CN202706637U - Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line - Google Patents

Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line
Download PDF

Info

Publication number
CN202706637U
CN202706637UCN 201220306423CN201220306423UCN202706637UCN 202706637 UCN202706637 UCN 202706637UCN 201220306423CN201220306423CN 201220306423CN 201220306423 UCN201220306423 UCN 201220306423UCN 202706637 UCN202706637 UCN 202706637U
Authority
CN
China
Prior art keywords
hoop bracket
hoop
hold
steel tube
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220306423
Other languages
Chinese (zh)
Inventor
高廉洁
陈巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING CARVEDGE TECHNOLOGY Co Ltd
Original Assignee
NANJING CARVEDGE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING CARVEDGE TECHNOLOGY Co LtdfiledCriticalNANJING CARVEDGE TECHNOLOGY Co Ltd
Priority to CN 201220306423priorityCriticalpatent/CN202706637U/en
Application grantedgrantedCritical
Publication of CN202706637UpublicationCriticalpatent/CN202706637U/en
Anticipated expirationlegal-statusCritical
Expired - Fee Relatedlegal-statusCriticalCurrent

Links

Images

Landscapes

Abstract

The utility model relates to a video monitoring system mounting hold-hoop support for a steel tube tower in an electric transmission line. The video monitoring system mounting hold-hoop support comprises a mounting base, primary hold-hoop supports and secondary hold-hoop supports. The mounting base is welded on the primary hold-hoop supports. The primary hold-hoop supports are fixed with the secondary hold-hoop supports through nuts. Through adoption of the stable stress principle of a triangle on the mounting base, movable parts aloft are reduced, the parts aloft are prevented from accidentally falling down. The video monitoring system mounting hold-hoop support enables articles hoisted aloft to be decreased as many as possible so as to enable installation operation aloft to be simpler, faster and safer. The primary hold-hoop supports and the secondary hold-hoop supports adopt the up-and-down multilayer hold-hoop design, and disassembly is convenient through fixed connection between the nuts and the primary hold-hoop supports. Moreover, bearing capacity of the integral support becomes very strong, the contact area between the hold-hoop support and the steel tube tower is increased, and stress of the hold-hoop support to the contact portion of the steel tube tower is evenly dispersed.

