Mine working face floor strata " bipolar-bipolar " detection methodTechnical field
The present invention relates in a kind of Mineral Engineering the detection method of work plane base plate, relate in particular to a kind of structural behavior or " bipolar-bipolar " detection method of surveying of geological structure such as the inclusion enclave in the work plane, solution cavity, water content to the work plane base plate.
Background technology
At present, detection operations face floor strata geologic anomaly mainly adopts " dipole-dipole " method in the mine down-hole, so-called dipole promptly is a polar distance of supplying power with measure pole span all less than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Because of the down-hole special geological condition is limit, when " dipole-dipole " method of employing is surveyed, because polar distance of supplying power and measurement pole span are less than normal, cause detectable signal very faint, add that the down-hole electrical interference is big, the reliability of data reduces greatly, thereby causes observed result with a low credibility, has a strong impact on the application of technical method.Overcome this deficiency, need to strengthen supply current and strengthen observation signal, can produce potential safety hazard owing to increase electric current, this is unallowed under mine.
Summary of the invention
Technical problem to be solved by this invention is the deficiency that exists at above-mentioned " dipole-dipole " method, a kind of structural behavior or " bipolar-bipolar " detection method of surveying of geological structure such as the inclusion enclave in the work plane, solution cavity, water content to the work plane base plate is provided, data reliability height with detection, advantages such as observed result confidence level height.
The present invention solves the problems of the technologies described above the technical method that is adopted and comprises following three steps:
A, electrodes of A, B are arranged in the tunnel, set A, the B mid point is O1, to electrode A, B power supply, measure the electric current I between AB with power supply; Measurement electrode M, N are arranged in another tunnel, and setting M, N mid point are O2, measure the voltage Δ U between the MN.
B, electrode A, B are fixed on the measuring position, keep MN length constant, with the mobile MN in certain interval, O like this1, O2Line with regard to inswept certain area, form a fan section; Length is constant between maintenance A, the B, and A, B are moved on to next measuring position, and MN repeats last same operation, O like this1, O2The inswept again certain area of line, form another fan section.
C, move the complete strips tunnel according to the method described above, monolateral measurement finishes, and to above-mentioned survey data, utilizes resistivity CT method to carry out Inversion Calculation, and carries out imaging.
Said method also comprises current electrode and measurement electrode exchange, finishes another monolateral measurement according to above-mentioned a, b, c step, utilizes resistivity CT method to carry out Inversion Calculation, and carries out imaging.
Length between the above-mentioned MN is not less than O1O2Between length 1/5th.
Length between the above-mentioned MN is O
1O
2Between minimum length
Length between the above-mentioned AB is not less than O1O2Between length 1/5th.
Length between the above-mentioned AB is O
1O
2Between minimum length
The invention has the beneficial effects as follows: so-called bipolar, promptly be polar distance of supplying power and measure pole span all greater than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Compare with " dipole-dipole " method, owing to increased polar distance of supplying power and measured pole span, " bipolar-bipolar " method can be in the voltage difference that has increased under the situation that does not increase supply current between two current electrodes, thereby increased the intensity of power supply electric field, thereby guarantee that measuring-signal obviously increases, overcome the weak deficiency of " dipole-dipole " method detectable signal.
Description of drawings
Accompanying drawing 1 is the schematic diagram of detection method of the present invention;
The imaging effect figure of 2 embodiment of the present invention of accompanying drawing.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing, and mine working face floor strata " bipolar-bipolar " detection method is so-called bipolar, promptly be polar distance of supplying power and measure pole span all greater than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Electrodes of A, B are arranged in the tunnel, and the mid point of A, B is O1, power to AB with power supply, measure the electric current I between AB; Measurement electrode M, N are arranged in another tunnel, and M, N mid point are O2, measure the voltage Δ U between the MN, if O1, O2When line passed through water content, then result of detection can change.Fixedly AB keeps MN length constant, with the mobile MN in certain interval, O like this1, O2Line forms a fan section with regard to inswept certain area; Keep AB length constant, AB is moved on to the next position, MN repeats last same operation, O like this1, O2Inswept again certain area forms another fan section.Move the complete strips tunnel, monolateral measurement finishes.Current electrode and measurement electrode are exchanged, finish another monolateral measurement in the same way.To survey data, utilize resistivity CT method to carry out Inversion Calculation, and carry out imaging, come to determine accurately and effectively the property of water-bearing and the water-bearing structure of work plane floor strata.
In order to increase observation signal, the length between the electrodes of A B needn't and measurement electrode MN between equal in length, and can not be enlarged to and satisfyOr(O1O2For current electrode pole span mid point to the distance between the measurement electrode mid point, this the approximate condition that the AB utmost point or the MN utmost point can be regarded as dipole as shown in Figure 1), thereby overcome the deficiency of other technical method, need not to strengthen supply current, just can guarantee to strengthen observation signal, overcome the down-hole and disturb, guarantee the confidence level of observed result.Through the lab and field test, the effect of this technology obviously is better than the observation quality and the geological effect of " dipole-dipole " method.Studies show that the selection of AB, MN size is different different because of face width, but neither the big more Effect on Detecting of pole span good more in the practical application.Because O1O2Between length be uncertain, along with measurement electrode moves and changes O1O2Between minimum range equal the width of work plane.Test shows that establishing face width is L, and then AB length is chosen asMN length is chosen as
Embodiment: coal is in 3901 work plane scopes on certain ore deposit, because the influence of layer slip fault, three ashes dwindle with ten times ashes, grey spacings difficult to understand.Last coal seam floor is reduced to 80~130 meters apart from the grey spacing of Austria, and grey karst difficult to understand is grown and is strong artesian aquifer, and the safe working of last coal is had certain threat.In order to find out the coal seam floor property of water-bearing, and whether exist original the leading of artesian water to rise passage, in 3901 tailentries and transportation lane, utilize " bipolar-bipolar " method to carry out the roadway floor property of water-bearing respectively and survey experiment.Utilize imaging effect figure that resistivity CT method is finally inversed by as shown in Figure 2, the work plane base plate exists 1 district, two the low-resistance exceptions area in 2 districts, i.e. water aquifer 1 andwater aquifer 2 as seen from Figure 2.Except these two water aquifers, other zones property of water-bearing in depth of exploration is on the weak side.After surveying experiment, the boring check has been carried out near the water zone that this ore deposit is just detected immediately and other zones tunnel, in the water aquifer 1 andwater aquifer 2 in various degree water outlet all appears, then do not have water outlet in other zones, verified that it is reliably with effective that utilization " bipolar-bipolar " method is surveyed.