Movatterモバイル変換


[0]ホーム

URL:


US3547192A - Method of metal coating and electrically heating a subterranean earth formation - Google Patents

Method of metal coating and electrically heating a subterranean earth formation
Download PDF

Info

Publication number
US3547192A
US3547192AUS813502AUS3547192DAUS3547192AUS 3547192 AUS3547192 AUS 3547192AUS 813502 AUS813502 AUS 813502AUS 3547192D AUS3547192D AUS 3547192DAUS 3547192 AUS3547192 AUS 3547192A
Authority
US
United States
Prior art keywords
metal
formation
earth formation
plating
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US813502A
Inventor
Edmond L Claridge
Michael Prats
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell USA Inc
Original Assignee
Shell Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Oil CofiledCriticalShell Oil Co
Application grantedgrantedCritical
Publication of US3547192ApublicationCriticalpatent/US3547192A/en
Anticipated expirationlegal-statusCritical
Expired - Lifetimelegal-statusCriticalCurrent

Links

Images

Classifications

Definitions

Landscapes

Description

United States Patent Inventors Elmond L. Claridge;
Michael Prats, Houston, Tex.
Appl. No. 813,502 Filed Patented Assignee April 4, 1969 Dec. l5, 1970 Shell Oil Company New York, N.Y. a corporation of Delaware METHOD OFMETAL COATING AND ELECTRICALLY HEATING A SUBTERRANEAN `[56] References Cited UNITED STATES PATENTS 2,118,669 5/1938 Grebe 166/248 2,267,683 12/1941 l66/292X 2,818,118 12/1957 166/248 3,137,347 6/1964 166/248 3,141,504 7/1964 Sarapuu 166/248 3,149,672 9/1964 Orkiszewski et al. 166/248 3,393,737 7/1968 Richardson 166/292 Prirmzry- Examner-jan A` Calvert Attorneys-Louis J. Bovasso and J. H. Mc Carthy ABSTRACT: A method of electrically heating a subterranean EARTH FORMATION l0 Claims, 2 Drawing Figs. earth formation by metallizing a portion of the formation and electrically connecting a source of electrical energy to the U.S. CI 166/248, metallized portion. The formation may be metallized by elec- 166/272, 166/292, 166/302 trOless metal plating and/or by introducing liquid metal. Anlnt.Cl E2lb 33/138, amount of electrical current sufficient to produce heat is E21b43/20,E2lb43/24 flowed through the metallized portion of the subterranean Field of Search .i 166/248, earth formation. Fluid may be injected while the current is 272, 292, 302, 65 being applied.
*- ISV\ v V T 2? Lf' efr* l. 24 I9 2e 2o TTL-I 1.-.' i l vl, v, v', vl v( v v Pmmiufmsmm 3541192 .f w f^ INVENTORS: Y FIG 2 EDMOND L. CLARIDGE MICHAEL PRATS THEIR ATTORNEY METHOD F METAL COATING AND ELECTRICALLY HEATING A SUBTERRANEAN EARTH FORMATION BACKGROUND OF THE INVENTION l. Field of the Invention I This invention relates to the recovery of solid, liquid and gaseous carbonaceous fuels; and, more particularly, to a method of utilizing electric current to heat a subterranean earth formation.
2. Description ofthe Prior Art It is well known to apply electrical current to oil horizons and other subsurface formations to aid oil or mineral production and achieve related purposes therein. Thus, subsurface and formation heating by electrical means, electrolytic migration of subsurface fluids, linking of electrodes in subsurface formations, physically linking such electrodes bycarbonized channels, circumferential wellbore carbonization, wellbore fracturing by electrical means, etc., have all been described in the prior art, as for example in U.S. Pat. Nos. 2,795,279, 2,889,882, 3,137,347, 3,141,504, and 2,3,21 1,220. The typical complete well installations utilized in practicing such processes contemplate spaced well boreholes with discrete solid metal electrodes or electrode analogs` embedded in an earth formation or in the fluids of such an earth formation, or yet in gravel packs communicating with an earth formation whereby to transfer electrical energy to the formation or fluids thereof.
However, discrete solid metal electrodes used in such prior art processes tend to undergo localized overheating, electrode polarization, etc., that soon render them inefficient or ineffective in respect to transmitting current into the earth formations.
SUMMARY OF THE INVENTION lt is an object of this invention to provide an improved method for heating a subterranean earth formation by flowing an electric current therethrough.
lt is a further object of this invention to provide a method of controlling the electrical fracturing of a subterranean earth formation. v
lt is a still further object of this invention to-provide an improved method of consolidating an incompetentearth formation by metallizing the formation utilizing an electrical current in the process in conjunction with heating the formation.
These and other objects are preferably carried out by metallizing or metal-permeating a permeable portion of the earth formation with an electrically conductive body of metal and connecting a source of electrical energy to themetallized portion. An amount of electric current sufficient to produce heat is then flowed through the metallized portion of the subterranean earth formation.
BRIEF DESCRIPTION OF THE DRAWING FIG. l is a vertical sectional, partly schematic, view of a preferred embodiment for carrying out theconcepts of our invention; and
FIG. 2 is a vertical sectional, partly schematic, view of a method for producing hydrocarbon from a formation heated in accordance with the teachings of our invention.
DESCRIPTION of THE PREFERRED EMBODIMENT Although our invention will be described herenbelow with respect to a rubbled permeable zone within a normally impermeable subterranean earth formation, it is to be understood that the metal-permeated portion to be described may comprise either a normally permeable portion of an earth formation that is encountered by the borehole of a well, such as a reservoir sand, or a fracture-permeated or rubbled region within a normally impermeable formation. such as an oil shale.
Referring now to the drawing, FIG. 1 shows a well borehole extending into communication with a normally impermeable subterranean earth formation 11. Earth formation 1l is overlaid by anoverlying earth formation 12. A rubbled area ofpermeable zone 13 may be formed in formation 11 surrounding the well borehole l0 by any means known in the art, such as detonating a relatively high energy explosive device in formation 11 thereby creating a chimney of rubble so as to render the formation l1 permeable. Wellborehole 10 is preferably cased atcasing 14 withcasing 14 cemented therein, as is well known in the art. A plurality ofperforations 25 are shown disposed incasing 14, thereby communicating wellborehole 10 with thepermeable zone 13. Obviously, the number of perforations depends on the extent of theperrneable zone 13. l
Atubing string 16 is disposed inwell borehole 10 packed off fromcasing 14 atpacking means 17. An insulatedcable 18 extends throughtubing string 16 and has an electrode i9 disposed at its lowermost end.Cable 18 extends out of tubing string 176 16 and is electrically connected, at its upper end, to apower source 20 for supplying electric current toelectrode 19.
Electrode 19 preferably extends, at its lowermost end, into communication with a metal-permeated portion of thepermeable zone 13, as for example, into apool 21 of liquid metal. Further, formation 11 may be additionallyl metallized, as will be discussed further hereinbelow, at least within the exposed permeable portions thereof. Obviously, the particular locations for metallizing thepermeable zone 13 may be selected in accordance with a predetermined schedule for heating and/or fracturing formation 11. Such metallized areas may be in the form of either liquid metal, metal plating or both.
In all embodiments of our invention, however, at least a portion of the particular earth formation being treated, such as earth formation 11, is permeated with metal. As discussed hereinabove, the permeating metal may be inthe form of a liquid that penetrates into at least the surface of the earth formation 11, such aspool 21, ormetal plating 22 that is deposited on either the surfaces of the grains or the walls of the pores of apermeable zone 13. In the preferred embodiment illustrated in FIG. l, the electrical connection betweenpower source 20 and the metal-permeated earth formation 11 is supplemented by metal plating the formation 11 (as atmetal plating 22) in addition to permeating it with liquid metal (as at pool 21).
Thepermeable zone 13 is preferably metal plated by circulating a metal-depositing solution throughannulus outlet 23, down the annulus betweentubing string 16 andcasing 14, out of perforations l5 and into formation 1l, thus forming metal plating 22. Liquid metal may be introduced throughtubing outlet 24, downtubing string 16 and into the' bottom ofborehole 10, thus formingliquid metal pool 21.Casing 14 may be grounded as atground 25, as is known inthe electrical art. Aswitch 26, for opening and closing the electrical circuit, is preferably interposed betweenelectrode 19 andpower source 20. Aground 27 completes the circuit betweenpower source 20 andelectrode 19 as illustrated in FIG. 1.
