
技术领域technical field
本发明涉及水坝测压管的保护装置,特别是一保护水坝测压管的仪表箱。The invention relates to a protection device for a dam piezometric tube, in particular to an instrument box for protecting the dam piezometer tube.
背景技术Background technique
为了保证水库大坝的安全,多年来,人们采取了大量的工程手段,监测大坝的运行安全状况。其中,测压管是渗流监测中最重要的监测装置,其建造过程复杂,保护难度较大,运行中常被外部落物堵塞而报费,严重影响大坝的安全运行监测。In order to ensure the safety of the reservoir dam, people have adopted a large number of engineering methods to monitor the operation safety of the dam over the years. Among them, the piezometric tube is the most important monitoring device in seepage monitoring. Its construction process is complicated and its protection is difficult. During operation, it is often blocked by external falling objects, which seriously affects the safe operation monitoring of the dam.
目前,现有的测压管保护装置是用自制的铁帽或砖石混凝土砌筑体加铁盖设置在测压管口进行防护,这些防护方法建造过程复杂、施工工程量大、防护等级低、容易被人撬开破坏。此外,随着近年来计算机自动化技术的发展,水库大坝安全监测亟需实现自动化。由于水库所在地周边条件的限制,其山区自然环境及人为破坏等,使管口防护已成为水库大坝安全运行自动化监测设备无法在现场(特别是大坝上)安装的一大棘手问题。现有的测压管保护装置更无法适应自动化监测设备特别是二次仪表的现场安装。At present, the existing protection devices for piezometric tubes are protected by self-made iron caps or masonry concrete masonry and iron caps on the piezometric tube openings. These protection methods are complex in construction process, large in construction engineering, and low in protection level , It is easy to be pried open and damaged. In addition, with the development of computer automation technology in recent years, the safety monitoring of reservoirs and dams urgently needs to be automated. Due to the limitation of the surrounding conditions of the reservoir location, its mountainous natural environment and man-made damage, nozzle protection has become a thorny issue that cannot be installed on-site (especially on the dam) with automatic monitoring equipment for safe operation of reservoir dams. The existing protection devices for piezometric tubes cannot adapt to the on-site installation of automatic monitoring equipment, especially secondary instruments.
发明内容Contents of the invention
为了克服上述的不足之处,本发明的目的在于提供一种保护水坝测压管的仪表箱,该仪表箱既能够保护水坝测压管不被破坏,又可实现自动化安全监测设备的现场安装。In order to overcome the above disadvantages, the object of the present invention is to provide an instrument box for protecting the piezometric tube of the dam, which can not only protect the piezometric tube of the dam from being damaged, but also realize the on-site installation of automatic safety monitoring equipment.
本发明的目的是通过以下技术方案来实现的:The purpose of the present invention is achieved through the following technical solutions:
本发明包括箱体及箱盖,箱盖密闭盖在箱体上,并与箱体重叠一段距离,所述箱盖的一端经暗装式铰链活动连接在箱体上,另一端为自由端,在箱盖自由端下面的箱体上设有防撬锁;箱体的底面上分别开设测压管进口、集流排水孔、进线孔;The present invention includes a box body and a box cover. The box cover is airtightly covered on the box body and overlaps with the box body for a certain distance. One end of the box cover is movably connected to the box body through a concealed hinge, and the other end is a free end. There is an anti-pry lock on the box below the free end of the box cover; the bottom surface of the box is respectively provided with the inlet of the pressure measuring tube, the collecting and draining hole, and the inlet hole;
其中:所述箱体的底面上加设多个箱体内嵌式地脚孔;所述箱体的内壁上设有多个电缆夹扣;在箱体与箱盖重叠的部分设有边沿挡块及铰下挡块;所述箱体的前后两表面分别设有进风板及出风板,并在进风板、出风板下面的箱体上开有多个风孔;所述防撬锁可以采用护围式。Among them: the bottom surface of the box is provided with a plurality of embedded anchor holes; the inner wall of the box is provided with a plurality of cable clips; the overlapping part of the box and the box cover is provided with an edge block and hinged block; the front and rear surfaces of the box are respectively provided with an air inlet plate and an air outlet plate, and a plurality of air holes are opened on the box below the air inlet plate and the air outlet plate; Lockpicking can adopt the guard type.
