Movatterモバイル変換


[0]ホーム

URL:


CN1828016A - "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face - Google Patents

"Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face
Download PDF

Info

Publication number
CN1828016A
CN1828016ACN 200610043385CN200610043385ACN1828016ACN 1828016 ACN1828016 ACN 1828016ACN 200610043385CN200610043385CN 200610043385CN 200610043385 ACN200610043385 ACN 200610043385ACN 1828016 ACN1828016 ACN 1828016A
Authority
CN
China
Prior art keywords
bipolar
length
detection method
working face
mine working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610043385
Other languages
Chinese (zh)
Inventor
程久龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and TechnologyfiledCriticalShandong University of Science and Technology
Priority to CN 200610043385priorityCriticalpatent/CN1828016A/en
Publication of CN1828016ApublicationCriticalpatent/CN1828016A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Landscapes

Abstract

The invention discloses a dual-pole-dual-pole detecting method of mine working surface bottom plate terrane, which arranges the power electrodes A and B into one channel, while their midpoint is 01; powers the AB and measure the current I between AB; arranges the measuring electrodes M and N in another channel while their midpoint is 02; measures the voltage deltaU between them; and fixes AB to keep the MN length; moves MN distantly; therefore, the connecting line of 01 and 02 can scan a certain area to form a sector; keeps the AB length to move it to another position and repeat the operation; therefore, said connecting line can scan a certain area to form another sector; moves to the whole channel to complete the measurement. According to measured data, the invention uses resistance CT method to reversely calculate and process image treatment to accurately set the water content and structure of working surface bottom plate terrance. The invention has the advantages as strong detecting signal, less safe hidden, and high detecting accuracy.