ln operation, upon actuation ofswitch 26, the circuit is closed and electric current flows frompower source 20 throughelectrode 19 and intopool 21. The dashed lines in FIG. l indicate the flow path of electric current frompool 21 through the metal plating 22 tocasing 14. An amount of current is flowed sufficient to produce heat and thus increase the permeability ofpermeable zone 13 for subsequent production of hydrocarbons therefrom.
Where the natural formation is impermeable as illustrated in FIG. 1, the metal-plating solution may be spotted and held in the rubbled portion of the formation to be plated. Suitable metal-deposition solutions are described in U.S. Pat. No. 3,393,737 to Richardson, directed to an electroless metal deposition process. In such a situation, a first portion of the metal-plating solution may be kept static for a time sufficient to become depleted and then displaced with a fresh batch of solution in the lmanner described in a copending application to Richardson Ser. No. 692,726, filed Dec. 22, 1967 now U.S. Pat. No. 3,500,926.
-Where the earth formation is normally permeable and no ceation of a permeable zone is required, the electroless metal-plating technique disclosed in the Richardson patent is preferred. In such a situation, the permeable zone would be similar tozone 13 of FIG. l, but would be permeated by fluids that flow radially in the manner described in the aforementioned Richardson patent.
."A'Where an electroless metal-plating process is used, a highly conductive metal plating, such as a copper plating, is preferred. Where a liquid metal is used, it may comprise substantially any metal or metallic alloy which is liquid in the environment of the subsurface earth formation being treated. It may be spotted in the bottom of the well borehole, as illus- (rated in FIG. l, and injected into the rubbled portion of an impermeable earth formation, also as illustrated in FIG. l, by pressuring the tubing string I6 while allowing liquid metal solution to enter the annulus throughannulus outlet 23 at a point above packing means 17 A metallic substance such as a metal or metallic alloy that has both a relatively low melting point and a relatively high boiling point, for example a metal such as gallium, is particularly suited for use in the carrying outpf the concepts of our invention. The density contrast between a liquefied metal and a fluid such as water, which would normally be used in conventional fluid injection processes for displacing our solution into formation Il surrounding well borehole l0, ensures the deposition of the liquefied metal as discussed hereinabove.
Y, Where the earth formation being treated is normally permeable,` and a liquid metal is used, the pressure within thetubing string 17 is preferably maintained within general limits. Duringljlthe electrical-heating operation, the pressure in tubing siting' 17 is preferably maintained too low to displace all of the liquefied metal out of well borehole l and into earth formation' vl l, and too high to allow the formation pressure to back flowenough of the metal into the well borehole l0 to establish a contact between it and a metal conduit that has a lower voltage potential.
The heating ofpermeable zone 13 serves to solidify loose sandl grain particles disposed inpermeable zone 13. Thus, the techniques of our invention may be applied to the consolidation of loose or incompetent subsurface earth formations.
/Referring now to FIG. 2, wherein like numerals'refer to like parts of FIG. l, asecond well borehole 28 is illustrated spaced from well borehole and extending into communication with formation '11. Wellborehole 28 iscasedat casing 29 with the casing cemented therein as is well known in the art. A tubing strinfg 30'is disposed inwell borehole 28 and packed off at packing means 3l. A plurality ofperforations 32 are provided in'lcasing 29 in the manner discussed hereinabove with respect to, fperforations l5. Anannulus outlet 33 is provided at the u r end ofcasing 29; atubing string outlet 34 is similarly ded at the upper end oftubing string 30. Bothoutlets 33 34 are coupled to suitable conduits (not shown) for in- -cing fluids into and flowing fluids out of formation Il, as
,Y 'iquid metal pool 35 is shown disposed at the lower end ofw borehole 28.Pool 35 is similar to pool 2l of well borehole formed in the manner discussed hereinabove with respect to powcil21. ln like manner, metal plating 36, similar to metal platl2, is shown previously formed in thepermeable zone 37ofiij'ell borehole 28, all in the manner discussed hereinabove, with respect to well borehole l0.
flii'order to produce fluids from formation i l, bothpermeaones 13 and 37 are extended until they intersect as illustrated on FIG. 2. This may be accomplished by electrically heating both zones in the manner disclosed hereinabove until such intersection is obtained. Therespective pools 2l and 35, andmetal plating 22 and 36, also intersect at this point. For convenience of illustration, it is to be understood that metal plating 22 is extended tofintersect with plating 36 in such a manner that the regions between well boreholes It) and 28 are suitably metal-platedflnt'his manner, the loose sand grain parthe well boreholes l0 and 28, while electricity is also passed into the formation via theelectrodes 22, 36. High current densities (amperes per square centimeter of borehole area or of external electrode area) can thus be achieved without overheating of the rock or sand formation Il in the vicinity of theelectrode 22, 36. vThe injected fluid, preferably water of any convenient composition, carries the excess heat away from the vicinity of thewellbores 10 and 28. Besides this, the injected fluid thus heated will warm and transport oil or other valuable material from a first well borehole towards a second wellbore used for recovery of these materials. The attainment Iof high current densities permits the heating, at an appreciable rate, of oil or other valuable material at a significant distance away from the wellbore. For example, with a current density of 1A; ampere per square centimeter at the outer surface of a porous, metallized sand electrode l meter in radius (such as metal plating 22 and 36), a typical rock formation can be electrically heated at a rate of about l C./day at a radius of 100 meters from the well. Such current density could not be maintained without cooling, as the temperature rise around the perimeter of the electrode would otherwise be about 1 C./second.
A similar process may be carried out inwellbore 10 of FIG. l by injecting fluid throughfmetal plating 2l and 22 while flowing electricity therethrough. f
The electrification of bothzones 13 and 37 (FIG. 2) may be l stopped and formation fluids may be flowed from formation 11 throughperforations 32, up the annulus formed betweentubing string 30 andcasing 29 ofwell borehole 28, and out ofannulus outlet 33. Suitable valves (not shown) may be provided for decreasing the overburden pressure so that fluids are recovered from formation 11, all in the `manner well-known in the art. Hydrocarbons may then be separated from the recovered formation fluids by passing such fluids through suitable separation means as illustrated in FIG. 2.
We claim:
l.. A method of electrically heating a subterranean earth formation comprising the steps'of:
providing on a permeable portion of said subterranean earth formation a coating of electrically conductive body of metal; thereafter,
electrically connecting a source of electrical energy to the metal coated portion of said subterranean earth forma tion; and
flowing an amount of electric current sufficient to produce heat through said metal-coated portion of said subterranean earth formation.
2. The method of claim 1 including the step of first extending a well borehole into communication with said earth formation; and wherein the step of metal-coating portion of said earth formation includes the step of injecting a permeating liquid metal down said well borehole and into contact with said formation.
3. The method of' claim 2 wherein the step of metal-coating a portion of said earth formation includes the step of injecting a liquid metal-plating solution into the formation.
d. The method of claim 3 wherein the step of injecting a liquid metal-plating solution includes the step'of injecting a metal-plating solution containing a highly conductive metal into the formation.
5. The'method of claim 2 wherein the step of injecting a per meating liquid metal includes the step of injecting sufficient liquid metal to form a pool that penetrates into at least a portion of said earth formation.
6. The method of claim 5 wherein the step of injecting liquid fmetal to form a pool includes the step of injecting a metallic metal-coated portion.
9. The method of claim l wherein the step of electrically connecting a source of electric energy includes the step of providing an electrode extending from the surface of the earth into contact with the metal-coated portion of said earth formation.
10. The method of claim l including the step of heating said formation by injecting fluid through said metal-coated portion while electric current is being flowed therethrough.
US813502A1969-04-041969-04-04Method of metal coating and electrically heating a subterranean earth formationExpired - LifetimeUS3547192A (en)

