Movatterモバイル変換


[0]ホーム

URL:


US20130043025A1 - Harvesting resource from variable pay intervals - Google Patents

Harvesting resource from variable pay intervals
Download PDF

Info

Publication number
US20130043025A1
US20130043025A1US13/557,821US201213557821AUS2013043025A1US 20130043025 A1US20130043025 A1US 20130043025A1US 201213557821 AUS201213557821 AUS 201213557821AUS 2013043025 A1US2013043025 A1US 2013043025A1
Authority
US
United States
Prior art keywords
well
production
reservoir
production well
liner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US13/557,821
Inventor
George R. Scott
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
ExxonMobil Upstream Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ExxonMobil Upstream Research CofiledCriticalExxonMobil Upstream Research Co
Publication of US20130043025A1publicationCriticalpatent/US20130043025A1/en
Assigned to EXXONMOBIL UPSTREAM RESEARCH COMPANYreassignmentEXXONMOBIL UPSTREAM RESEARCH COMPANYASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS).Assignors: IMPERIAL OIL RESOURCES LIMITED
Assigned to IMPERIAL OIL RESOURCES LIMITEDreassignmentIMPERIAL OIL RESOURCES LIMITEDASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS).Assignors: SCOTT, GEORGE R.
Abandonedlegal-statusCriticalCurrent

Links

Images

Classifications

Definitions

Landscapes

Abstract

A method is provided for drilling a well in a reservoir. The method includes planning a well trajectory for a serpentine well pair. The production well is drilled using lateral displacements and vertical displacements to follow a base of a pay interval in the reservoir. The production well is completed with perforations in regions comprising a hydrocarbon. At least a portion of the production well includes a liner with no perforations.

Description

Claims (21)

US13/557,8212011-08-172012-07-25Harvesting resource from variable pay intervalsAbandonedUS20130043025A1 (en)

Applications Claiming Priority (2)

Application NumberPriority DateFiling DateTitle
CA2,749,4372011-08-17
CA2749437ACA2749437C (en)2011-08-172011-08-17Harvesting resource from variable pay intervals

Publications (1)

Publication NumberPublication Date
US20130043025A1true US20130043025A1 (en)2013-02-21

Family

ID=47711801

Family Applications (1)

Application NumberTitlePriority DateFiling Date
US13/557,821AbandonedUS20130043025A1 (en)2011-08-172012-07-25Harvesting resource from variable pay intervals

Country Status (2)

CountryLink
US (1)US20130043025A1 (en)
CA (1)CA2749437C (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20150167433A1 (en)*2013-12-182015-06-18Schlumberger Technology CorporationProximity calculation in a geoscience domain
US9091159B2 (en)2011-12-082015-07-28Fccl PartnershipProcess and well arrangement for hydrocarbon recovery from bypassed pay or a region near the reservoir base
US10294774B2 (en)2013-06-122019-05-21Schlumberger Technology CorporationWell trajectory planning using bounding box scan for anti-collision analysis
US10365387B1 (en)*2018-01-082019-07-30Dagang Oil Field Of CnpcMethod for secondary exploration of old oil area in fault subsidence basin
US10487636B2 (en)2017-07-272019-11-26Exxonmobil Upstream Research CompanyEnhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US10927654B2 (en)*2019-05-232021-02-23Saudi Arabian Oil CompanyRecovering hydrocarbons in multi-layer reservoirs with coiled tubing
US11002123B2 (en)2017-08-312021-05-11Exxonmobil Upstream Research CompanyThermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US11125026B2 (en)2018-10-242021-09-21Saudi Arabian Oil CompanyCompleting slim-hole horizontal wellbores
US11142681B2 (en)2017-06-292021-10-12Exxonmobil Upstream Research CompanyChasing solvent for enhanced recovery processes
US11261725B2 (en)2017-10-242022-03-01Exxonmobil Upstream Research CompanySystems and methods for estimating and controlling liquid level using periodic shut-ins
US11466554B2 (en)2018-03-202022-10-11QRI Group, LLCData-driven methods and systems for improving oil and gas drilling and completion processes
US11506052B1 (en)2018-06-262022-11-22QRI Group, LLCFramework and interface for assessing reservoir management competency

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US9638000B2 (en)2014-07-102017-05-02Inflow Systems Inc.Method and apparatus for controlling the flow of fluids into wellbore tubulars

Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4878539A (en)*1988-08-021989-11-07Anders Energy CorporationMethod and system for maintaining and producing horizontal well bores
US5690390A (en)*1996-04-191997-11-25Fmc CorporationProcess for solution mining underground evaporite ore formations such as trona
US6318464B1 (en)*1998-07-102001-11-20Vapex Technologies International, Inc.Vapor extraction of hydrocarbon deposits
US20100065268A1 (en)*2006-07-242010-03-18Uti Limited PartnershipIn situ heavy oil and bitumen recovery process
US20110229071A1 (en)*2009-04-222011-09-22Lxdata Inc.Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US20110272153A1 (en)*2009-01-292011-11-10Boone Thomas JMethod and System For Enhancing A Recovery Process Employing One or More Horizontal Wellbores
US20120193094A1 (en)*2010-09-102012-08-02Arthur John EMultiple infill wells within a gravity-dominated hydrocarbon recovery process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4878539A (en)*1988-08-021989-11-07Anders Energy CorporationMethod and system for maintaining and producing horizontal well bores
US5690390A (en)*1996-04-191997-11-25Fmc CorporationProcess for solution mining underground evaporite ore formations such as trona
US6318464B1 (en)*1998-07-102001-11-20Vapex Technologies International, Inc.Vapor extraction of hydrocarbon deposits
US20100065268A1 (en)*2006-07-242010-03-18Uti Limited PartnershipIn situ heavy oil and bitumen recovery process
US20110272153A1 (en)*2009-01-292011-11-10Boone Thomas JMethod and System For Enhancing A Recovery Process Employing One or More Horizontal Wellbores
US20110229071A1 (en)*2009-04-222011-09-22Lxdata Inc.Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
US20120193094A1 (en)*2010-09-102012-08-02Arthur John EMultiple infill wells within a gravity-dominated hydrocarbon recovery process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Burinda, Christine, Jason Pitcher, and Dennis Lee. "Geosteering Techniques in Thin Coal Reservoirs." Frontiers Innovation (2009). Web.*

Cited By (13)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US9091159B2 (en)2011-12-082015-07-28Fccl PartnershipProcess and well arrangement for hydrocarbon recovery from bypassed pay or a region near the reservoir base
US10294774B2 (en)2013-06-122019-05-21Schlumberger Technology CorporationWell trajectory planning using bounding box scan for anti-collision analysis
US20150167433A1 (en)*2013-12-182015-06-18Schlumberger Technology CorporationProximity calculation in a geoscience domain
US9745842B2 (en)*2013-12-182017-08-29Schlumberger Technology CorporationProximity calculation in a geoscience domain
US11142681B2 (en)2017-06-292021-10-12Exxonmobil Upstream Research CompanyChasing solvent for enhanced recovery processes
US10487636B2 (en)2017-07-272019-11-26Exxonmobil Upstream Research CompanyEnhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes
US11002123B2 (en)2017-08-312021-05-11Exxonmobil Upstream Research CompanyThermal recovery methods for recovering viscous hydrocarbons from a subterranean formation
US11261725B2 (en)2017-10-242022-03-01Exxonmobil Upstream Research CompanySystems and methods for estimating and controlling liquid level using periodic shut-ins
US10365387B1 (en)*2018-01-082019-07-30Dagang Oil Field Of CnpcMethod for secondary exploration of old oil area in fault subsidence basin
US11466554B2 (en)2018-03-202022-10-11QRI Group, LLCData-driven methods and systems for improving oil and gas drilling and completion processes
US11506052B1 (en)2018-06-262022-11-22QRI Group, LLCFramework and interface for assessing reservoir management competency
US11125026B2 (en)2018-10-242021-09-21Saudi Arabian Oil CompanyCompleting slim-hole horizontal wellbores
US10927654B2 (en)*2019-05-232021-02-23Saudi Arabian Oil CompanyRecovering hydrocarbons in multi-layer reservoirs with coiled tubing

Also Published As

Publication numberPublication date
CA2749437C (en)2018-11-27
CA2749437A1 (en)2013-02-17

Similar Documents

PublicationPublication DateTitle
CA2749437C (en)Harvesting resource from variable pay intervals
CA2740158C (en)Harvesting by-passed resource
US7621326B2 (en)Petroleum extraction from hydrocarbon formations
US7422063B2 (en)Hydrocarbon recovery from subterranean formations
CA2756389C (en)Improving recovery from a hydrocarbon reservoir
CA2913140C (en)Radial fishbone sagd
CA2766838C (en)Enhancing the start-up of resource recovery processes
US20170175506A1 (en)Pressure Assisted Oil Recovery
US8408313B2 (en)Methods for application of reservoir conditioning in petroleum reservoirs
CA2744749C (en)Basal planer gravity drainage
CA2766844C (en)Heating a hydrocarbon reservoir
CA2744767C (en)Dual mobilizing agents in basal planar gravity drainage
CA2766849C (en)Recovery from a hydrocarbon reservoir utilizing a mixture of steam and a volatile solvent
CA2762439C (en)Improving recovery from a hydrocarbon reservoir
US8770289B2 (en)Method and system for lifting fluids from a reservoir
CA2762448C (en)Improving recovery from a hydrocarbon reservoir
CA3010530C (en)Single well cross steam and gravity drainage (sw-xsagd)
CA2847759C (en)A method of enhancing resource recovery from subterranean reservoirs
CA2545505A1 (en)Petroleum extraction from hydrocarbon formations
CA2549784A1 (en)Hydrocarbon recovery from subterranean formations

Legal Events

DateCodeTitleDescription
ASAssignment

Owner name:EXXONMOBIL UPSTREAM RESEARCH COMPANY, TEXAS

Free format text:ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:IMPERIAL OIL RESOURCES LIMITED;REEL/FRAME:030973/0770

Effective date:20111031

ASAssignment

Owner name:IMPERIAL OIL RESOURCES LIMITED, CANADA

Free format text:ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SCOTT, GEORGE R.;REEL/FRAME:038172/0799

Effective date:20111021

STCBInformation on status: application discontinuation

Free format text:ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION


[8]ページ先頭

©2009-2025 Movatter.jp