Description

Mine working face floor strata " bipolar-bipolar " detection method
Technical field
The present invention relates in a kind of Mineral Engineering the detection method of work plane base plate, relate in particular to a kind of structural behavior or " bipolar-bipolar " detection method of surveying of geological structure such as the inclusion enclave in the work plane, solution cavity, water content to the work plane base plate.
Background technology
At present, detection operations face floor strata geologic anomaly mainly adopts " dipole-dipole " method in the mine down-hole, so-called dipole promptly is a polar distance of supplying power with measure pole span all less than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Because of the down-hole special geological condition is limit, when " dipole-dipole " method of employing is surveyed, because polar distance of supplying power and measurement pole span are less than normal, cause detectable signal very faint, add that the down-hole electrical interference is big, the reliability of data reduces greatly, thereby causes observed result with a low credibility, has a strong impact on the application of technical method.Overcome this deficiency, need to strengthen supply current and strengthen observation signal, can produce potential safety hazard owing to increase electric current, this is unallowed under mine.
Summary of the invention
Technical problem to be solved by this invention is the deficiency that exists at above-mentioned " dipole-dipole " method, a kind of structural behavior or " bipolar-bipolar " detection method of surveying of geological structure such as the inclusion enclave in the work plane, solution cavity, water content to the work plane base plate is provided, data reliability height with detection, advantages such as observed result confidence level height.
The present invention solves the problems of the technologies described above the technical method that is adopted and comprises following three steps:
A, electrodes of A, B are arranged in the tunnel, set A, the B mid point is O1, to electrode A, B power supply, measure the electric current I between AB with power supply; Measurement electrode M, N are arranged in another tunnel, and setting M, N mid point are O2, measure the voltage Δ U between the MN.
B, electrode A, B are fixed on the measuring position, keep MN length constant, with the mobile MN in certain interval, O like this1, O2Line with regard to inswept certain area, form a fan section; Length is constant between maintenance A, the B, and A, B are moved on to next measuring position, and MN repeats last same operation, O like this1, O2The inswept again certain area of line, form another fan section.
C, move the complete strips tunnel according to the method described above, monolateral measurement finishes, and to above-mentioned survey data, utilizes resistivity CT method to carry out Inversion Calculation, and carries out imaging.
Said method also comprises current electrode and measurement electrode exchange, finishes another monolateral measurement according to above-mentioned a, b, c step, utilizes resistivity CT method to carry out Inversion Calculation, and carries out imaging.
Length between the above-mentioned MN is not less than O1O2Between length 1/5th.
Length between the above-mentioned MN is O1O2Between minimum length
Figure A20061004338500041
Length between the above-mentioned AB is not less than O1O2Between length 1/5th.
Length between the above-mentioned AB is O1O2Between minimum length
Figure A20061004338500042
The invention has the beneficial effects as follows: so-called bipolar, promptly be polar distance of supplying power and measure pole span all greater than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Compare with " dipole-dipole " method, owing to increased polar distance of supplying power and measured pole span, " bipolar-bipolar " method can be in the voltage difference that has increased under the situation that does not increase supply current between two current electrodes, thereby increased the intensity of power supply electric field, thereby guarantee that measuring-signal obviously increases, overcome the weak deficiency of " dipole-dipole " method detectable signal.
Description of drawings
Accompanying drawing 1 is the schematic diagram of detection method of the present invention;
The imaging effect figure of 2 embodiment of the present invention of accompanying drawing.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing, and mine working face floor strata " bipolar-bipolar " detection method is so-called bipolar, promptly be polar distance of supplying power and measure pole span all greater than power supply utmost point mid point to measuring 1/5th of utmost point mid point distance.Electrodes of A, B are arranged in the tunnel, and the mid point of A, B is O1, power to AB with power supply, measure the electric current I between AB; Measurement electrode M, N are arranged in another tunnel, and M, N mid point are O2, measure the voltage Δ U between the MN, if O1, O2When line passed through water content, then result of detection can change.Fixedly AB keeps MN length constant, with the mobile MN in certain interval, O like this1, O2Line forms a fan section with regard to inswept certain area; Keep AB length constant, AB is moved on to the next position, MN repeats last same operation, O like this1, O2Inswept again certain area forms another fan section.Move the complete strips tunnel, monolateral measurement finishes.Current electrode and measurement electrode are exchanged, finish another monolateral measurement in the same way.To survey data, utilize resistivity CT method to carry out Inversion Calculation, and carry out imaging, come to determine accurately and effectively the property of water-bearing and the water-bearing structure of work plane floor strata.
In order to increase observation signal, the length between the electrodes of A B needn't and measurement electrode MN between equal in length, and can not be enlarged to and satisfyAB≤15O1O2OrMN≤15O1O2(O1O2For current electrode pole span mid point to the distance between the measurement electrode mid point, this the approximate condition that the AB utmost point or the MN utmost point can be regarded as dipole as shown in Figure 1), thereby overcome the deficiency of other technical method, need not to strengthen supply current, just can guarantee to strengthen observation signal, overcome the down-hole and disturb, guarantee the confidence level of observed result.Through the lab and field test, the effect of this technology obviously is better than the observation quality and the geological effect of " dipole-dipole " method.Studies show that the selection of AB, MN size is different different because of face width, but neither the big more Effect on Detecting of pole span good more in the practical application.Because O1O2Between length be uncertain, along with measurement electrode moves and changes O1O2Between minimum range equal the width of work plane.Test shows that establishing face width is L, and then AB length is chosen asAB=25L~13L;MN length is chosen as
MN=13L~15L.
Embodiment: coal is in 3901 work plane scopes on certain ore deposit, because the influence of layer slip fault, three ashes dwindle with ten times ashes, grey spacings difficult to understand.Last coal seam floor is reduced to 80~130 meters apart from the grey spacing of Austria, and grey karst difficult to understand is grown and is strong artesian aquifer, and the safe working of last coal is had certain threat.In order to find out the coal seam floor property of water-bearing, and whether exist original the leading of artesian water to rise passage, in 3901 tailentries and transportation lane, utilize " bipolar-bipolar " method to carry out the roadway floor property of water-bearing respectively and survey experiment.Utilize imaging effect figure that resistivity CT method is finally inversed by as shown in Figure 2, the work plane base plate exists 1 district, two the low-resistance exceptions area in 2 districts, i.e. water aquifer 1 andwater aquifer 2 as seen from Figure 2.Except these two water aquifers, other zones property of water-bearing in depth of exploration is on the weak side.After surveying experiment, the boring check has been carried out near the water zone that this ore deposit is just detected immediately and other zones tunnel, in the water aquifer 1 andwater aquifer 2 in various degree water outlet all appears, then do not have water outlet in other zones, verified that it is reliably with effective that utilization " bipolar-bipolar " method is surveyed.