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
US81350269A1969-04-041969-04-04

Publications (1)

Publication NumberPublication Date
US3547192Atrue US3547192A (en)1970-12-15

Family

ID=25212569

Family Applications (1)

Application NumberTitlePriority DateFiling Date
US813502AExpired - LifetimeUS3547192A (en)1969-04-041969-04-04Method of metal coating and electrically heating a subterranean earth formation

Country Status (1)

CountryLink
US (1)US3547192A (en)

Cited By (88)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US3620300A (en)*1970-04-201971-11-16Electrothermic CoMethod and apparatus for electrically heating a subsurface formation
US3931856A (en)*1974-12-231976-01-13Atlantic Richfield CompanyMethod of heating a subterranean formation
US3946809A (en)*1974-12-191976-03-30Exxon Production Research CompanyOil recovery by combination steam stimulation and electrical heating
US3958636A (en)*1975-01-231976-05-25Atlantic Richfield CompanyProduction of bitumen from a tar sand formation
US3973627A (en)*1971-10-181976-08-10Sun Oil Company (Delaware)Wellbore gravel pack method
US4030549A (en)*1976-01-261977-06-21Cities Service CompanyRecovery of geothermal energy
US4401162A (en)*1981-10-131983-08-30Synfuel (An Indiana Limited Partnership)In situ oil shale process
US4415034A (en)*1982-05-031983-11-15Cities Service CompanyElectrode well completion
US4466484A (en)*1981-06-051984-08-21Syminex (Societe Anonyme)Electrical device for promoting oil recovery
US4572582A (en)*1982-06-041986-02-25Ryeczek John JMethod of mining metals located in the earth
US4884634A (en)*1985-12-031989-12-05Industrikontakt Ing. O. Ellingsen & Co.Process for increasing the degree of oil extraction
US4886118A (en)*1983-03-211989-12-12Shell Oil CompanyConductively heating a subterranean oil shale to create permeability and subsequently produce oil
US5255742A (en)*1992-06-121993-10-26Shell Oil CompanyHeat injection process
US5297626A (en)*1992-06-121994-03-29Shell Oil CompanyOil recovery process
WO1999001640A1 (en)*1997-07-011999-01-14Alexandr Petrovich LinetskyMethod for exploiting gas and oil fields and for increasing gas and crude oil output
US6199634B1 (en)1998-08-272001-03-13Viatchelav Ivanovich SelyakovMethod and apparatus for controlling the permeability of mineral bearing earth formations
US6499536B1 (en)*1997-12-222002-12-31Eureka Oil AsaMethod to increase the oil production from an oil reservoir
WO2005103444A1 (en)*2004-04-232005-11-03Shell Internationale Research Maatschappij B.V.Inhibiting effects of sloughing in wellbores
US20070137857A1 (en)*2005-04-222007-06-21Vinegar Harold JLow temperature monitoring system for subsurface barriers
US7461691B2 (en)2001-10-242008-12-09Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US20090071647A1 (en)*2003-04-242009-03-19Vinegar Harold JThermal processes for subsurface formations
US7533719B2 (en)2006-04-212009-05-19Shell Oil CompanyWellhead with non-ferromagnetic materials
US7540324B2 (en)2006-10-202009-06-02Shell Oil CompanyHeating hydrocarbon containing formations in a checkerboard pattern staged process
US7549470B2 (en)2005-10-242009-06-23Shell Oil CompanySolution mining and heating by oxidation for treating hydrocarbon containing formations
US20090283257A1 (en)*2008-05-182009-11-19Bj Services CompanyRadio and microwave treatment of oil wells
US7640987B2 (en)2005-08-172010-01-05Halliburton Energy Services, Inc.Communicating fluids with a heated-fluid generation system
US7770643B2 (en)2006-10-102010-08-10Halliburton Energy Services, Inc.Hydrocarbon recovery using fluids
US7798221B2 (en)2000-04-242010-09-21Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US7798220B2 (en)2007-04-202010-09-21Shell Oil CompanyIn situ heat treatment of a tar sands formation after drive process treatment
US7809538B2 (en)2006-01-132010-10-05Halliburton Energy Services, Inc.Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
US7831133B2 (en)2005-04-222010-11-09Shell Oil CompanyInsulated conductor temperature limited heater for subsurface heating coupled in a three-phase WYE configuration
US7832482B2 (en)2006-10-102010-11-16Halliburton Energy Services, Inc.Producing resources using steam injection
US7866386B2 (en)2007-10-192011-01-11Shell Oil CompanyIn situ oxidation of subsurface formations
US20110036575A1 (en)*2007-07-062011-02-17Cavender Travis WProducing resources using heated fluid injection
US20110124223A1 (en)*2009-10-092011-05-26David Jon TilleyPress-fit coupling joint for joining insulated conductors
US20110134958A1 (en)*2009-10-092011-06-09Dhruv AroraMethods for assessing a temperature in a subsurface formation
US20110132661A1 (en)*2009-10-092011-06-09Patrick Silas HarmasonParallelogram coupling joint for coupling insulated conductors
US8151907B2 (en)2008-04-182012-04-10Shell Oil CompanyDual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations
US8220539B2 (en)2008-10-132012-07-17Shell Oil CompanyControlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation
US8327932B2 (en)2009-04-102012-12-11Shell Oil CompanyRecovering energy from a subsurface formation
US8485256B2 (en)2010-04-092013-07-16Shell Oil CompanyVariable thickness insulated conductors
US8586867B2 (en)2010-10-082013-11-19Shell Oil CompanyEnd termination for three-phase insulated conductors
US8608249B2 (en)2001-04-242013-12-17Shell Oil CompanyIn situ thermal processing of an oil shale formation
US8631866B2 (en)2010-04-092014-01-21Shell Oil CompanyLeak detection in circulated fluid systems for heating subsurface formations
US8701768B2 (en)2010-04-092014-04-22Shell Oil CompanyMethods for treating hydrocarbon formations
US8820406B2 (en)2010-04-092014-09-02Shell Oil CompanyElectrodes for electrical current flow heating of subsurface formations with conductive material in wellbore
US8857051B2 (en)2010-10-082014-10-14Shell Oil CompanySystem and method for coupling lead-in conductor to insulated conductor
US8939207B2 (en)2010-04-092015-01-27Shell Oil CompanyInsulated conductor heaters with semiconductor layers
US8943686B2 (en)2010-10-082015-02-03Shell Oil CompanyCompaction of electrical insulation for joining insulated conductors
US9016370B2 (en)2011-04-082015-04-28Shell Oil CompanyPartial solution mining of hydrocarbon containing layers prior to in situ heat treatment
US9033042B2 (en)2010-04-092015-05-19Shell Oil CompanyForming bitumen barriers in subsurface hydrocarbon formations
US9048653B2 (en)2011-04-082015-06-02Shell Oil CompanySystems for joining insulated conductors
US9080917B2 (en)2011-10-072015-07-14Shell Oil CompanySystem and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor
US9080409B2 (en)2011-10-072015-07-14Shell Oil CompanyIntegral splice for insulated conductors
US9226341B2 (en)2011-10-072015-12-29Shell Oil CompanyForming insulated conductors using a final reduction step after heat treating
US9309755B2 (en)2011-10-072016-04-12Shell Oil CompanyThermal expansion accommodation for circulated fluid systems used to heat subsurface formations
US10047594B2 (en)2012-01-232018-08-14Genie Ip B.V.Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation
US10487636B2 (en)2017-07-272019-11-26Exxonmobil Upstream Research CompanyEnhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US10641079B2 (en)2018-05-082020-05-05Saudi Arabian Oil CompanySolidifying filler material for well-integrity issues
US10941644B2 (en)2018-02-202021-03-09Saudi Arabian Oil CompanyDownhole well integrity reconstruction in the hydrocarbon industry
US11002123B2 (en)2017-08-312021-05-11Exxonmobil Upstream Research CompanyThermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US11125075B1 (en)2020-03-252021-09-21Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11142681B2 (en)2017-06-292021-10-12Exxonmobil Upstream Research CompanyChasing solvent for enhanced recovery processes
US11149510B1 (en)2020-06-032021-10-19Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11187068B2 (en)2019-01-312021-11-30Saudi Arabian Oil CompanyDownhole tools for controlled fracture initiation and stimulation
US11255130B2 (en)2020-07-222022-02-22Saudi Arabian Oil CompanySensing drill bit wear under downhole conditions
US11261725B2 (en)2017-10-242022-03-01Exxonmobil Upstream Research CompanySystems and methods for estimating and controlling liquid level using periodic shut-ins
US11280178B2 (en)2020-03-252022-03-22Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11391104B2 (en)2020-06-032022-07-19Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11414963B2 (en)2020-03-252022-08-16Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11414984B2 (en)2020-05-282022-08-16Saudi Arabian Oil CompanyMeasuring wellbore cross-sections using downhole caliper tools
US11414985B2 (en)2020-05-282022-08-16Saudi Arabian Oil CompanyMeasuring wellbore cross-sections using downhole caliper tools
US11434714B2 (en)2021-01-042022-09-06Saudi Arabian Oil CompanyAdjustable seal for sealing a fluid flow at a wellhead
US11506044B2 (en)2020-07-232022-11-22Saudi Arabian Oil CompanyAutomatic analysis of drill string dynamics
US11572752B2 (en)2021-02-242023-02-07Saudi Arabian Oil CompanyDownhole cable deployment
US11619097B2 (en)2021-05-242023-04-04Saudi Arabian Oil CompanySystem and method for laser downhole extended sensing
US11624265B1 (en)2021-11-122023-04-11Saudi Arabian Oil CompanyCutting pipes in wellbores using downhole autonomous jet cutting tools
US11631884B2 (en)2020-06-022023-04-18Saudi Arabian Oil CompanyElectrolyte structure for a high-temperature, high-pressure lithium battery
US11697991B2 (en)2021-01-132023-07-11Saudi Arabian Oil CompanyRig sensor testing and calibration
US11719089B2 (en)2020-07-152023-08-08Saudi Arabian Oil CompanyAnalysis of drilling slurry solids by image processing
US11727555B2 (en)2021-02-252023-08-15Saudi Arabian Oil CompanyRig power system efficiency optimization through image processing
US11725504B2 (en)2021-05-242023-08-15Saudi Arabian Oil CompanyContactless real-time 3D mapping of surface equipment
US11739616B1 (en)2022-06-022023-08-29Saudi Arabian Oil CompanyForming perforation tunnels in a subterranean formation
US11846151B2 (en)2021-03-092023-12-19Saudi Arabian Oil CompanyRepairing a cased wellbore
US11867012B2 (en)2021-12-062024-01-09Saudi Arabian Oil CompanyGauge cutter and sampler apparatus
US11867008B2 (en)2020-11-052024-01-09Saudi Arabian Oil CompanySystem and methods for the measurement of drilling mud flow in real-time
US11954800B2 (en)2021-12-142024-04-09Saudi Arabian Oil CompanyConverting borehole images into three dimensional structures for numerical modeling and simulation applications
US12203366B2 (en)2023-05-022025-01-21Saudi Arabian Oil CompanyCollecting samples from wellbores