Description

A kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line
Technical field
The utility model relates to preventing damage to power transmission line caused by external force intelligent early-warning system engineering, especially a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line.
Background technology
National interconnected power grid take the ultra-high/extra-high voltage transmission line of electricity as main framing is just changing the energy general layout of China, is promoting comprehensive sustainable development of economic society.Therefore the reliability service of transmission line of electricity concern economic development and the social people's livelihood propose higher requirement to transmission line of electricity.Steel tube tower is the important component part of transmission line of electricity, and along with the progressively construction of the interconnected macroreticular of transmission line of electricity, the use of steel tube tower is in continuous increase.At present, there is no at the ultra-high-tension power transmission line steel tube tower support that can bear larger load is installed, design neither damages steel tube tower in electric transmission line and has the support that bears larger load-bearing capacity has very strong realistic meaning and engineering practical value.
It is extremely difficult that equipment is installed on the ultra-high-tension power transmission line steel tube tower, and reason is as follows:
1) existing hoop bracket is too thin, can only be used for the lighter equipment of erection weight, does not possess the ability of bearing heavier equipment;
2) steel tube tower is in the wild environment, and it is higher with respect to ground that equipment is installed in the position of steel tube tower, and climate change scenario is complicated, the time have the bad weathers such as strong wind, heavy rain to occur.The problems such as equipment waves with the wind, falls very easily appear in erection equipment on the existing hoop bracket in adverse circumstances;
3) existing hoop bracket can only be installed simple equipment, relatively difficulty of some auxiliary equipment is installed at anchor ear.
The utility model content
Technical problem to be solved in the utility model is the deficiency for the above-mentioned background technology, and a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line is provided.
The utility model adopts following technical scheme for solving the problems of the technologies described above:
A kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line comprises mounting base, main hoop bracket, secondary hoop bracket, and described mounting base, secondary hoop bracket all are fixedly connected with main hoop bracket by bolt, nut; Described main hoop bracket, secondary hoop bracket have identical structure, wherein: described main hoop bracket comprises the arc anchor ear sheet of n layer parallel arrangement, the two ends of every one deck arc anchor ear sheet all are welded with a square steel disc, and it is the natural number greater than 2 that circular punching, n are arranged on the square steel disc; In the main hoop bracket in every layer of arc anchor ear sheet and the secondary hoop bracket arc anchor ear sheet of respective layer on the same level face.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, mounting base comprises two opening support frames that structure is identical, and an outside framework; Wherein:
The opening of described two opening support frames is towards the lateral wall of main hoop bracket, and is fixedly welded on symmetrically respectively on the lateral wall of main hoop bracket; Described outside framework is fitted on two opening support frame outer walls, is provided with the circular punching of installing for fixture in the joint place of outside framework and two opening support frames.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, two opening support frames are the right angle U-shaped, and the two ends of outside framework fit together with the base, right angle of described two opening support frames respectively.
Further, described a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line, the weld of an end of two opening support frames and the lateral wall of main hoop bracket is connected to each other.
The utility model adopts technique scheme, have following beneficial effect: mounting base has used triangle to stablize stressed principle, reduced at the aerial movable part of height, prevent high-altitude part accidental falling, it is simpler, faster, safer to make lifting high-altitude article reduce as much as possible to reach the high-altitude installation exercise.The major-minor hoop bracket has adopted up and down multilayer anchor ear design, is fixedly connected with convenient disassembly by nut with main hoop bracket; Make simultaneously very firm of integral support load-bearing, increased the contact area between hoop bracket and the steel tube tower, the Uniform Dispersion hoop bracket is to the stress of steel tube tower contact portion.