本发明总体上为一箱体结构,从结构上提出了水坝测压管保护装置的一种新的技术路线,与现有技术相比更具有适用范围广、保护力度大、保护效果好、防破坏等特点,具体为:The present invention generally has a box structure, and proposes a new technical route for the dam piezo tube protection device in terms of structure. Destruction and other characteristics, specifically:
1.本发明采用半埋式安装与长短油度的漆料配合,适应了一年四季野外连续变化的条件,耐雨水虫蚀、雾霜冰尘,解决了每昼夜温度、湿度变化和现场防雷、防电源浪涌等关键技术,保证系统稳定工作。1. The present invention adopts semi-buried installation and long and short oil paint materials, adapts to the conditions of continuous changes in the field throughout the year, resists rain, insect erosion, fog, frost, ice and dust, and solves the daily temperature and humidity changes and on-site lightning protection , anti-power surge and other key technologies to ensure the stable operation of the system.
2.设在本发明箱底的集流排水孔可使箱内的积水经其流出箱外,使雨水或冷凝水离开测压管壁,防止水流渗进管内影响测压管测量精度。2. The collecting and draining holes arranged at the bottom of the tank of the present invention can allow the accumulated water in the tank to flow out of the tank through it, and make rainwater or condensed water leave the wall of the piezometer tube, preventing water from seeping into the tube and affecting the measurement accuracy of the piezometer tube.
3.本发明可安装于野外现场,因其主要由箱盖和箱体组成,即使在常年无人看护的情况下,也能经受较强外力作用从而保证测压管不受到损坏,起到很好的保护效果。3. The present invention can be installed in the field, because it is mainly composed of the box cover and the box body, even if it is left unattended all the year round, it can also withstand strong external force so as to ensure that the pressure measuring tube is not damaged, which plays a very important role. Good protective effect.
4.本发明箱盖与箱体结合牢固,可防止人为撬动,整个箱体经箱体内嵌式地脚孔固定在水坝上,有效地防止人为从外部破坏。4. The box cover of the present invention is firmly combined with the box body, which can prevent artificial prying, and the whole box body is fixed on the dam through the embedded anchor holes in the box, effectively preventing artificial damage from the outside.
附图说明Description of drawings
图1为本发明整体结构的主视图;Fig. 1 is the front view of overall structure of the present invention;
图2为图1的左视图;Fig. 2 is the left view of Fig. 1;
图3为图1的仰视图;Fig. 3 is the bottom view of Fig. 1;
图4为图1的后视图。FIG. 4 is a rear view of FIG. 1 .
具体实施方式Detailed ways
下面结合附图对本发明作进一步详述。The present invention will be described in further detail below in conjunction with the accompanying drawings.
如图1~图4所示,本发明包括箱体1及箱盖8,箱盖8密闭盖在箱体1上,并与箱体1重叠一段距离,在两者重叠的部分设有边沿挡块4及铰下挡块6,共同控制箱盖8的开启位置,防止现场工作人员抛甩式掀盖引起坝体与箱体1的撞击。箱盖8的一端经暗装式铰链9铰接在箱体1,另一端为自由端,可沿暗装式铰链9开启或关闭。暗装式铰链9设在箱盖8与箱体1重叠部分,可防止人为从铰链处撬动。在箱盖8自由端下面的箱体1上设有护围式防撬锁7,其与箱盖8配合,可防止锁具被撬。箱体1的前后两表面分别设有进风板2及出风板3,并在进风板2、出风板3下面的箱体1上开有多个风孔5,实现通畅的气流调节。箱体1的底面上根据水坝现场测压管的位置、大小及电缆线的分布情况开设测压管进口10、集流排水孔13、进线孔14。箱体1的内壁上设有多个电缆夹扣11,用来固定从水坝穿入箱内的电缆。箱体1的底面上加设多个箱体内嵌式地脚孔12,地脚螺栓通过箱体内嵌式地脚孔12穿入箱内进行固定,有效防止人为从外部拆卸仪表箱。