Cited By (231)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US3620300A (en)*1970-04-201971-11-16Electrothermic CoMethod and apparatus for electrically heating a subsurface formation
US3973627A (en)*1971-10-181976-08-10Sun Oil Company (Delaware)Wellbore gravel pack method
US3946809A (en)*1974-12-191976-03-30Exxon Production Research CompanyOil recovery by combination steam stimulation and electrical heating
US3931856A (en)*1974-12-231976-01-13Atlantic Richfield CompanyMethod of heating a subterranean formation
US3958636A (en)*1975-01-231976-05-25Atlantic Richfield CompanyProduction of bitumen from a tar sand formation
US4030549A (en)*1976-01-261977-06-21Cities Service CompanyRecovery of geothermal energy
US4466484A (en)*1981-06-051984-08-21Syminex (Societe Anonyme)Electrical device for promoting oil recovery
US4401162A (en)*1981-10-131983-08-30Synfuel (An Indiana Limited Partnership)In situ oil shale process
US4415034A (en)*1982-05-031983-11-15Cities Service CompanyElectrode well completion
US4572582A (en)*1982-06-041986-02-25Ryeczek John JMethod of mining metals located in the earth
US4886118A (en)*1983-03-211989-12-12Shell Oil CompanyConductively heating a subterranean oil shale to create permeability and subsequently produce oil
US4884634A (en)*1985-12-031989-12-05Industrikontakt Ing. O. Ellingsen & Co.Process for increasing the degree of oil extraction
US5255742A (en)*1992-06-121993-10-26Shell Oil CompanyHeat injection process
US5297626A (en)*1992-06-121994-03-29Shell Oil CompanyOil recovery process
USRE35696E (en)*1992-06-121997-12-23Shell Oil CompanyHeat injection process
WO1999001640A1 (en)*1997-07-011999-01-14Alexandr Petrovich LinetskyMethod for exploiting gas and oil fields and for increasing gas and crude oil output
US6499536B1 (en)*1997-12-222002-12-31Eureka Oil AsaMethod to increase the oil production from an oil reservoir
US6199634B1 (en)1998-08-272001-03-13Viatchelav Ivanovich SelyakovMethod and apparatus for controlling the permeability of mineral bearing earth formations
US7798221B2 (en)2000-04-242010-09-21Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8225866B2 (en)2000-04-242012-07-24Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8485252B2 (en)2000-04-242013-07-16Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8789586B2 (en)2000-04-242014-07-29Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8608249B2 (en)2001-04-242013-12-17Shell Oil CompanyIn situ thermal processing of an oil shale formation
US7461691B2 (en)2001-10-242008-12-09Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8627887B2 (en)2001-10-242014-01-14Shell Oil CompanyIn situ recovery from a hydrocarbon containing formation
US8579031B2 (en)2003-04-242013-11-12Shell Oil CompanyThermal processes for subsurface formations
US7942203B2 (en)2003-04-242011-05-17Shell Oil CompanyThermal processes for subsurface formations
US20090071647A1 (en)*2003-04-242009-03-19Vinegar Harold JThermal processes for subsurface formations
US7640980B2 (en)2003-04-242010-01-05Shell Oil CompanyThermal processes for subsurface formations
CN1946918B (en)*2004-04-232010-11-03国际壳牌研究有限公司Inhibiting effects of sloughing in wellbores
US7510000B2 (en)2004-04-232009-03-31Shell Oil CompanyReducing viscosity of oil for production from a hydrocarbon containing formation
WO2005103444A1 (en)*2004-04-232005-11-03Shell Internationale Research Maatschappij B.V.Inhibiting effects of sloughing in wellbores
US20050269091A1 (en)*2004-04-232005-12-08Guillermo Pastor-SanzReducing viscosity of oil for production from a hydrocarbon containing formation
US8355623B2 (en)2004-04-232013-01-15Shell Oil CompanyTemperature limited heaters with high power factors
US20050269095A1 (en)*2004-04-232005-12-08Fairbanks Michael DInhibiting reflux in a heated well of an in situ conversion system
US7320364B2 (en)2004-04-232008-01-22Shell Oil CompanyInhibiting reflux in a heated well of an in situ conversion system
AU2005236069B2 (en)*2004-04-232008-08-07Shell Internationale Research Maatschappij B.V.Inhibiting effects of sloughing in wellbores
US7357180B2 (en)2004-04-232008-04-15Shell Oil CompanyInhibiting effects of sloughing in wellbores
US7575052B2 (en)2005-04-222009-08-18Shell Oil CompanyIn situ conversion process utilizing a closed loop heating system
US7500528B2 (en)2005-04-222009-03-10Shell Oil CompanyLow temperature barrier wellbores formed using water flushing
US7860377B2 (en)2005-04-222010-12-28Shell Oil CompanySubsurface connection methods for subsurface heaters
US7575053B2 (en)2005-04-222009-08-18Shell Oil CompanyLow temperature monitoring system for subsurface barriers
US7942197B2 (en)2005-04-222011-05-17Shell Oil CompanyMethods and systems for producing fluid from an in situ conversion process
US20070137857A1 (en)*2005-04-222007-06-21Vinegar Harold JLow temperature monitoring system for subsurface barriers
US7986869B2 (en)2005-04-222011-07-26Shell Oil CompanyVarying properties along lengths of temperature limited heaters
US8027571B2 (en)2005-04-222011-09-27Shell Oil CompanyIn situ conversion process systems utilizing wellbores in at least two regions of a formation
US8070840B2 (en)2005-04-222011-12-06Shell Oil CompanyTreatment of gas from an in situ conversion process
US7831134B2 (en)2005-04-222010-11-09Shell Oil CompanyGrouped exposed metal heaters
US7831133B2 (en)2005-04-222010-11-09Shell Oil CompanyInsulated conductor temperature limited heater for subsurface heating coupled in a three-phase WYE configuration
US7435037B2 (en)2005-04-222008-10-14Shell Oil CompanyLow temperature barriers with heat interceptor wells for in situ processes
US7527094B2 (en)2005-04-222009-05-05Shell Oil CompanyDouble barrier system for an in situ conversion process
US8224165B2 (en)2005-04-222012-07-17Shell Oil CompanyTemperature limited heater utilizing non-ferromagnetic conductor
US8233782B2 (en)2005-04-222012-07-31Shell Oil CompanyGrouped exposed metal heaters
US8230927B2 (en)2005-04-222012-07-31Shell Oil CompanyMethods and systems for producing fluid from an in situ conversion process
US7546873B2 (en)2005-04-222009-06-16Shell Oil CompanyLow temperature barriers for use with in situ processes
US7640987B2 (en)2005-08-172010-01-05Halliburton Energy Services, Inc.Communicating fluids with a heated-fluid generation system
US7635025B2 (en)2005-10-242009-12-22Shell Oil CompanyCogeneration systems and processes for treating hydrocarbon containing formations
US7549470B2 (en)2005-10-242009-06-23Shell Oil CompanySolution mining and heating by oxidation for treating hydrocarbon containing formations
US7562706B2 (en)2005-10-242009-07-21Shell Oil CompanySystems and methods for producing hydrocarbons from tar sands formations
