Other name(s): | Stolmasund Bridge |
---|---|
Completion: | 1998 |
Status: | in use |
Structure: | Box girder bridge Haunched girder bridge |
---|---|
Function / usage: | Road bridge |
Material: | Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: | Balanced cantilever method |
Location: | Austevoll,Vestland,Norway |
---|---|
Coordinates: | 59° 59' 46.50" N 5° 5' 55.88" E |
main span | 301 m | |
total length | 467 m | |
span lengths | 94 m - 301 m - 72 m | |
number of spans | 3 | |
deck | deck depth | 3.500 - 15.000 m |
deck width | 9.000 m |
structural steel | 1 850 t | |
concrete volume | 11 500 m³ |
superstructure | prestressed concrete |
---|---|
piers | reinforced concrete |