Claims (6)

1, mine working face floor strata " bipolar-bipolar " detection method is characterized in that this method comprises the steps:
A, electrodes of A, B are arranged in the tunnel, set A, the B mid point is O1, to electrode A, B power supply, measure the electric current I between AB with power supply; Measurement electrode M, N are arranged in another tunnel, and setting M, N mid point are O2, measure the voltage Δ U between the MN.
B, electrode A, B are fixed on the measuring position, keep MN length constant, with the mobile MN in certain interval, O like this1, O2Line with regard to inswept certain area, form a fan section; Length is constant between maintenance A, the B, and A, B are moved on to next measuring position, and MN repeats last same operation, O like this1, O2The inswept again certain area of line, form another fan section.
C, move the complete strips tunnel according to the method described above, monolateral measurement finishes, and to above-mentioned survey data, utilizes resistivity CT method to carry out Inversion Calculation, and carries out imaging.
2, mine working face floor strata according to claim 1 " bipolar-bipolar " detection method, it is characterized in that said method also comprises current electrode and measurement electrode exchange, finish another monolateral measurement according to above-mentioned a, b, c step, utilize resistivity CT method to carry out Inversion Calculation, and carry out imaging.
3, mine working face floor strata according to claim 1 and 2 " bipolar-bipolar " detection method is characterized in that the length between the MN is not less than O1O2Between length 1/5th.
4, mine working face floor strata according to claim 3 " bipolar-bipolar " detection method is characterized in that the length between the MN is O1O2Between minimum length
5, mine working face floor strata according to claim 3 " bipolar-bipolar " detection method is characterized in that the length between the AB is not less than O1O2Between length 1/5th.
6, mine working face floor strata according to claim 4 " bipolar-bipolar " detection method is characterized in that the length between the AB is O1O2Between minimum length
Figure A2006100433850002C2
CN 2006100433852006-03-212006-03-21 "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working FacePendingCN1828016A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN 200610043385CN1828016A (en)2006-03-212006-03-21 "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN 200610043385CN1828016A (en)2006-03-212006-03-21 "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face

Publications (1)

Publication NumberPublication Date
CN1828016Atrue CN1828016A (en)2006-09-06

Family

ID=36946551

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN 200610043385PendingCN1828016A (en)2006-03-212006-03-21 "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face

Country Status (1)