US7559367B2 (en)2005-10-242009-07-14Shell Oil CompanyTemperature limited heater with a conduit substantially electrically isolated from the formation
US7581589B2 (en)2005-10-242009-09-01Shell Oil CompanyMethods of producing alkylated hydrocarbons from an in situ heat treatment process liquid
US8606091B2 (en)2005-10-242013-12-10Shell Oil CompanySubsurface heaters with low sulfidation rates
US7584789B2 (en)2005-10-242009-09-08Shell Oil CompanyMethods of cracking a crude product to produce additional crude products
US7591310B2 (en)2005-10-242009-09-22Shell Oil CompanyMethods of hydrotreating a liquid stream to remove clogging compounds
US7556096B2 (en)2005-10-242009-07-07Shell Oil CompanyVarying heating in dawsonite zones in hydrocarbon containing formations
US7556095B2 (en)2005-10-242009-07-07Shell Oil CompanySolution mining dawsonite from hydrocarbon containing formations with a chelating agent
US7559368B2 (en)2005-10-242009-07-14Shell Oil CompanySolution mining systems and methods for treating hydrocarbon containing formations
US8151880B2 (en)2005-10-242012-04-10Shell Oil CompanyMethods of making transportation fuel
US7809538B2 (en)2006-01-132010-10-05Halliburton Energy Services, Inc.Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
US7610962B2 (en)2006-04-212009-11-03Shell Oil CompanySour gas injection for use with in situ heat treatment
US8857506B2 (en)2006-04-212014-10-14Shell Oil CompanyAlternate energy source usage methods for in situ heat treatment processes
US7793722B2 (en)2006-04-212010-09-14Shell Oil CompanyNon-ferromagnetic overburden casing
US7673786B2 (en)2006-04-212010-03-09Shell Oil CompanyWelding shield for coupling heaters
US8083813B2 (en)2006-04-212011-12-27Shell Oil CompanyMethods of producing transportation fuel
US8192682B2 (en)2006-04-212012-06-05Shell Oil CompanyHigh strength alloys
US7631689B2 (en)2006-04-212009-12-15Shell Oil CompanySulfur barrier for use with in situ processes for treating formations
US7533719B2 (en)2006-04-212009-05-19Shell Oil CompanyWellhead with non-ferromagnetic materials
US7604052B2 (en)2006-04-212009-10-20Shell Oil CompanyCompositions produced using an in situ heat treatment process
US7912358B2 (en)2006-04-212011-03-22Shell Oil CompanyAlternate energy source usage for in situ heat treatment processes
US7597147B2 (en)2006-04-212009-10-06Shell Oil CompanyTemperature limited heaters using phase transformation of ferromagnetic material
US7635023B2 (en)2006-04-212009-12-22Shell Oil CompanyTime sequenced heating of multiple layers in a hydrocarbon containing formation
US7683296B2 (en)2006-04-212010-03-23Shell Oil CompanyAdjusting alloy compositions for selected properties in temperature limited heaters
US7785427B2 (en)2006-04-212010-08-31Shell Oil CompanyHigh strength alloys
US7866385B2 (en)2006-04-212011-01-11Shell Oil CompanyPower systems utilizing the heat of produced formation fluid
US7832482B2 (en)2006-10-102010-11-16Halliburton Energy Services, Inc.Producing resources using steam injection
US7770643B2 (en)2006-10-102010-08-10Halliburton Energy Services, Inc.Hydrocarbon recovery using fluids
US8191630B2 (en)2006-10-202012-06-05Shell Oil CompanyCreating fluid injectivity in tar sands formations
US7730947B2 (en)2006-10-202010-06-08Shell Oil CompanyCreating fluid injectivity in tar sands formations
US7540324B2 (en)2006-10-202009-06-02Shell Oil CompanyHeating hydrocarbon containing formations in a checkerboard pattern staged process
US7703513B2 (en)2006-10-202010-04-27Shell Oil CompanyWax barrier for use with in situ processes for treating formations
US7677314B2 (en)2006-10-202010-03-16Shell Oil CompanyMethod of condensing vaporized water in situ to treat tar sands formations
US7717171B2 (en)2006-10-202010-05-18Shell Oil CompanyMoving hydrocarbons through portions of tar sands formations with a fluid
US7845411B2 (en)2006-10-202010-12-07Shell Oil CompanyIn situ heat treatment process utilizing a closed loop heating system
US7730945B2 (en)2006-10-202010-06-08Shell Oil CompanyUsing geothermal energy to heat a portion of a formation for an in situ heat treatment process
US7562707B2 (en)2006-10-202009-07-21Shell Oil CompanyHeating hydrocarbon containing formations in a line drive staged process
US7644765B2 (en)2006-10-202010-01-12Shell Oil CompanyHeating tar sands formations while controlling pressure
US7677310B2 (en)2006-10-202010-03-16Shell Oil CompanyCreating and maintaining a gas cap in tar sands formations
US7673681B2 (en)2006-10-202010-03-09Shell Oil CompanyTreating tar sands formations with karsted zones
US7631690B2 (en)2006-10-202009-12-15Shell Oil CompanyHeating hydrocarbon containing formations in a spiral startup staged sequence
US7841401B2 (en)2006-10-202010-11-30Shell Oil CompanyGas injection to inhibit migration during an in situ heat treatment process
US7635024B2 (en)2006-10-202009-12-22Shell Oil CompanyHeating tar sands formations to visbreaking temperatures
US7730946B2 (en)2006-10-202010-06-08Shell Oil CompanyTreating tar sands formations with dolomite
US8555971B2 (en)2006-10-202013-10-15Shell Oil CompanyTreating tar sands formations with dolomite
US7681647B2 (en)2006-10-202010-03-23Shell Oil CompanyMethod of producing drive fluid in situ in tar sands formations
US7832484B2 (en)2007-04-202010-11-16Shell Oil CompanyMolten salt as a heat transfer fluid for heating a subsurface formation
US8459359B2 (en)2007-04-202013-06-11Shell Oil CompanyTreating nahcolite containing formations and saline zones
US9181780B2 (en)2007-04-202015-11-10Shell Oil CompanyControlling and assessing pressure conditions during treatment of tar sands formations
US7798220B2 (en)2007-04-202010-09-21Shell Oil CompanyIn situ heat treatment of a tar sands formation after drive process treatment
US8042610B2 (en)2007-04-202011-10-25Shell Oil CompanyParallel heater system for subsurface formations
US7841408B2 (en)2007-04-202010-11-30Shell Oil CompanyIn situ heat treatment from multiple layers of a tar sands formation
US8662175B2 (en)2007-04-202014-03-04Shell Oil CompanyVarying properties of in situ heat treatment of a tar sands formation based on assessed viscosities
US7849922B2 (en)2007-04-202010-12-14Shell Oil CompanyIn situ recovery from residually heated sections in a hydrocarbon containing formation
US8381815B2 (en)2007-04-202013-02-26Shell Oil CompanyProduction from multiple zones of a tar sands formation
US7950453B2 (en)2007-04-202011-05-31Shell Oil CompanyDownhole burner systems and methods for heating subsurface formations
US8791396B2 (en)2007-04-202014-07-29Shell Oil CompanyFloating insulated conductors for heating subsurface formations
US7841425B2 (en)2007-04-202010-11-30Shell Oil CompanyDrilling subsurface wellbores with cutting structures
