Advertisement
| Name in local language: | 因島大橋 (Innoshima Ō-hashi) |
|---|---|
| Beginning of works: | 8 January 1977 |
| Completion: | 4 December 1983 |
| Status: | in use |
| Structure: | Three-span suspension bridge |
|---|---|
| Function / usage: | upper deck:Motorway bridge / freeway bridge lower deck:Bicycle and pedestrian bridge |
| Material: | Steel bridge Structurae Plus/Pro - Subscribe Now! |
| Support conditions: | for registered users |
| Secondary structure(s): | Structurae Plus/Pro - Subscribe Now! |
| Plan view: | Structurae Plus/Pro - Subscribe Now! |
| Deck levels: | Structurae Plus/Pro - Subscribe Now! |
| Location: | Innoshima,Hiroshima,Japan Mukaishima,Hiroshima,Japan |
|---|---|
| Part of: | |
| Location description: | Located on the Onomichi-Imabari Route betweenInnoshima andMukaishima. |
| Coordinates: | 34° 21' 16.19" N 133° 10' 25.84" E |
| Coordinates: | 34° 21' 35.61" N 133° 11' 11.64" E |
| main span | 770 m | |
| total length | 1 339.0 m | |
| span lengths | 34.3 m - 250.0 m - 770.0 m - 250.0 m - 34.7 m | |
| number of spans | 5 | |
| vertical navigation clearance | 50 m | |
| pylons | height | 135.85 m |
| truss | height | 9 m |
| cables | steel |
|---|---|
| pylons | steel |
| deck truss | steel |
| anchorages | reinforced concrete |
You have exceeded your monthly download limit!
Structurae Plus subscribers can download30 media files or data sets per month.
Structurae Pro users are limited to50.
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.