Movatterモバイル変換


[0]ホーム

URL:


US20040129428A1 - Plunger lift deliquefying system for increased recovery from oil and gas wells - Google Patents

Plunger lift deliquefying system for increased recovery from oil and gas wells
Download PDF

Info

Publication number
US20040129428A1
US20040129428A1US10/738,528US73852803AUS2004129428A1US 20040129428 A1US20040129428 A1US 20040129428A1US 73852803 AUS73852803 AUS 73852803AUS 2004129428 A1US2004129428 A1US 2004129428A1
Authority
US
United States
Prior art keywords
gas
liquid
formation
pressure
wellbore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/738,528
Inventor
Terry Kelley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to US10/738,528priorityCriticalpatent/US20040129428A1/en
Publication of US20040129428A1publicationCriticalpatent/US20040129428A1/en
Abandonedlegal-statusCriticalCurrent

Links

Images

Classifications

Definitions

Landscapes

Abstract

This invention provides a method to efficiently remove liquids—hydrocarbons or water—from a natural producing formation so as to reduce the resistance to gas inflow to the wellbore from the formation. The system will also serve as an efficient mechanism for producing hydrocarbon liquids by operating at a higher wellbore and near-wellbore formation pressure to maintain such liquids in a state of increased mobility due to the retained gas in solution. The system used is a downhole device containing a float-operated valve, said float being sensitive to fluid filling its interior such that it falls with liquid fill, opening a valve to the production tubing string liquids are allowed into the production tubing, while gas is produced up the tubing-casing annulus. A unique combination of artificial lift is incorporated in the tubing string, basically a plunger lift operated by one or more gas lift valves that open when a prescribed column of liquid is sensed above the valve. A venturi-type nozzle above the gas lift valve acts to disperse the gas bubbles to create a more efficient fluid slug to lift the plunger to surface.

Description

Claims (9)