US8327681B2 (en)2007-04-202012-12-11Shell Oil CompanyWellbore manufacturing processes for in situ heat treatment processes
US7931086B2 (en)2007-04-202011-04-26Shell Oil CompanyHeating systems for heating subsurface formations
US9133697B2 (en)2007-07-062015-09-15Halliburton Energy Services, Inc.Producing resources using heated fluid injection
US20110036575A1 (en)*2007-07-062011-02-17Cavender Travis WProducing resources using heated fluid injection
US8536497B2 (en)2007-10-192013-09-17Shell Oil CompanyMethods for forming long subsurface heaters
US8196658B2 (en)2007-10-192012-06-12Shell Oil CompanyIrregular spacing of heat sources for treating hydrocarbon containing formations
US8240774B2 (en)2007-10-192012-08-14Shell Oil CompanySolution mining and in situ treatment of nahcolite beds
US7866388B2 (en)2007-10-192011-01-11Shell Oil CompanyHigh temperature methods for forming oxidizer fuel
US7866386B2 (en)2007-10-192011-01-11Shell Oil CompanyIn situ oxidation of subsurface formations
US8011451B2 (en)2007-10-192011-09-06Shell Oil CompanyRanging methods for developing wellbores in subsurface formations
US8113272B2 (en)2007-10-192012-02-14Shell Oil CompanyThree-phase heaters with common overburden sections for heating subsurface formations
US8146669B2 (en)2007-10-192012-04-03Shell Oil CompanyMulti-step heater deployment in a subsurface formation
US8272455B2 (en)2007-10-192012-09-25Shell Oil CompanyMethods for forming wellbores in heated formations
US8276661B2 (en)2007-10-192012-10-02Shell Oil CompanyHeating subsurface formations by oxidizing fuel on a fuel carrier
US8146661B2 (en)2007-10-192012-04-03Shell Oil CompanyCryogenic treatment of gas
US8162059B2 (en)2007-10-192012-04-24Shell Oil CompanyInduction heaters used to heat subsurface formations
US8636323B2 (en)2008-04-182014-01-28Shell Oil CompanyMines and tunnels for use in treating subsurface hydrocarbon containing formations
US9528322B2 (en)2008-04-182016-12-27Shell Oil CompanyDual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations
US8177305B2 (en)2008-04-182012-05-15Shell Oil CompanyHeater connections in mines and tunnels for use in treating subsurface hydrocarbon containing formations
US8752904B2 (en)2008-04-182014-06-17Shell Oil CompanyHeated fluid flow in mines and tunnels used in heating subsurface hydrocarbon containing formations
US8172335B2 (en)2008-04-182012-05-08Shell Oil CompanyElectrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations
US8562078B2 (en)2008-04-182013-10-22Shell Oil CompanyHydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations
US8162405B2 (en)2008-04-182012-04-24Shell Oil CompanyUsing tunnels for treating subsurface hydrocarbon containing formations
US8151907B2 (en)2008-04-182012-04-10Shell Oil CompanyDual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations
US20090283257A1 (en)*2008-05-182009-11-19Bj Services CompanyRadio and microwave treatment of oil wells
US9022118B2 (en)2008-10-132015-05-05Shell Oil CompanyDouble insulated heaters for treating subsurface formations
US8353347B2 (en)2008-10-132013-01-15Shell Oil CompanyDeployment of insulated conductors for treating subsurface formations
US8256512B2 (en)2008-10-132012-09-04Shell Oil CompanyMovable heaters for treating subsurface hydrocarbon containing formations
US8881806B2 (en)2008-10-132014-11-11Shell Oil CompanySystems and methods for treating a subsurface formation with electrical conductors
US9051829B2 (en)2008-10-132015-06-09Shell Oil CompanyPerforated electrical conductors for treating subsurface formations
US8220539B2 (en)2008-10-132012-07-17Shell Oil CompanyControlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation
US8281861B2 (en)2008-10-132012-10-09Shell Oil CompanyCirculated heated transfer fluid heating of subsurface hydrocarbon formations
US8267185B2 (en)2008-10-132012-09-18Shell Oil CompanyCirculated heated transfer fluid systems used to treat a subsurface formation
US8267170B2 (en)2008-10-132012-09-18Shell Oil CompanyOffset barrier wells in subsurface formations
US8261832B2 (en)2008-10-132012-09-11Shell Oil CompanyHeating subsurface formations with fluids
US9129728B2 (en)2008-10-132015-09-08Shell Oil CompanySystems and methods of forming subsurface wellbores
US8327932B2 (en)2009-04-102012-12-11Shell Oil CompanyRecovering energy from a subsurface formation
US8851170B2 (en)2009-04-102014-10-07Shell Oil CompanyHeater assisted fluid treatment of a subsurface formation
US8448707B2 (en)2009-04-102013-05-28Shell Oil CompanyNon-conducting heater casings
US8434555B2 (en)2009-04-102013-05-07Shell Oil CompanyIrregular pattern treatment of a subsurface formation
US20110134958A1 (en)*2009-10-092011-06-09Dhruv AroraMethods for assessing a temperature in a subsurface formation
US8485847B2 (en)2009-10-092013-07-16Shell Oil CompanyPress-fit coupling joint for joining insulated conductors
US20110132661A1 (en)*2009-10-092011-06-09Patrick Silas HarmasonParallelogram coupling joint for coupling insulated conductors
US9466896B2 (en)2009-10-092016-10-11Shell Oil CompanyParallelogram coupling joint for coupling insulated conductors
US8356935B2 (en)2009-10-092013-01-22Shell Oil CompanyMethods for assessing a temperature in a subsurface formation
US20110124228A1 (en)*2009-10-092011-05-26John Matthew ColesCompacted coupling joint for coupling insulated conductors
US20110124223A1 (en)*2009-10-092011-05-26David Jon TilleyPress-fit coupling joint for joining insulated conductors
US8816203B2 (en)2009-10-092014-08-26Shell Oil CompanyCompacted coupling joint for coupling insulated conductors
US8257112B2 (en)2009-10-092012-09-04Shell Oil CompanyPress-fit coupling joint for joining insulated conductors
US8739874B2 (en)2010-04-092014-06-03Shell Oil CompanyMethods for heating with slots in hydrocarbon formations
US9399905B2 (en)2010-04-092016-07-26Shell Oil CompanyLeak detection in circulated fluid systems for heating subsurface formations
US8833453B2 (en)2010-04-092014-09-16Shell Oil CompanyElectrodes for electrical current flow heating of subsurface formations with tapered copper thickness
US8820406B2 (en)2010-04-092014-09-02Shell Oil CompanyElectrodes for electrical current flow heating of subsurface formations with conductive material in wellbore
US8859942B2 (en)2010-04-092014-10-14Shell Oil CompanyInsulating blocks and methods for installation in insulated conductor heaters
US8485256B2 (en)2010-04-092013-07-16Shell Oil CompanyVariable thickness insulated conductors
US8939207B2 (en)2010-04-092015-01-27Shell Oil CompanyInsulated conductor heaters with semiconductor layers
US8502120B2 (en)2010-04-092013-08-06Shell Oil CompanyInsulating blocks and methods for installation in insulated conductor heaters