As shown in Figures 1 to 4, the present invention includes a box body 1 and a box cover 8, the box cover 8 is airtightly covered on the box body 1, and overlaps with the box body 1 for a certain distance, and an edge stop is provided at the overlapping part. Block 4 and hinged lower block 6 jointly control the opening position of the box cover 8, preventing the on-site staff from throwing and throwing the type flipping cover to cause the impact of the dam body and the box body 1. One end of the case cover 8 is hinged to the casing 1 through a concealed hinge 9, and the other end is a free end, which can be opened or closed along the concealed hinge 9. The concealed hinge 9 is located at the overlapping part of the case cover 8 and the casing 1, which can prevent people from prying from the hinge. On the casing 1 below case cover 8 free ends, be provided with enclosure type tamper-resistant lock 7, and it cooperates with case cover 8, can prevent lockset from being picked. The front and rear surfaces of the box body 1 are respectively equipped with an
安装本发明时,在需要实施保护的测压管管口建筑偏心结构的混凝土基台,台面中心设置集流坑和与其相连的引槽,仪表箱内一旦有积水可经箱底的集流排水孔13与基台配合排出箱外,于台面汇流后由引槽集中排向离测压管较远的一端,使雨水或冷凝水离开测压管管壁,防止水流渗进管内影响测量精度。然后将测压管经测压管进口10插入箱体1内,并将箱体1焊接在测压管上,保持箱体1及箱内设备的良好接地。再将来自水坝不同方向的电缆线经进线孔14穿入箱体1内,并由箱内电缆夹扣固定,防止电缆线沿水坝坡敷设后高端电缆滑脱。需要安装自动化仪表或进行二次仪表安装时,可打开箱盖8进行安装即可,安装完毕后再关闭箱盖8、上锁。When installing the present invention, build an eccentric concrete abutment with an eccentric structure at the mouth of the piezo tube that needs to be protected, and set a sump pit and a guide groove connected to it in the center of the table top. Once there is accumulated water in the instrument box, it can be drained through the collection at the bottom Hole 13 cooperates with the abutment to discharge out of the box, and after converging on the table, it is discharged to the end far away from the piezometric tube by the guide groove, so that rainwater or condensed water leaves the wall of the piezo tube to prevent water from seeping into the tube and affecting the measurement accuracy. Then insert the pressure measuring tube into the box body 1 through the pressure measuring tube inlet 10, and weld the box body 1 on the pressure measuring tube to keep the good grounding of the box body 1 and the equipment in the box. Then the cables from different directions of the dam are penetrated in the box body 1 through the inlet hole 14, and are fixed by the cable clips in the box to prevent the high-end cables from slipping off after the cables are laid along the slope of the dam. When automation instrument needs to be installed or secondary instrument is installed, case cover 8 can be opened and installed, and case cover 8 is closed and locked after installation.
本发明采用半埋式安装与长短油度的漆料配合以解决温差、日晒和腐蚀带来的负面效应,组合式通气孔板可进一步调节箱内温度、湿度并保证相对压力的测量。坡式箱盖的设计可使秋季到初冬期间箱盖内的凝结水流至箱外,悬置式仪表架可使二次仪表免受凝结水的影响。The present invention adopts semi-buried installation and long and short oily paints to solve the negative effects caused by temperature difference, sunlight and corrosion. The combined ventilation hole plate can further adjust the temperature and humidity in the box and ensure the measurement of relative pressure. The design of the sloping box cover allows the condensed water in the box cover to flow out of the box from autumn to early winter, and the suspended instrument frame can protect the secondary instrument from the influence of condensed water.