What is claimed is:
1. A method of increasing production and ultimate recovery of gaseous and liquid hydrocarbons from one or more downhole natural gas baring formations and through a production tubing string within a wellbore by complete removal of liquids from the wellbore and utilizing gas pressure drive of a natural gas baring formation, the method comprising:
the wellbore being perforated for liquid and gaseous hydrocarbon production in a gas baring formation;
providing a surface gas flow pressure regulator and a surface pressure gauge on the casing well head annulus exit port for respectively regulating gas flow production and measuring pressure white maintaining a predetermined flow pressure on the wellbore annulus;
positioning a downhole shrouded cover injector at the bottom of a production tubing string relative to the opened formation;
passing formation fluids through the downhole injector by pressure differential and through the production tubing string toward the surface while preventing formation gases from entering the production tubing string;
positioning a plunger lift within a production tubing string above the injector for lifting liquids to the surface;
positioning one or more fluid operated gas lift valves for lifting liquid to the surface by gas injection into the tubing string below the plunger lift;
plunger lifting liquid inflow efficiently by maintaining a gas fluid interface between plunger and liquid through the production tubing string to the surface of the well; and
maintaining direct fluid communication between the wellbore and the opened gas baring formation and liquids entering from the lower part of the formation, such that such gas pressure acts as a cap on the formation fluids in the opened formation to force the fluids out of the formation into the wellbore through the injector and toward the surface.
2. The method as defined inclaim 1, further comprising:
wherein the downhole injector is positioned relative to the lowest downhole opened gas baring formation in the wellbore so that all incoming liquid hydrocarbons and invading waters are efficiently and completely removed from the wellbore into the lower pressure production tubing string on to the surface thereby considerably increasing gaseous and liquid hydrocarbon recovery.
3. The method as defined inclaim 1, further comprising:
continually and comparatively measuring and monitoring the formation gas flow production, pressure and related recovery for the most effective optimum gas flow pressure at the wells surface gas flow meter and periodically making and observing fluid level and gas-oil ratio test, while continually and comparatively measuring and monitoring the production and recovery of formation liquids through a surface metering facility for a combined total maximum gaseous and liquid hydrocarbon production and ultimate recovery throughout the reservoir's formations total gaseous and liquid hydrocarbon recovery life for maximum hydrocarbon reserve value.
4. The method as defined inclaim 1, further comprising:
while recovering formation liquids at the surface production tubing string discharge, simultaneously flowing formation gas production and pressure at a regulated and controlled predetermined gas flow pressure at the surface gas flow pressure regulator with the surface gas pressure gauge to retain an optimum formation gas pressure in an annulus about the production tubing string, and thereby on and within all opened hydrocarbon formations, such that the gas pressure prevents solution gas within the liquid hydrocarbon in its formation and the wellbore from breaking out of solution, thereby maintaining its expulsive force, high mobility and low viscosity, and acts as a driving force to pass pressured higher pressure hydrostatic head liquids out of the formation and through the injector by pressure differential on up into the lower pressure production tubing string to recover formation liquids at the surface, wherein total in place liquid hydrocarbons are maintained highly fluid and recoverable, thereby increasing related liquid hydrocarbon reserve value.
5. The method as defined inclaim 1, further comprising:
maintaining a predetermined optimum formation gas flow pressure in the wellbore annulus such that gas pressure acts as a driving force on all liquid hydrocarbons and invading waters to pass them through the injector by pressure differential into the lower pressure production tubing string for formation fluid recovery at the surface, so that a liquid level is maintained in the wellbore at the injector liquid in take level for maximum free gas and pressurized fluid flow from all opened hydrocarbon formations for maximum gaseous and liquid hydrocarbon recovery, whereby total gaseous and liquid hydrocarbon reserve recoverability and related value is increased.
6. The method as defined inclaim 1, further comprising:
maintaining a wellbore gas pressure in the annulus above the downhole injector intake liquid level as a driving force to maintain a predetermined liquid level in the lower pressure production tubing string for maximum plunger lift or other artificial lift efficiency of incoming liquids on to the surface.
7. The method as defined inclaim 1, further comprising:
positioning a check valve within a production tubing string above the top of the injector for preventing fluids which pass by the check valve from returning to the injector; and
the injector housing having a nominal outer diameter, a fluid responsive float open at the top and closed at the bottom and moveable with respect to the injector housing as a function of fluid density surrounding the float, and a shut off valve member moveably responsive to the float for engagement with a shut off valve seat, the shut off valve member being spaced vertically below inside the injector housing from the check valve.
8. The method as defined inclaim 1, further comprising:
providing in high formation sand influx wells a sleeve-shaped filter screen across an inlet flow port at the top of the liquid injector for restricting at least 90% of solid particles 30 microns or greater from passing through the filter screen, accumulating and closing the injector outer housing at the bottom.
9. The method as defined inclaim 4, further comprising:
providing the surface gas flow pressure regulator for controlling gas flow from the wellbore annulus at the well head exit port throughout the complete production and total recovery of all in place liquid hydrocarbons until said production and recovery considerably declines, at such time converting over to maximum gas production by releasing the surface gas flow pressure to a lower predetermined optimum or open flow pressure at the surface gas flow regulator, to efficiently produce and recover natural gas white efficiently removing any incoming invading waters in the wellbore, whereby total in place liquid hydrocarbons have been recovered, leaving only the small quantities that stick to the formation rock pores as a thin film, and that are isolated in any formation structural traps, wherein total in place gas is free to flow to the surface for total in place natural gas production and recovery, thereby recovering total in place liquid and gaseous hydrocarbons maintained and converted by this recovery process to be ultimately recoverable.
US10/738,5282002-12-202003-12-16Plunger lift deliquefying system for increased recovery from oil and gas wellsAbandonedUS20040129428A1 (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
US10/738,528US20040129428A1 (en)2002-12-202003-12-16Plunger lift deliquefying system for increased recovery from oil and gas wells