US8967259B2 (en)2010-04-092015-03-03Shell Oil CompanyHelical winding of insulated conductor heaters for installation
US9127523B2 (en)2010-04-092015-09-08Shell Oil CompanyBarrier methods for use in subsurface hydrocarbon formations
US9022109B2 (en)2010-04-092015-05-05Shell Oil CompanyLeak detection in circulated fluid systems for heating subsurface formations
US8701769B2 (en)2010-04-092014-04-22Shell Oil CompanyMethods for treating hydrocarbon formations based on geology
US9033042B2 (en)2010-04-092015-05-19Shell Oil CompanyForming bitumen barriers in subsurface hydrocarbon formations
US9127538B2 (en)2010-04-092015-09-08Shell Oil CompanyMethodologies for treatment of hydrocarbon formations using staged pyrolyzation
US8701768B2 (en)2010-04-092014-04-22Shell Oil CompanyMethods for treating hydrocarbon formations
US8631866B2 (en)2010-04-092014-01-21Shell Oil CompanyLeak detection in circulated fluid systems for heating subsurface formations
US9337550B2 (en)2010-10-082016-05-10Shell Oil CompanyEnd termination for three-phase insulated conductors
US8943686B2 (en)2010-10-082015-02-03Shell Oil CompanyCompaction of electrical insulation for joining insulated conductors
US8857051B2 (en)2010-10-082014-10-14Shell Oil CompanySystem and method for coupling lead-in conductor to insulated conductor
US9755415B2 (en)2010-10-082017-09-05Shell Oil CompanyEnd termination for three-phase insulated conductors
US8586866B2 (en)2010-10-082013-11-19Shell Oil CompanyHydroformed splice for insulated conductors
US8586867B2 (en)2010-10-082013-11-19Shell Oil CompanyEnd termination for three-phase insulated conductors
US8732946B2 (en)2010-10-082014-05-27Shell Oil CompanyMechanical compaction of insulator for insulated conductor splices
US9016370B2 (en)2011-04-082015-04-28Shell Oil CompanyPartial solution mining of hydrocarbon containing layers prior to in situ heat treatment
US9048653B2 (en)2011-04-082015-06-02Shell Oil CompanySystems for joining insulated conductors
US9309755B2 (en)2011-10-072016-04-12Shell Oil CompanyThermal expansion accommodation for circulated fluid systems used to heat subsurface formations
US9080917B2 (en)2011-10-072015-07-14Shell Oil CompanySystem and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor
US9080409B2 (en)2011-10-072015-07-14Shell Oil CompanyIntegral splice for insulated conductors
US9226341B2 (en)2011-10-072015-12-29Shell Oil CompanyForming insulated conductors using a final reduction step after heat treating
US10047594B2 (en)2012-01-232018-08-14Genie Ip B.V.Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation
US11142681B2 (en)2017-06-292021-10-12Exxonmobil Upstream Research CompanyChasing solvent for enhanced recovery processes
US10487636B2 (en)2017-07-272019-11-26Exxonmobil Upstream Research CompanyEnhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US11002123B2 (en)2017-08-312021-05-11Exxonmobil Upstream Research CompanyThermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US11261725B2 (en)2017-10-242022-03-01Exxonmobil Upstream Research CompanySystems and methods for estimating and controlling liquid level using periodic shut-ins
US10941644B2 (en)2018-02-202021-03-09Saudi Arabian Oil CompanyDownhole well integrity reconstruction in the hydrocarbon industry
US11624251B2 (en)2018-02-202023-04-11Saudi Arabian Oil CompanyDownhole well integrity reconstruction in the hydrocarbon industry
US12326056B2 (en)2018-02-202025-06-10Saudi Arabian Oil CompanyDownhole well integrity reconstruction in the hydrocarbon industry
US10641079B2 (en)2018-05-082020-05-05Saudi Arabian Oil CompanySolidifying filler material for well-integrity issues
US11187068B2 (en)2019-01-312021-11-30Saudi Arabian Oil CompanyDownhole tools for controlled fracture initiation and stimulation
US11125075B1 (en)2020-03-252021-09-21Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11280178B2 (en)2020-03-252022-03-22Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11414963B2 (en)2020-03-252022-08-16Saudi Arabian Oil CompanyWellbore fluid level monitoring system
US11414985B2 (en)2020-05-282022-08-16Saudi Arabian Oil CompanyMeasuring wellbore cross-sections using downhole caliper tools
US11414984B2 (en)2020-05-282022-08-16Saudi Arabian Oil CompanyMeasuring wellbore cross-sections using downhole caliper tools
US12166168B2 (en)2020-06-022024-12-10Saudi Arabian Oil CompanyElectrolyte structure for a high-temperature, high-pressure lithium battery
US11631884B2 (en)2020-06-022023-04-18Saudi Arabian Oil CompanyElectrolyte structure for a high-temperature, high-pressure lithium battery
US11421497B2 (en)2020-06-032022-08-23Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11391104B2 (en)2020-06-032022-07-19Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11719063B2 (en)2020-06-032023-08-08Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11149510B1 (en)2020-06-032021-10-19Saudi Arabian Oil CompanyFreeing a stuck pipe from a wellbore
US11719089B2 (en)2020-07-152023-08-08Saudi Arabian Oil CompanyAnalysis of drilling slurry solids by image processing
US11255130B2 (en)2020-07-222022-02-22Saudi Arabian Oil CompanySensing drill bit wear under downhole conditions
US11506044B2 (en)2020-07-232022-11-22Saudi Arabian Oil CompanyAutomatic analysis of drill string dynamics
US11867008B2 (en)2020-11-052024-01-09Saudi Arabian Oil CompanySystem and methods for the measurement of drilling mud flow in real-time
US11434714B2 (en)2021-01-042022-09-06Saudi Arabian Oil CompanyAdjustable seal for sealing a fluid flow at a wellhead
US11697991B2 (en)2021-01-132023-07-11Saudi Arabian Oil CompanyRig sensor testing and calibration
US11572752B2 (en)2021-02-242023-02-07Saudi Arabian Oil CompanyDownhole cable deployment
US11727555B2 (en)2021-02-252023-08-15Saudi Arabian Oil CompanyRig power system efficiency optimization through image processing
US11846151B2 (en)2021-03-092023-12-19Saudi Arabian Oil CompanyRepairing a cased wellbore
US11725504B2 (en)2021-05-242023-08-15Saudi Arabian Oil CompanyContactless real-time 3D mapping of surface equipment
US11619097B2 (en)2021-05-242023-04-04Saudi Arabian Oil CompanySystem and method for laser downhole extended sensing
US11624265B1 (en)2021-11-122023-04-11Saudi Arabian Oil CompanyCutting pipes in wellbores using downhole autonomous jet cutting tools
US11867012B2 (en)2021-12-062024-01-09Saudi Arabian Oil CompanyGauge cutter and sampler apparatus
US11954800B2 (en)2021-12-142024-04-09Saudi Arabian Oil CompanyConverting borehole images into three dimensional structures for numerical modeling and simulation applications
US11739616B1 (en)2022-06-022023-08-29Saudi Arabian Oil CompanyForming perforation tunnels in a subterranean formation
US12203366B2 (en)2023-05-022025-01-21Saudi Arabian Oil CompanyCollecting samples from wellbores