Description of drawings
Fig. 1 is for being used for installing on the steel tube tower in electric transmission line assembling drawing of the hoop bracket of video monitoring system.
Fig. 2 is for being used for installing on the steel tube tower in electric transmission line top view of the hoop bracket of video monitoring system.
Fig. 3 is for being used for installing on the steel tube tower in electric transmission line axis side views such as support of the main hoop bracket of video monitoring system.
Fig. 4 is for being used for installing on the steel tube tower in electric transmission line assembling drawing of the secondary hoop bracket of main hoop bracket of video monitoring system.
Number in the figure explanation: 1, mounting base, 2, secondary hoop bracket, 3, main hoop bracket, 4, the mounting base locking hole, 5, mounting base locking nut, 6, hoop bracket lock bolt, 7, the hoop bracket locking nut, 8, reinforcing rib, 9, main hoop bracket ear, 10, main hoop bracket locking hole, 11, secondary hoop bracket locking hole, 12, secondary hoop bracket ear.
The specific embodiment
Below in conjunction with accompanying drawing the technical solution of the utility model is elaborated:
Such as Fig. 1, Fig. 2, Fig. 3, a kind of hoop bracket for video monitoring system is installed on the steel tube tower in electric transmission line shown in Figure 4, comprisemounting base 1,secondary hoop bracket 2,main hoop bracket 3, mountingbase locking hole 4, mountingbase locking nut 5, hoopbracket lock bolt 6, hoopbracket locking nut 7, reinforcingrib 8, mainhoop bracket ear 9, main hoop bracket locking hole 10, secondary hoopbracket locking hole 11, secondaryhoop bracket ear 12.
Be used for the axis side views such as support of the main hoop bracket of installation video monitoring system on the steel tube tower in electric transmission line as shown in Figure 3.Main hoop bracket 3 comprises the arc anchor ear sheet of two-layer parallel arrangement, there is mainhoop bracket ear 9 at the two ends of every one deck arc anchor ear sheet, be welded with reinforcingrib 8 between mainhoop bracket ear 9 and the arc anchor ear sheet, mainhoop bracket ear 9 centers are drilled with main hoop bracket locking hole 10.Main hoop bracket and secondary hoop bracket fix and are connected by insert hoopbracket locking nut 7 between main hoop bracket locking hole 10, secondary hoop bracket locking hole 11.Mounting base 1 comprises two opening support frames, outside framework.The support frame of two openings is identical right angle U-shaped framework.Right angle U-shaped framework comprises the different parallel edges of two length and perpendicular to the right-angle side of parallel edges.The parallel edges of right angle U-shaped framework is welded on arc anchor ear sheet lateral wall center in the direction perpendicular to arc anchor ear sheet string, and the parallel edges of two right angle U-shaped frameworks is 90 degree angles simultaneously.Outside framework fits tightly and surrounds two right angle U-shaped frameworks, contacts and is welded on the main hoop bracket with 4 of each layer arc anchor ear sheets up and down.Be drilled with mountingbase locking hole 4 on the vertical edges of shell and the first right angle U-shaped framework, be drilled with mountingbase locking hole 4 on the vertical edges of shell and the second right angle U-shaped framework, be welded with mountingbase locking nut 5 in the mountingbase locking hole 4, be convenient to plug-in video monitoring equipment.The height ofmounting base 1 is determined according to the number of anchor ear sheet.
As shown in Figure 4,secondary hoop bracket 2 comprises the arc anchor ear sheet of two-layer parallel arrangement, there is secondaryhoop bracket ear 12 at the two ends of every one deck arc anchor ear sheet, be welded with reinforcingrib 8 between mainhoop bracket ear 12 and the arc anchor ear sheet, mainhoop bracket ear 12 centers are drilled with main hoop bracket locking hole 11.The arc anchor ear sheet of respective layer is fixedly connected with by the hoop bracket locking nut in every one deck arc anchor ear sheet in themain hoop bracket 3 and thesecondary hoop bracket 2.
As seen, mounting base has used triangle to stablize stressed principle, in the mounting base locking hole of mounting base both sides, be welded and fixed the mounting base locking nut, reduced at the aerial movable part of height, prevent high-altitude part accidental falling, it is simpler, faster, safer to make lifting high-altitude article reduce as much as possible to reach the high-altitude installation exercise.Main hoop bracket has adopted up and down multilayer anchor ear design, makes very firm of integral support load-bearing, and has increased the contact area between hoop bracket and the steel tube tower, can make hoop bracket to the sufficient Uniform Dispersion of the power of steel tube tower contact portion.Secondary hoop bracket adopts the structure structure identical with main hoop bracket to be fixedly connected with convenient disassembly by nut with main hoop bracket.