Applications Claiming Priority (2)

Application NumberPriority DateFiling DateTitle
US43464302P2002-12-202002-12-20
US10/738,528US20040129428A1 (en)2002-12-202003-12-16Plunger lift deliquefying system for increased recovery from oil and gas wells

Publications (1)

Publication NumberPublication Date
US20040129428A1true US20040129428A1 (en)2004-07-08

Family

ID=32685325

Family Applications (1)

Application NumberTitlePriority DateFiling Date
US10/738,528AbandonedUS20040129428A1 (en)2002-12-202003-12-16Plunger lift deliquefying system for increased recovery from oil and gas wells

Country Status (1)

CountryLink
US (1)US20040129428A1 (en)

Cited By (54)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US20050194149A1 (en)*2004-03-032005-09-08Giacomino Jeffrey L.Thermal actuated plunger
US20050230120A1 (en)*2004-04-152005-10-20Victor Bruce MSand plunger
US20060124294A1 (en)*2004-12-102006-06-15Victor Bruce MInternal shock absorber bypass plunger
US20060124292A1 (en)*2004-12-102006-06-15Victor Bruce MInternal shock absorber plunger
US20070114023A1 (en)*2005-11-032007-05-24Roy Jude BGas lift flow surveillance device
US20070151738A1 (en)*2005-12-302007-07-05Giacomino Jeffrey LSlidable sleeve plunger
US20080110617A1 (en)*2004-02-182008-05-15Giacomino Jeffrey LMethod and Apparatus for Logging Downhole Data
US7383878B1 (en)2003-03-182008-06-10Production Control Services, Inc.Multi-part plunger
US7438125B2 (en)2004-04-202008-10-21Production Control Services, Inc.Variable orifice bypass plunger
US20090008101A1 (en)*2007-07-062009-01-08Coady Patrick TMethod of Producing a Low Pressure Well
US20090035067A1 (en)*2007-07-302009-02-05Baker Hughes IncorporatedGas Eduction Tube for Seabed Caisson Pump Assembly
US7513301B2 (en)2005-05-092009-04-07Production Control Services, Inc.Liquid aeration plunger
US20090211753A1 (en)*2008-02-272009-08-27Schlumberger Technology CorporationSystem and method for removing liquid from a gas well
US20100065280A1 (en)*2008-09-182010-03-18Baker Hughes Inc.Gas restrictor for horizontally oriented pump
US20110048696A1 (en)*2008-02-062011-03-03Statoil AsaGas-liquid separator
CN102797422A (en)*2012-07-192012-11-28中国石油天然气股份有限公司Coal bed gas well coal powder fishing, water draining and gas production integrated pipe column
US20130092373A1 (en)*2011-10-172013-04-18Chevron U.S.A. Inc.System, apparatus and method for deliquefying produced fluids from a well
RU2516313C2 (en)*2012-04-022014-05-20Общество с ограниченной ответственностью "Газпром добыча Надым" (ООО "Газпром добыча Надым")Device for reservoir fluid removal from gas well
CN104612636A (en)*2015-01-222015-05-13中国石油大学(华东)Automatic underground layer change device for oil well multilayer exploitation
EP2910731A1 (en)2014-02-242015-08-26Shell International Research Maatschappij B.V.Monitoring well effluent plunger lift operations
CN105971589A (en)*2016-06-012016-09-28中国地质大学(武汉)Coalbed methane downhole pressure detection device
EP2419602A4 (en)*2009-04-142017-07-12Danny T. WilliamsDownhole draw-down pump and method
WO2017166258A1 (en)*2016-04-012017-10-05深圳市樊溪电子有限公司Method for metering flow rate of two phases of gas and liquid in wet natural gas
US9816367B2 (en)2013-08-232017-11-14Chevron U.S.A. Inc.System, apparatus and method for well deliquification
US9890621B2 (en)2014-10-072018-02-13Pcs Ferguson, Inc.Two-piece plunger
US9915133B2 (en)2015-02-202018-03-13Flowco Production Solutions, LLCUnibody bypass plunger with centralized helix and crimple feature