CountryLink
CN (1)CN1828016A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101798923A (en)*2010-03-302010-08-11煤炭科学研究总院重庆研究院System and method for remote control coal mine evacuation working face advance detection and forecasting
CN102147483A (en)*2010-12-302011-08-10杨佃俊Groundwater-recharge bipolar double-meter electric well logging method
CN109507735A (en)*2018-11-292019-03-22长江勘测规划设计研究有限责任公司The time shift electrical survey (-ing) method of swelled ground dykes and dams landslide infiltration sliding process tracking
CN109521476A (en)*2018-11-292019-03-26长江勘测规划设计研究有限责任公司Dykes and dams resistivity tomography observation system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101798923A (en)*2010-03-302010-08-11煤炭科学研究总院重庆研究院System and method for remote control coal mine evacuation working face advance detection and forecasting
CN101798923B (en)*2010-03-302013-07-10煤炭科学研究总院重庆研究院System and method for remote control coal mine evacuation working face advance detection and forecasting
CN102147483A (en)*2010-12-302011-08-10杨佃俊Groundwater-recharge bipolar double-meter electric well logging method
CN109507735A (en)*2018-11-292019-03-22长江勘测规划设计研究有限责任公司The time shift electrical survey (-ing) method of swelled ground dykes and dams landslide infiltration sliding process tracking
CN109521476A (en)*2018-11-292019-03-26长江勘测规划设计研究有限责任公司Dykes and dams resistivity tomography observation system
CN109507735B (en)*2018-11-292020-10-23长江勘测规划设计研究有限责任公司 A time-lapse electrical detection method for tracking the seepage and sliding process of expansive soil embankment landslides

Similar Documents

PublicationPublication DateTitle
Bin et al.Comprehensive surface geophysical investigation of karst caves ahead of the tunnel face: a case study in the Xiaoheyan section of the water supply project from Songhua River, Jilin, China
Robert et al.Assessing the contribution of electrical resistivity tomography (ERT) and self-potential (SP) methods for a water well drilling program in fractured/karstified limestones
Robert et al.A salt tracer test monitored with surface ERT to detect preferential flow and transport paths in fractured/karstified limestones
CN105652329B (en)A kind of method and apparatus assessed roof and regard water yield
Bu et al.Application of the comprehensive forecast system for water-bearing structures in a karst tunnel: a case study
WO2018107959A1 (en)Transient electromagnetic three-component exploration method utilized in mine shaft
CN102768369A (en)Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN102182437B (en)Method for determining and eliminating hydraulic fracture stress boundary of coal mine underground drilling
Arjwech et al.Electrical resistivity imaging of unknown bridge foundations
CN109991667B (en)Method for quickly judging hydraulic connection between water-containing layers
CN110333542A (en)New method is visited in advance in a kind of tunnel of long electrode source DC electric field
Shi et al.Application of three-dimensional high-density resistivity method in roof water advanced detection during working stope mining
Feng‐Shan et al.APPLICATION OF HIGH‐DENSITY RESISTIVITY METHOD IN DETECTING WATER‐BEARING STRUCTURES AT A SEABED GOLD MINE
AndradeIntervention of Electrical Resistance Tomography (ERT) in resolving hydrological problems of a semi arid granite terrain of Southern India
CN105842738B (en)A kind of buried target body quantitatively judges method and apparatus extremely
CN1828016A (en) "Bipolar-Double Pole" Detection Method of Floor Rock in Mine Working Face
Song et al.Comprehensive identification and assessment of clastic rock and water-bearing breccia for water and mud inrush in tunnel: A case study
CN114019577A (en)Method, computer equipment and medium for advanced exploration of water-rich property in front of driving face
Yu et al.Research on full space transient electromagnetism technique for detecting aqueous structures in coal mines
CN113504572A (en)Method for enhancing grouting effect of working surface base plate detected by audio-frequency electric perspective method
CN112731559A (en)Method for rapidly positioning sandstone-type uranium mineralization through coal field drilling information
Johnson–D’AppoloniaApplications of the electrical resistivity method for detection of underground mine workings
CN117607990A (en)Method for detecting ground pre-grouting effect of vertical shaft through geophysical well logging
CN203201544U (en)Testing device for simulation detecting of position of water rich area of mine coal rock layer
Li et al.Advanced detection and analysis of inclined shaft passing through aquifer in the mine of western China

Legal Events

DateCodeTitleDescription
C06Publication
PB01Publication
C10Entry into substantive examination
SE01Entry into force of request for substantive examination
C12Rejection of a patent application after its publication
RJ01Rejection of invention patent application after publication

Open date:20060906


[8]ページ先頭

©2009-2025 Movatter.jp