Claims (4)

1. hoop bracket that is used for installing on the steel tube tower in electric transmission line video monitoring system, it is characterized in that: comprise mounting base, main hoop bracket, secondary hoop bracket, described mounting base, secondary hoop bracket all are fixedly connected with main hoop bracket by bolt, nut; Described main hoop bracket, secondary hoop bracket have identical structure, wherein: described main hoop bracket comprises the arc anchor ear sheet of n layer parallel arrangement, the two ends of every one deck arc anchor ear sheet all are welded with a square steel disc, and it is the natural number greater than 2 that circular punching, n are arranged on the square steel disc; In the main hoop bracket in every layer of arc anchor ear sheet and the secondary hoop bracket arc anchor ear sheet of respective layer on the same level face.
CN 2012203064232012-06-282012-06-28Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission lineExpired - Fee RelatedCN202706637U (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN 201220306423CN202706637U (en)2012-06-282012-06-28Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN 201220306423CN202706637U (en)2012-06-282012-06-28Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line

Publications (1)

Publication NumberPublication Date
CN202706637Utrue CN202706637U (en)2013-01-30

Family

ID=47586952

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN 201220306423Expired - Fee RelatedCN202706637U (en)2012-06-282012-06-28Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line

Country Status (1)

CountryLink
CN (1)CN202706637U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104316666A (en)*2014-11-062015-01-28中国水产科学研究院渔业机械仪器研究所Water quality monitoring buoy sensor mounting clamp
CN106049957A (en)*2015-04-072016-10-26斯坦陵布什大学Frame supported height adjustable pylon
CN107366816A (en)*2017-09-142017-11-21建浩支架(昆山)有限公司Free splicing display suspension bracket
CN107394698A (en)*2017-08-042017-11-24北京航空航天大学Cable shade assembly and rocket
CN108523703A (en)*2017-03-032018-09-14广东美的生活电器制造有限公司Cooking machine
CN108682103A (en)*2018-07-162018-10-19海南电网有限责任公司海口供电局The system and its monitoring method of packaged type preventing damage to power transmission line caused by external force
CN114016806A (en)*2021-11-112022-02-08中国铁塔股份有限公司Chain type reinforcing method for rod/tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN104316666A (en)*2014-11-062015-01-28中国水产科学研究院渔业机械仪器研究所Water quality monitoring buoy sensor mounting clamp
CN106049957A (en)*2015-04-072016-10-26斯坦陵布什大学Frame supported height adjustable pylon
CN108523703A (en)*2017-03-032018-09-14广东美的生活电器制造有限公司Cooking machine
CN107394698A (en)*2017-08-042017-11-24北京航空航天大学Cable shade assembly and rocket
CN107394698B (en)*2017-08-042019-01-11北京航空航天大学Cable shade assembly and rocket
CN107366816A (en)*2017-09-142017-11-21建浩支架(昆山)有限公司Free splicing display suspension bracket
CN108682103A (en)*2018-07-162018-10-19海南电网有限责任公司海口供电局The system and its monitoring method of packaged type preventing damage to power transmission line caused by external force
CN114016806A (en)*2021-11-112022-02-08中国铁塔股份有限公司Chain type reinforcing method for rod/tower
CN114016806B (en)*2021-11-112023-08-15中国铁塔股份有限公司Chain type reinforcing method for pole/tower

Similar Documents

PublicationPublication DateTitle
CN202706637U (en)Video monitoring system mounting hold-hoop support for steel tube tower in electric transmission line
CN202090661U (en)Alternating-current extra-high voltage one-tower double-circuit linear tower
CN103410670B (en)Truss type wind-driven generator tower frame and there is the wind power generating set of this pylon
TW201911735A (en) Trinity coupled plug-in water surface photovoltaic power generation unit and power generation system thereof
CN102192112A (en)Piecewise concrete wind power tower
CN201975787U (en)+/-800 kV convertor station direct-current filter suspension mounting structure
CN203361166U (en)Supporting beam for building foundation pit support
CN102536681A (en) A hexagonal fan tower structure
CN210598351U (en)Novel three-pipe communication tower
CN203568690U (en)Track connecting structure capable of bearing complex load
CN202689665U (en)Three-column type repair tower
CN212389962U (en)Foundation bolt for fixing street lamp
CN202081693U (en)Straight steel pipe rod of extra-high voltage DC grounding electrode line
CN210508615U (en) Substation framework
CN202401812U (en)Iron tower with large specification
CN207348571U (en)Multistage linking pylon
CN219431495U (en)High-voltage iron tower safety monitoring station mounting frame
CN201588414U (en)Supporting structure for framework scaffolds
CN201943563U (en)Telescopic stabilizer for ladder feet
CN206722516U (en)Adapt to the power transmission tower of mountain terrain
CN206942288U (en)A kind of electric power tower
CN107939613B (en)Stacked tower system for wind gathering power generation
CN204947527U (en)A kind of iron tower of power transmission line cable bearer
CN204001817U (en)Combined support frame
CN202121229U (en)Column cap of bracket for electrical equipment

Legal Events

DateCodeTitleDescription
C14Grant of patent or utility model
GR01Patent grant
CF01Termination of patent right due to non-payment of annual fee

Granted publication date:20130130

Termination date:20190628

CF01Termination of patent right due to non-payment of annual fee