CN108019189A (en)*2016-11-032018-05-11中国石油天然气股份有限公司Reducing plunger
CN108252685A (en)*2016-12-282018-07-06中国石油天然气股份有限公司Extension gas lift method of permanent well completion pipe string
CN108361006A (en)*2018-03-092018-08-03中国石油大学(华东)A kind of water drainage-gas recovery technology method using preset pneumatic type tubing string
US20180363429A1 (en)*2017-06-132018-12-20Heal Systems LpPlunger lift assembly
US10408026B2 (en)2013-08-232019-09-10Chevron U.S.A. Inc.System, apparatus, and method for well deliquification
CN110344818A (en)*2019-07-182019-10-18滨州学院Plunger lift well plunger uplink stage liquid slug batch tracing method
US10550674B2 (en)2018-03-062020-02-04Flowco Production Solutions, LLCInternal valve plunger
US10669824B2 (en)2015-02-202020-06-02Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US10677027B2 (en)2015-01-152020-06-09Flowco Production Solutions, LLCApparatus and method for securing end pieces to a mandrel
US10718327B2 (en)2015-05-182020-07-21Patriot Artificial Lift, LLCForged flange lubricator
CN112112626A (en)*2020-09-032020-12-22中国石油天然气集团有限公司Bottom hole pressure control method based on underground hydrocarbon detection
US10895128B2 (en)2019-05-222021-01-19Pcs Ferguson, Inc.Taper lock bypass plunger
US10907452B2 (en)2016-03-152021-02-02Patriot Artificial Lift, LLCWell plunger systems
CN112539047A (en)*2020-12-222021-03-23西安荣达石油工程有限公司Process pipe column capable of protecting oil-gas layer and realizing efficient gas lift liquid drainage and process
CN113417607A (en)*2021-08-052021-09-21北京中海沃邦能源投资有限公司石楼分公司Continuous pressure-increasing drainage and production equipment for low-pressure high-yield water well
US11187066B2 (en)2019-09-262021-11-30Saudi Arabian Oil CompanyLifting condensate from wellbores
US11187044B2 (en)2019-12-102021-11-30Saudi Arabian Oil CompanyProduction cavern
USD937982S1 (en)2019-05-292021-12-07Flowco Production Solutions, LLCApparatus for a plunger system
US20220056785A1 (en)*2018-09-132022-02-24Flowco Production Solutions, LLCUnibody bypass plunger with integral dart valve cage
US11293267B2 (en)2018-11-302022-04-05Flowco Production Solutions, LLCApparatuses and methods for scraping
US11326424B2 (en)*2015-01-152022-05-10Flowco Production Solutions, LLCApparatus and method for securing end pieces to a mandrel
US20220145736A1 (en)*2015-02-202022-05-12Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US20220275712A1 (en)*2015-02-202022-09-01Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US11448049B2 (en)2019-09-052022-09-20Flowco Production Solutions, LLCGas assisted plunger lift control system and method
US11460330B2 (en)2020-07-062022-10-04Saudi Arabian Oil CompanyReducing noise in a vortex flow meter
CN116006138A (en)*2023-02-092023-04-25西安利都仪表测控设备有限公司Oil extraction system of plunger gas lift device
CN116163688A (en)*2023-04-262023-05-26山东成林石油工程技术有限公司Device for exploiting oil gas by gas-water relay jet flow and application method
CN116201507A (en)*2021-11-302023-06-02中国石油天然气股份有限公司 Gas well suction and drainage system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4417858A (en)*1981-06-291983-11-29Otis Engineering CorporationPlunger lift control
US5217067A (en)*1991-07-301993-06-08Robert LandryApparatus for increasing flow in oil and other wells
US6089322A (en)*1996-12-022000-07-18Kelley & Sons Group International, Inc.Method and apparatus for increasing fluid recovery from a subterranean formation
US6705404B2 (en)*2001-09-102004-03-16Gordon F. BosleyOpen well plunger-actuated gas lift valve and method of use

