Movatterモバイル変換


[0]ホーム

URL:


Wayback Machine
26 captures
29 Mar 2010 - 08 Mar 2012
JulAUGSep
03
200920102011
success
fail
COLLECTED BY
Organization:Alexa Crawls
Starting in 1996,Alexa Internet has been donating their crawl data to the Internet Archive. Flowing in every day, these data are added to theWayback Machine after an embargo period.
Collection:alexa_web_2010
this data is currently not publicly accessible.
TIMESTAMPS
loading
The Wayback Machine - https://web.archive.org/web/20100803031905/http://blog.wimbledon.org:80/2010/03/26/the-new-court-3/

The Wimbledon Blog

The Championships and The All England Lawn Tennis Club
Skip to content

The New Court 3

New Court 3 building work

Building the new Court 3

Building work on the new No.3 Court remains on schedule, with the outer structure of the stadium now largely complete.

Construction has been continuing since the end of the 2009 Championships, with the 2,000 seater stadium – built over the old Court 2 and Court 3 - ready for the 2011 Championships.

This entry was written byWimbledon, posted on26 March, 2010 at 5:26 pm, filed underAround the Grounds. Bookmark thepermalink. Follow any comments here with theRSS feed for this post.Trackbacks are closed, but you canpost a comment.

One Comment

  1. Emmanuel
    Posted 23 April, 2010 at 2:53 am|Permalink

    i so excited for a new edition of Wimbledon! Roger will be the champion! bye


Post a Comment

Blog at WordPress.com.|Theme:Sandbox 1.1.

[8]ページ先頭

©2009-2026 Movatter.jp