Cost Risk Assessment of Power Transmission and Transformation Project Based on MCS-GA-ELM

Sha et al., 2023

Document ID
7731866390021546401
Author
Sha J
Lu Y
Nie L
Dong H
Wu H
Publication year
Publication venue
2023 4th International Conference on Information Science, Parallel and Distributed Systems (ISPDS)

External Links

Snippet

China's power industry is promoting reforms in energy types and data processing. The construction of power transmission and transformation projects, which occupy an important position in the power construction industry, has a high degree of cost risk due to its wide …
Continue reading atieeexplore.ieee.org (other versions)

Classifications

The classifications are assigned by a computer and are not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the classifications listed.
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Investment, e.g. financial instruments, portfolio management or fund management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/54Management of operational aspects, e.g. planning, load or production forecast, maintenance, construction, extension
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation, credit approval, mortgages, home banking or on-line banking
    • G06Q40/025Credit processing or loan processing, e.g. risk analysis for mortgages

Similar Documents

PublicationPublication DateTitle
CN112990556A (en)User power consumption prediction method based on Prophet-LSTM model
CN108491969A (en)Spatial Load Forecasting model building method based on big data
Zhang et al.Study on water quality prediction of urban reservoir by coupled CEEMDAN decomposition and LSTM neural network model
CN105825351A (en)Post evaluation method and risk management and control method of construction cost of power transmission project
CN107229993A (en)A kind of Short-Term Load Forecasting Method based on KM APSO SVM models
CN112446534A (en)Construction period prediction method and device for power transmission and transformation project
CN114169254A (en)Abnormal energy consumption diagnosis method and system based on short-term building energy consumption prediction model
CN109543897A (en)Local government debt risk dynamic evaluation and prediction technique
CN112085156A (en) A method and system for the prediction of partial pressure line loss rate and the evaluation of loss reduction potential
Liu et al.Changing trends and influencing factors of energy productivity growth: A case study in the Pearl River Delta Metropolitan Region
CN117709555A (en) A carbon emission prediction and evaluation method and system based on the transformer carbon accounting model
CN109447332A (en)A kind of Middle-long Electric Power Load Forecast method suitable for S type load curve
CN115549082A (en) Electric Load Forecasting Method Based on Load Mining and LSTM Neural Network
CN114875196A (en)Method and system for determining converter tapping quantity
CN111105218A (en) A method for monitoring the operation of distribution network based on holographic imaging technology
CN110738565A (en) Real estate finance artificial intelligence composite risk control model based on data collection
CN113344449A (en)Method for predicting monthly-scale industrial water demand
CN116933945A (en)Project construction period prediction method based on multiple linear regression
Wu et al.A BP neural network based on improved PSO for increasing current efficiency of copper electrowinning
CN110533213A (en)Transmission line of electricity defect Risk Modeling and its prediction technique based on support vector machines
Sha et al.Cost Risk Assessment of Power Transmission and Transformation Project Based on MCS-GA-ELM
CN112488475A (en)Method and system for differential evaluation of multi-level gridding reliability
Wang et al.Cloud computing and extreme learning machine for a distributed energy consumption forecasting in equipment-manufacturing enterprises
Chen et al.Construction of power transmission and transformation project cost information platform based on big data analysis
Qiang et al.The combination Prediction of BTP in Sintering Process based on Bayesian Framework and LS-SVM