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US4417858A (en)*1981-06-291983-11-29Otis Engineering CorporationPlunger lift control
US5217067A (en)*1991-07-301993-06-08Robert LandryApparatus for increasing flow in oil and other wells
US6089322A (en)*1996-12-022000-07-18Kelley & Sons Group International, Inc.Method and apparatus for increasing fluid recovery from a subterranean formation
US6705404B2 (en)*2001-09-102004-03-16Gordon F. BosleyOpen well plunger-actuated gas lift valve and method of use

Cited By (78)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US7383878B1 (en)2003-03-182008-06-10Production Control Services, Inc.Multi-part plunger
US7690425B2 (en)2004-02-182010-04-06Production Control Services, Inc.Data logger plunger and method for its use
US20080110617A1 (en)*2004-02-182008-05-15Giacomino Jeffrey LMethod and Apparatus for Logging Downhole Data
US7597143B2 (en)2004-02-182009-10-06Production Control Services, Inc.Method and apparatus for logging downhole data
US7328748B2 (en)2004-03-032008-02-12Production Control Services, Inc.Thermal actuated plunger
US20050194149A1 (en)*2004-03-032005-09-08Giacomino Jeffrey L.Thermal actuated plunger
US20050230120A1 (en)*2004-04-152005-10-20Victor Bruce MSand plunger
US7475731B2 (en)2004-04-152009-01-13Production Control Services, Inc.Sand plunger
US7438125B2 (en)2004-04-202008-10-21Production Control Services, Inc.Variable orifice bypass plunger
US7290602B2 (en)2004-12-102007-11-06Production Control Services, Inc.Internal shock absorber bypass plunger
US20060124292A1 (en)*2004-12-102006-06-15Victor Bruce MInternal shock absorber plunger
US20060124294A1 (en)*2004-12-102006-06-15Victor Bruce MInternal shock absorber bypass plunger
US7523783B2 (en)2004-12-102009-04-28Production Control Services, Inc.Internal shock absorber plunger
US7513301B2 (en)2005-05-092009-04-07Production Control Services, Inc.Liquid aeration plunger
US20070114023A1 (en)*2005-11-032007-05-24Roy Jude BGas lift flow surveillance device
US7389684B2 (en)2005-11-032008-06-24Roy Jude BGas lift flow surveillance device
US20070151738A1 (en)*2005-12-302007-07-05Giacomino Jeffrey LSlidable sleeve plunger
US7314080B2 (en)2005-12-302008-01-01Production Control Services, Inc.Slidable sleeve plunger
US20090008101A1 (en)*2007-07-062009-01-08Coady Patrick TMethod of Producing a Low Pressure Well
US20090035067A1 (en)*2007-07-302009-02-05Baker Hughes IncorporatedGas Eduction Tube for Seabed Caisson Pump Assembly
US7882896B2 (en)*2007-07-302011-02-08Baker Hughes IncorporatedGas eduction tube for seabed caisson pump assembly
US20110048696A1 (en)*2008-02-062011-03-03Statoil AsaGas-liquid separator
US20090211753A1 (en)*2008-02-272009-08-27Schlumberger Technology CorporationSystem and method for removing liquid from a gas well
GB2457788A (en)*2008-02-272009-09-02Schlumberger HoldingsSystem and method for removing liquid from a gas well
GB2457788B (en)*2008-02-272010-09-22Schlumberger HoldingsMethod for removing liquid from a gas well
US20100065280A1 (en)*2008-09-182010-03-18Baker Hughes Inc.Gas restrictor for horizontally oriented pump
US7921908B2 (en)2008-09-182011-04-12Baker Hughes IncorporatedGas restrictor for horizontally oriented pump
EP2419602A4 (en)*2009-04-142017-07-12Danny T. WilliamsDownhole draw-down pump and method
US9062538B2 (en)*2011-10-172015-06-23Chevron U.S.A. Inc.System, apparatus and method for deliquefying produced fluids from a well
US20130092373A1 (en)*2011-10-172013-04-18Chevron U.S.A. Inc.System, apparatus and method for deliquefying produced fluids from a well
RU2516313C2 (en)*2012-04-022014-05-20Общество с ограниченной ответственностью "Газпром добыча Надым" (ООО "Газпром добыча Надым")Device for reservoir fluid removal from gas well
CN102797422A (en)*2012-07-192012-11-28中国石油天然气股份有限公司Coal bed gas well coal powder fishing, water draining and gas production integrated pipe column
US10408026B2 (en)2013-08-232019-09-10Chevron U.S.A. Inc.System, apparatus, and method for well deliquification
US9816367B2 (en)2013-08-232017-11-14Chevron U.S.A. Inc.System, apparatus and method for well deliquification
EP2910731A1 (en)2014-02-242015-08-26Shell International Research Maatschappij B.V.Monitoring well effluent plunger lift operations
WO2015127336A1 (en)2014-02-242015-08-27Shell Oil CompanyMonitoring well effluent plunger lift operations
US9890621B2 (en)2014-10-072018-02-13Pcs Ferguson, Inc.Two-piece plunger