Similar Documents

PublicationPublication DateTitle
US3547192A (en)Method of metal coating and electrically heating a subterranean earth formation
US3211220A (en)Single well subsurface electrification process
US3862662A (en)Method and apparatus for electrical heating of hydrocarbonaceous formations
US3642066A (en)Electrical method and apparatus for the recovery of oil
US3547193A (en)Method and apparatus for recovery of minerals from sub-surface formations using electricity
US4401162A (en)In situ oil shale process
US4730671A (en)Viscous oil recovery using high electrical conductive layers
US5046559A (en)Method and apparatus for producing hydrocarbon bearing deposits in formations having shale layers
US2801090A (en)Sulfur mining using heating by electrolysis
US4415034A (en)Electrode well completion
US4662438A (en)Method and apparatus for enhancing liquid hydrocarbon production from a single borehole in a slowly producing formation by non-uniform heating through optimized electrode arrays surrounding the borehole
US3948319A (en)Method and apparatus for producing fluid by varying current flow through subterranean source formation
US4926941A (en)Method of producing tar sand deposits containing conductive layers
US5060726A (en)Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication
US3692111A (en)Stair-step thermal recovery of oil
US3417823A (en)Well treating process using electroosmosis
US5042579A (en)Method and apparatus for producing tar sand deposits containing conductive layers
US5620049A (en)Method for increasing the production of petroleum from a subterranean formation penetrated by a wellbore
US3848671A (en)Method of producing bitumen from a subterranean tar sand formation
US4199025A (en)Method and apparatus for tertiary recovery of oil
US4484627A (en)Well completion for electrical power transmission
US3105545A (en)Method of heating underground formations
US4817717A (en)Hydraulic fracturing with a refractory proppant for sand control
US3614986A (en)Method for injecting heated fluids into mineral bearing formations
US3916993A (en)Method of producing natural gas from a subterranean formation

[8]ページ先頭

©2009-2025 Movatter.jp