Rural households are with folding bathing apparatusTechnical field
The utility model relates to a kind of sanitary equipment, the folding bathing apparatus that a kind of rural households that say so more specifically use.
Background technology
Along with reform and opening-up, the development of economic society, and some Huimin policies of country's appearance in recent years, farmers' income is increased, and the surplus labor occurs in addition, and the migrant worker increases year by year, also taken back simultaneously townie new concept, make common people not only pay attention to the demand of materials such as rice and flour oil salt, they of arduous work one day, also wish can be delighted a hot bath of washing alleviate one day tired out.But present peasant mainly still uses big bathtub, can also use hot-water bottle (hot-water bottle to be put into the roof, through irradiation of sunlight in the time of summer, make dress water temperature rising in it), arbitrarily do local cover one next dash and get over, but its service life is short, and extremely inconvenient.In addition, though have fragmentary solar energy or electric heater to settle the rural area, it costs an arm and a leg, and the water yield is few, and power consumption is big, and does not have the space of sealing, even independent space is arranged, floor space is also very big, uses extremely inconvenient.
Summary of the invention
The purpose of this utility model is to provide a kind of economic convenient rural households suitable, energy-conservation, that take up space little folding bathing apparatus.
The purpose of this utility model is achieved in that
These rural households comprise heater, cold water storage cistern, boiler with folding bathing apparatus, heater links to each other with boiler by circulating hot water pipe, circulating water pipe, this bathing apparatus also comprises folding bath room, described folding bath room comprises that the loam cake, lower cover tank, the curtain that have big shower nozzle enclose, drainpipe, and the loam cake side is provided with hydroboom;
Described heater is that interlayer burns plate or annular is burnt plate;
Described lower cover tank is set up sewage and is promoted aqua storage tank;
Described curtain encloses by zip and is connected with the lower cover tank with loam cake;
Described curtain encloses by the slideway mode and is connected with the lower cover tank with loam cake;
Folding bath room metope top is provided with a suspension member box in addition, and the suspension member box respectively is provided with a spray painting head for four jiaos.
Three respectively are provided with a spray painting head beyond the folding bath room loam cake removal wall covering surface.
Described rural households also comprise the increase pump with folding bathing apparatus, its by be flexible coupling be located at loam cake in the hot and cold water mixing tube be connected.
Owing to adopt said structure, this bathing apparatus had the following advantages:
A. because bathing the room can fold, so the time spent does not take up room very little at ordinary times;
B. whole device has only the booster pump power consumption, so energy-conservation;
C. because heater is by rural area the light a fire kitchen range top, the wall with flues of usefulness, do not need other operation, so economic convenient being suitable for.
Description of drawings
Fig. 1 is the utility model overall structure schematic diagram.
Fig. 2 is the utility model side structure schematic diagram.
Fig. 3 is the utility model superstructure schematic diagram.
Fig. 4 is the utility model lower cover sink structure schematic diagram.
Fig. 5 is supply channel and a booster pump connection diagram in the loam cake.
The specific embodiment
These rural households comprise heater, cold water storage cistern 1,boiler 2, folding bath room 3 with folding bathing apparatus, heater links to each other withboiler 2 by circulating hot water pipe 4, circulating water pipe 5, folding bath room 3 is flexible coupling by hot water and 6 is flexible coupling with cold water and 7 links to each other with cold water storage cistern 1 respectively atboiler 2, folding bath room 3 comprises that theloam cake 9 that has big shower nozzle 8,lower cover tank 10, curtain enclose 11,drainpipe 12, andloam cake 9 sides are provided with hydroboom 13.Folding bath room 3 utilizes a face wall andloam cake 9,lower cover tank 10, curtain to enclose 11 spaces that surround a sealing.Heater is that interlayer burns plate 14 or annular is burnt plate 15 or both use simultaneously.Lower cover tank 10 is set up sewage and is promoted aqua storage tank 16.Curtain encloses 11 and is connected withlower cover tank 10 withloam cake 9 by zip or two kinds of connected modes of slideway 17 pulleys.18 two kinds of set-up modes of spray painting head, one, folding bath room 3 metope tops are provided with a suspension member box 19 in addition, the suspension member box respectively is provided with a spray painting head 18 for 19 4 jiaos, its two, folding bath room 3loam cakes 9 are removed beyond the wall covering surfaces three and respectively are provided with a spray painting head 18.Supply channel is contained inloam cake 9 interlayers, booster pump 20 by be flexible coupling be located at loam cake in hot and cold water mixing tube 21 be connected.
In addition, curtain recited above enclose 11 with two kinds of set-up modes of two kinds of connected modes ofloam cake 9,lower cover tank 10 and spray painting head 18 can arbitrary combination.
Adopt the silk that expands fixing during installation, as long as kitchen one side has 1.2 meters long places along wall, just can paste wall and install, folding bath room 3 and water tank can be installed by locellus, and folding bath room 3 can be installed in corridor or room one jiao, floor space is 1.2*0.9=1.08 square metre when using, it is thick that wall 8.5cm is pasted in folding back, do not hinder walking or place article, at the peasant household that does not descend well, available hammer drill and water bore the exterior wall perforating, can also be with machinery by the indoor buried pipe eye of outwards tiltedly beating less than 10 meters.After folding, post the scenery with hills and waters picture of the various patterns of waterproof on the big plane that 1.2 meters * 2 meters, the time spent is not the very beautiful decorative fresco of a pair.
The combined heated device, promptly interlayer burns plate 14 and annular is burnt plate 15, can singlely install, installation also capable of being combined, kitchen range mouth of single fire, water all can heat cycles, and after tested, kitchen range mouth of single fire 25-30 minute can be warmed to 200 jin, a traditional unit of weight water 40-45 ℃.Burn plate (14-15) row and put a burning mouthful interior upside, flame directly burns the plate face, and the energy of the highest temperature is directly transferred to boiler, so it is fast especially to heat up, if installing, combination makes a fire simultaneously, speed is faster, use always winter and burn plate, in giving the residence, can have a bath in the heating, use pot and stove summer always, because it is less to make a fire, but only need 40-45 ℃ of just bathing, this temperature temperature and not cool, the sweat that disappears that just in time drives away summer heat, very suitable.
Spray painting head 18 main spray positions are shoulder and waist, and its function one is using water wisely, the 2nd, and autumn and winter season is opened spray painting head 18, can from top to bottom squeeze the room to cold air, work the effect of heating, during with spray painting head 18, people's whole body is shrouded by hot mist, whole body is wet and do not drip, and makes skin run through sweat mixed with dirt with the long period, dashes with big shower nozzle 8 one again, very comfortable, spray painting head 18 adopts corrugated tubes to connect, and can regulate nozzle angle arbitrarily, and this is novel in design and be subjected to a lot of people's approval.
User's usage operation is as follows: after 1., gently lifting 915 ° of angles of loam cake,loam cake 9 is upspring automatically to the equilbrium position, andlower cover tank 10 usefulness hands are set level in ground; 2., pull out the bilateral curtain and enclose 11 to the front, magnetic stripe seals automatically in the inlet chamber; 3., open the pass, booster pump 20 begins automatically, the self-regulated temperature, free shower nozzle, the beginning bathing; 4., wash after, close switch, booster pump 20 stops automatically, goes out to bathe the room, curtain is enclosed bilateral retract original position; 5., atlast loam cake 9 andlower cover tank 10 are fastened with wall.