US11326424B2 (en)*2015-01-152022-05-10Flowco Production Solutions, LLCApparatus and method for securing end pieces to a mandrel
US10677027B2 (en)2015-01-152020-06-09Flowco Production Solutions, LLCApparatus and method for securing end pieces to a mandrel
CN104612636A (en)*2015-01-222015-05-13中国石油大学(华东)Automatic underground layer change device for oil well multilayer exploitation
US20220145736A1 (en)*2015-02-202022-05-12Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US11105189B2 (en)*2015-02-202021-08-31Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US11578570B2 (en)*2015-02-202023-02-14Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US11530599B2 (en)*2015-02-202022-12-20Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US11434733B2 (en)*2015-02-202022-09-06Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US10273789B2 (en)2015-02-202019-04-30Flowco Production Solutions, LLCDart valves for bypass plungers
US20190218896A1 (en)*2015-02-202019-07-18Flowco Production Solutions, LLCUnibody bypass plunger and valve cage
US9963957B2 (en)2015-02-202018-05-08Flowco Production Solutions, LLCClutch assembly for bypass plungers
US20220275712A1 (en)*2015-02-202022-09-01Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US11401789B2 (en)2015-02-202022-08-02Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US10669824B2 (en)2015-02-202020-06-02Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US9915133B2 (en)2015-02-202018-03-13Flowco Production Solutions, LLCUnibody bypass plunger with centralized helix and crimple feature
US10907453B2 (en)*2015-02-202021-02-02Flowco Production Solutions, LLCUnibody bypass plunger and valve cage with sealable ports
US10718327B2 (en)2015-05-182020-07-21Patriot Artificial Lift, LLCForged flange lubricator
US10907452B2 (en)2016-03-152021-02-02Patriot Artificial Lift, LLCWell plunger systems
WO2017166258A1 (en)*2016-04-012017-10-05深圳市樊溪电子有限公司Method for metering flow rate of two phases of gas and liquid in wet natural gas
CN105971589A (en)*2016-06-012016-09-28中国地质大学(武汉)Coalbed methane downhole pressure detection device
CN108019189A (en)*2016-11-032018-05-11中国石油天然气股份有限公司Reducing plunger
CN108252685A (en)*2016-12-282018-07-06中国石油天然气股份有限公司Extension gas lift method of permanent well completion pipe string
US20180363429A1 (en)*2017-06-132018-12-20Heal Systems LpPlunger lift assembly
US10927652B2 (en)2018-03-062021-02-23Flowco Production Solutions, LLCInternal valve plunger
US10550674B2 (en)2018-03-062020-02-04Flowco Production Solutions, LLCInternal valve plunger
CN108361006A (en)*2018-03-092018-08-03中国石油大学(华东)A kind of water drainage-gas recovery technology method using preset pneumatic type tubing string
US20220056785A1 (en)*2018-09-132022-02-24Flowco Production Solutions, LLCUnibody bypass plunger with integral dart valve cage
US11293267B2 (en)2018-11-302022-04-05Flowco Production Solutions, LLCApparatuses and methods for scraping
US10895128B2 (en)2019-05-222021-01-19Pcs Ferguson, Inc.Taper lock bypass plunger
USD937982S1 (en)2019-05-292021-12-07Flowco Production Solutions, LLCApparatus for a plunger system
CN110344818A (en)*2019-07-182019-10-18滨州学院Plunger lift well plunger uplink stage liquid slug batch tracing method
US11448049B2 (en)2019-09-052022-09-20Flowco Production Solutions, LLCGas assisted plunger lift control system and method
US11187066B2 (en)2019-09-262021-11-30Saudi Arabian Oil CompanyLifting condensate from wellbores
US11187044B2 (en)2019-12-102021-11-30Saudi Arabian Oil CompanyProduction cavern
US11460330B2 (en)2020-07-062022-10-04Saudi Arabian Oil CompanyReducing noise in a vortex flow meter
CN112112626A (en)*2020-09-032020-12-22中国石油天然气集团有限公司Bottom hole pressure control method based on underground hydrocarbon detection
CN112539047A (en)*2020-12-222021-03-23西安荣达石油工程有限公司Process pipe column capable of protecting oil-gas layer and realizing efficient gas lift liquid drainage and process
CN113417607A (en)*2021-08-052021-09-21北京中海沃邦能源投资有限公司石楼分公司Continuous pressure-increasing drainage and production equipment for low-pressure high-yield water well
CN116201507A (en)*2021-11-302023-06-02中国石油天然气股份有限公司 Gas well suction and drainage system and method
CN116006138A (en)*2023-02-092023-04-25西安利都仪表测控设备有限公司Oil extraction system of plunger gas lift device
CN116163688A (en)*2023-04-262023-05-26山东成林石油工程技术有限公司Device for exploiting oil gas by gas-water relay jet flow and application method

