of the prelude to theBattle of Messines, deep mine galleries were dug by theBritish 171st, 175th and250th Tunnelling companies and the1st Canadian,3rd Canadian and1st Australian Tunnelling companies, while theBritish 183rd,2nd Canadian and2nd Australian Tunnelling companies builtdugouts (underground shelters) in theSecond Army area.[16] The mines at Messines were detonated on 7 June 1917, creating19 large craters.
Having handed over its share of the work at Messines, 175th Tunnelling Company moved toVimy, an area of busy underground activity for much of the war. British tunnellers took over progressively from the French between February and May 1916.[17] Other units active around Vimy in addition to 175th Tunnelling Company were172nd,176th,182nd,184th,185th[18] and255th Tunnelling Companies.
From spring 1916, the British had deployed five tunnelling companies along the Vimy Ridge, and during the first two months of their tenure in the area, 70 mines were fired, mostly by the Germans.[19] Between October 1915 and April 1917 an estimated 150 French, British and German charges were fired in this 7 kilometres (4.3 mi) sector of the Western Front.[17] In May 1916, a German infantry attack, which forced the British back 640 metres (700 yd), was aimed at neutralising British mining activity by capturing the shaft entrances. From June 1916, however, the Germans withdrew many miners to work on theHindenburg Line and also for work in coal mines in Germany. In the second half of 1916 the British constructed strong defensive underground positions, and from August 1916, the Royal Engineers developed a mining scheme to support a large-scale infantry attack on the Vimy Ridge proposed for autumn 1916, although this was subsequently postponed.[19] After September 1916, when the Royal Engineers had completed their network of defensive galleries along most of the front line, offensive mining largely ceased[17] although activities continued until 1917. The British gallery network beneath Vimy Ridge eventually grew to a length of 12 kilometres (7.5 mi).[17]
In October 1916, 175th Tunnelling Company moved away again from the Vimy sector[17] and returned to the Ypres Salient.
175th Tunnelling Company then deployed toLoker, about two miles west ofKemmel and nearWijtschate, where it constructed bunkers. Known as theLettenberg Bunkers, they are located at the edge of a woodland along the road from Kemmel, climbing up a hill towards Loker. These fortifications were constructed in the spring of 1917, although the 175th Tunnelling Company had been digging to create underground headquarters here for some months before that. There are four bunkers, including a first aid post which has a red cross painted on the wall, and a command post located at the far end. There are information boards outside the bunkers.[20]
Destroyed the entrance inclines toHermies catacombs in March 1918, as the enemy advanced fromCambrai.[1]
Built bridges over the Ancre in the British advanced on the Somme in Autumn 1918.[1]
An overview of the history of 175th Tunnelling Company is also available in Robert K. Johns,Battle Beneath the Trenches: The Cornish Miners of 251 Tunnelling Company RE, Pen & Sword Military 2015 (ISBN 978-1473827004), p. 217see online
{{cite book}}