Singh et al., 2006
ViewPDF| Publication | Publication Date | Title |
|---|---|---|
| Singh et al. | Obsolescence driven design refresh planning for sustainment-dominated systems | |
| Carroll et al. | Systematic literature review: How is model-based systems engineering justified? | |
| Isik | An entropy-based approach for measuring complexity in supply chains | |
| Cachon et al. | In search of the bullwhip effect | |
| US8219435B2 (en) | Determining task status based upon identifying milestone indicators in project-related files | |
| Govan et al. | The resource-based view on project risk management | |
| US20140337083A1 (en) | System and method for supply chain optimization | |
| Gutierrez-Alcoba et al. | A simple heuristic for perishable item inventory control under non-stationary stochastic demand | |
| Manna et al. | Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration | |
| US20140278711A1 (en) | Systems Engineering Lifecycle Cost Estimation | |
| Pourakbar et al. | End‐of‐life inventory problem with phaseout returns | |
| Büyüktahtakın et al. | A mixed-integer programming approach to the parallel replacement problem under technological change | |
| Magnaye et al. | System development planning using readiness levels in a cost of development minimization model | |
| Sandborn | Forecasting technology and part obsolescence | |
| Murthy | Product reliability and warranty: an overview and future research | |
| Jung et al. | Modeling lateral transshipments in multiechelon repairable-item inventory systems with finite repair channels | |
| US20110178948A1 (en) | Method and system for business process oriented risk identification and qualification | |
| Jeet et al. | Logistics network design with inventory stocking for low-demand parts: Modeling and optimization | |
| Ugurlu et al. | Reliability-based performance analysis of mining drilling operations through Markov chain Monte Carlo and mean reverting process simulations | |
| Pinçe et al. | The role of contract expirations in service parts management | |
| US20090048889A1 (en) | Manufacturing portfolio flexibility planning | |
| Olugbode et al. | The role of information technology in achieving the organisation's strategic development goals: A case study | |
| Jiang et al. | Production planning problems with joint service-level guarantee: a computational study | |
| Yun et al. | An optimal reliability and maintainability design of a searching system | |
| US7251583B2 (en) | Minimizing use of parts that will reach their end of life prior to the products for which those parts are usable |