Similar Documents

PublicationPublication DateTitle
US20040129428A1 (en)Plunger lift deliquefying system for increased recovery from oil and gas wells
RU2196892C2 (en)Device and system (versions) for increase of liquid recovery from underground beds
US6637510B2 (en)Wellbore mechanism for liquid and gas discharge
US5343945A (en)Downholde gas/oil separation systems for wells
US9322251B2 (en)System and method for production of reservoir fluids
US7134503B2 (en)Wellbore pump
US20030141073A1 (en)Advanced gas injection method and apparatus liquid hydrocarbon recovery complex
US20090145595A1 (en)Gas assisted downhole pump
US20200199987A1 (en)Crossover valve system and method for gas production
CN101265897B (en)Downhole production and injection pump system
AU2010273768B2 (en)System and method for intermittent gas lift
US4036297A (en)Subsurface flow control apparatus and method
US20060076140A1 (en)Gas Lift Apparatus and Method for Producing a Well
US3968839A (en)Subsurface flow control apparatus
CA2775105C (en)Producing gas and liquid from below a permanent packer in a hydrocarbon well
RU2229586C1 (en)Controller valve
RU2054528C1 (en)Method for separated lifting of products of producing wells
US20170191355A1 (en)Two-step artificial lift system and method
US3385227A (en)Bottom hole separator

Legal Events

DateCodeTitleDescription
STCBInformation on status: application discontinuation

Free format text:ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION


[8]ページ先頭

©2009-2025 Movatter.jp