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2004100207291ACN1294328C (en) | 2004-06-11 | 2004-06-11 | Instrument box protecting dam barometer tube |
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2004100207291ACN1294328C (en) | 2004-06-11 | 2004-06-11 | Instrument box protecting dam barometer tube |
| Publication Number | Publication Date |
|---|---|
| CN1707032A CN1707032A (en) | 2005-12-14 |
| CN1294328Ctrue CN1294328C (en) | 2007-01-10 |
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2004100207291AExpired - Fee RelatedCN1294328C (en) | 2004-06-11 | 2004-06-11 | Instrument box protecting dam barometer tube |
| Country | Link |
|---|---|
| CN (1) | CN1294328C (en) |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103255781B (en)* | 2012-02-21 | 2015-08-12 | 辽宁省水利水电科学研究院 | A kind of field Soil Moisture Monitoring well |
| CN103376139B (en)* | 2012-04-12 | 2016-08-03 | 辽宁省水利水电科学研究院 | A kind of flow guide protection cover of high calcium district seepage monitoring equipment |
| CN110398313B (en)* | 2019-09-04 | 2024-05-14 | 中国电建集团中南勘测设计研究院有限公司 | Dynamic water pressure measuring device and method |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2109372U (en)* | 1991-10-22 | 1992-07-08 | 昆明市环卫科研所 | Combined rubbish box with handles |
| CN2150113Y (en)* | 1993-03-03 | 1993-12-22 | 蔡学升 | Sanitary box for railway carriage |
| US5844781A (en)* | 1996-09-16 | 1998-12-01 | Eaton Corporation | Electrical device such as a network protector relay with printed circuit board seal |
| CN1200346A (en)* | 1997-05-26 | 1998-12-02 | 日本电气株式会社 | Waterproof structure of cases |
| NZ331930A (en)* | 1996-04-03 | 2000-10-27 | Peter Bunert | Electronic circuit card, card halves have internal recess for circuit parts, plastic sheath moulded around card |
| CN2707810Y (en)* | 2004-06-11 | 2005-07-06 | 辽宁省水利水电科学研究院 | Instrument case for protecting dam piezometer |
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2109372U (en)* | 1991-10-22 | 1992-07-08 | 昆明市环卫科研所 | Combined rubbish box with handles |
| CN2150113Y (en)* | 1993-03-03 | 1993-12-22 | 蔡学升 | Sanitary box for railway carriage |
| NZ331930A (en)* | 1996-04-03 | 2000-10-27 | Peter Bunert | Electronic circuit card, card halves have internal recess for circuit parts, plastic sheath moulded around card |
| US5844781A (en)* | 1996-09-16 | 1998-12-01 | Eaton Corporation | Electrical device such as a network protector relay with printed circuit board seal |
| CN1200346A (en)* | 1997-05-26 | 1998-12-02 | 日本电气株式会社 | Waterproof structure of cases |
| CN2707810Y (en)* | 2004-06-11 | 2005-07-06 | 辽宁省水利水电科学研究院 | Instrument case for protecting dam piezometer |
| Publication number | Publication date |
|---|---|
| CN1707032A (en) | 2005-12-14 |
| Publication | Publication Date | Title |
|---|---|---|
| CN107402041A (en) | It is a kind of to be used to detect the experimental rig that biology is detained facility operation efficiency | |
| CN107268689A (en) | Prevent road rain water from entering the safety device and application system of underground pipe gallery | |
| CN1294328C (en) | Instrument box protecting dam barometer tube | |
| CN205637054U (en) | Inspection well lid and be used for inspection shaft that utility tunnel internal drain pipe said | |
| CN114759665A (en) | Intelligent hidden type flood control facility comprehensive device for urban tunnel and control method thereof | |
| CN2707810Y (en) | Instrument case for protecting dam piezometer | |
| CN105863030A (en) | Well lid of inspection well and inspection well used for drainage pipe in comprehensive pipe rack | |
| CN209280041U (en) | Hydrological observation well special for drainage pipe network | |
| CN211873579U (en) | Rainwater fill for building roof drainage | |
| CN205907782U (en) | Urban waterlogging early warning device | |
| CN201933548U (en) | Cutoff water tank of secondary water supply equipment | |
| CN109708704A (en) | A special hydrological observation well for drainage pipe network | |
| CN211897830U (en) | A protection structure for municipal road pipe fittings | |
| CN212926160U (en) | Cable well and pressure flow automatic drainage device thereof | |
| CN219267504U (en) | Waterproof type electric switch | |
| CN217711041U (en) | Safe and guaranteed integrated intercepting well | |
| CN114032935A (en) | A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate | |
| CN217738278U (en) | Plumb line protector | |
| CN219429741U (en) | Laboratory sewage treatment device mounting structure | |
| CN208167944U (en) | It crosses sea, cross river section drainage pumping plant | |
| CN206419062U (en) | The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant | |
| CN114439044B (en) | Cable well structure capable of preventing ponding | |
| CN221822859U (en) | Silt dam drainage structure | |
| CN222145262U (en) | Wind direction and wind speed measuring instrument | |
| CN223135284U (en) | A water inlet culvert for an underground rainwater storage tank |
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |