Movatterモバイル変換


[0]ホーム

URL:


CN117236791A - Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology - Google Patents

Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology
Download PDF

Info

Publication number
CN117236791A
CN117236791ACN202311490221.7ACN202311490221ACN117236791ACN 117236791 ACN117236791 ACN 117236791ACN 202311490221 ACN202311490221 ACN 202311490221ACN 117236791 ACN117236791 ACN 117236791A
Authority
CN
China
Prior art keywords
water conservancy
water
index
data
change index
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311490221.7A
Other languages
Chinese (zh)
Other versions
CN117236791B (en
Inventor
郭翔铭
丛宁
王朋中
赵鹏
贾兰英
丁昌辉
夏树栋
李�杰
张婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huiyi Information Technology Co ltd
Original Assignee
Shandong Huiyi Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huiyi Information Technology Co ltdfiledCriticalShandong Huiyi Information Technology Co ltd
Priority to CN202311490221.7ApriorityCriticalpatent/CN117236791B/en
Publication of CN117236791ApublicationCriticalpatent/CN117236791A/en
Application grantedgrantedCritical
Publication of CN117236791BpublicationCriticalpatent/CN117236791B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The application discloses a water conservancy real-time monitoring method and system based on a GIS and BIM three-dimensional technology, and relates to the technical field of water conservancy real-time monitoring. According to the water conservancy real-time monitoring method and system based on the GIS and BIM three-dimensional technology, the water conservancy data acquisition module, the water conservancy data processing module, the water conservancy data analysis module, the early warning module, the database module and the visualization module are arranged. The application realizes the construction of the hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model by the GIS and BIM three-dimensional technology, calculates the hydraulic abnormality index, provides better service for hydraulic monitoring and management, improves the efficiency and accuracy of the hydraulic engineering, helps monitoring staff to master the hydraulic condition in time, takes proper measures when the abnormal condition occurs, and reduces or avoids the occurrence of the hydraulic disaster. Meanwhile, the visual water conservancy situation can be better displayed, so that a user can know more visual and comprehensive water conservancy information.

Description

Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology
Technical Field
The application relates to the technical field of water conservancy real-time monitoring based on GIS and BIM three-dimensional technology, in particular to a water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology.
Background
With the rapid development of economy and the increasing population, the contradiction between demand and supply of water resources is increasingly prominent. In order to reasonably utilize and manage limited water resources, information such as hydrologic data, water quality conditions and water quantity distribution needs to be monitored, and meanwhile, in the hydraulic engineering construction and urban planning, information such as hydrologic changes, water levels and flow needs to be mastered in time in recent years, so that disaster prevention work is performed in advance, and the life and property safety of the public is guaranteed. Real-time monitoring of water conservancy is therefore required to solve the above problems.
The current technology realizes the joint scheduling with wading engineering and facility management systems by carrying out monitoring analysis of water and drought through real-time information sensing based on engineering operation information such as Geographic Information (GIS) capability, spatial information model (BIM) capability, internet of things (IoT) capability, data storage (DB) capability and the like provided by a CIM platform. For example, publication No.: CN113434565a based on CIM platform, comprehensive disaster reduction platform system for water conservancy flood control, drought resistance and waterlogging prevention, and based on real-time water rain condition monitoring, soil moisture content prediction, grid hydrologic numerical forecasting model, river network hydrodynamics forecasting model, urban waterlogging model, etc., issues forecasting and early warning information to professionals and public, and carries out disaster evaluation.
However, the technology has no omnibearing display aiming at water conservancy conditions, and has no display aiming at analysis and visual interface of water conservancy anomalies.
Disclosure of Invention
Aiming at the defects of the prior art, the application provides a water conservancy real-time monitoring method and system based on a GIS and BIM three-dimensional technology, and solves the problems of the background technology.
In order to achieve the above purpose, the application is realized by the following technical scheme: a water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology comprises the following steps: the system comprises a water conservancy data acquisition module, a water conservancy data processing module, a water conservancy data analysis module, a judgment module, an early warning module, a database module and a visualization module; the water conservancy data acquisition module is used for acquiring water conservancy data, wherein the water conservancy data comprises: hydrologic geographic data and hydraulic engineering data; the hydraulic data processing module is used for constructing a three-dimensional model of hydrologic geographic information and a three-dimensional model of hydraulic engineering through GIS and BIM three-dimensional technology based on hydraulic data to obtain hydrologic parameters and water pollutant parameters; the water conservancy data analysis module is used for evaluating the change index of the water level based on the hydrological parameters and evaluating the change index of the water quality based on the water pollutant parameters; the judging module is used for judging the relation between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold, and calculating the water conservancy abnormality index; the early warning module is used for analyzing the water conservancy abnormality index and timely sending out an alarm to inform monitoring personnel; the visualization module is used for updating the three-dimensional model of the constructed hydrologic geographic information, the three-dimensional model of the hydraulic engineering and the change index of the water level, the water quality change index and the water conservancy abnormality index based on the GIS and BIM three-dimensional technology in real time and presenting the three-dimensional model and the three-dimensional model of the hydraulic engineering and the change index, the water quality change index and the water conservancy abnormality index to a user through a visual interface; the database module is used for storing the standard value of the water pollutant parameter and the threshold value of the water conservancy abnormality index.
Further, the hydrographic geographic data includes: precipitation data, surface water data, groundwater data, topography data, and soil data; the hydraulic engineering data comprises: building material data, local meteorological data, hydraulic engineering design drawing data and hydraulic engineering operation data.
Further, based on water conservancy data, the specific process of constructing the three-dimensional model of the hydrologic geographic information and the three-dimensional model of the water conservancy project through the GIS and BIM three-dimensional technology is as follows: preprocessing hydrologic geographic data and hydraulic engineering data, wherein the preprocessing of the hydrologic geographic data and the hydraulic engineering data comprises the following steps: data conversion, data cleaning and data missing value filling; the method comprises the steps of respectively importing preprocessed hydrologic geographic data and hydraulic engineering data into GIS and BIM software, carrying out geographic coding and spatial data analysis on the hydrologic geographic data by the GIS, generating digital expression of hydrologic geographic information, constructing a primary hydrologic geographic information three-dimensional model, carrying out digital modeling on the hydraulic engineering data by the BIM, constructing a primary hydraulic engineering three-dimensional model, carrying out format unification and standardization processing on the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model, and placing the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model under the same coordinate system for spatial alignment and data interaction to form the hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model.
Further, the hydrologic parameters include: precipitation amount, runoff amount; the water body pollutant parameters comprise: nitrogen and phosphorus compound concentration, heavy metal concentration and suspended solid concentration.
Further, based on the hydrologic parameter, the calculation formula of the change index of the estimated water level is as follows:
wherein->An index of change in water level, P represents precipitation, Q represents runoff, e represents natural number,/->And a correction compensation factor indicating the index of change of the precipitation and runoff corresponding to the water level.
Further, based on the water pollutant parameters, the calculation formula for evaluating the water quality change index is as follows:
,/>the water quality change index is represented by N, the concentration of nitrogen and phosphorus compounds, C, the concentration of heavy metals, T, the concentration of suspended solids and +.>Standard value for representing concentration of nitrogen and phosphorus compounds, < >>Standard value of heavy metal concentration,/->Standard value of suspended solids concentration,/->The weight factors of the corresponding water quality change indexes of the phosphorus compound concentration, the heavy metal concentration and the suspended solid concentration are represented, and e represents a natural number.
Further, the process of judging the relationship between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold is as follows: when the change index of the water level is larger than the threshold value of the change index of the water level or the change index of the water quality is larger than the threshold value of the change index of the water quality, the water conservancy abnormality index is 1, and when the change index of the water level is smaller than the threshold value of the change index of the water level and the change index of the water quality is smaller than the threshold value of the change index of the water quality, the water conservancy abnormality index is 0; the calculation formula for calculating the water conservancy abnormality index is as follows:,/>indicating index of abnormality of water conservancy,/->Threshold value representing the index of change of the water level, +.>A threshold value representing a water quality change index.
Further, the specific process of analyzing the water conservancy abnormality index and timely sending out an alarm to inform monitoring personnel is as follows: based on the water conservancy abnormality index, when the water conservancy abnormality index is equal to 1, the water conservancy abnormality index indicates that the water conservancy exists, and the monitoring personnel is required to be informed by sending out an alarm, and when the water conservancy abnormality index is equal to 0, the water conservancy abnormality index indicates that the water conservancy does not exist, and the monitoring personnel is not required to be informed by sending out an alarm.
Further, the specific process of constructing the three-dimensional model of the hydrologic geographic information and the three-dimensional model of the hydraulic engineering based on the GIS and BIM three-dimensional technology, updating the change index of the water level, the water quality change index and the water conservancy abnormality index in real time and presenting the updated indexes to the user through the visual interface is as follows: the visualization module displays the constructed hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model in a webpage through data interaction with the water conservancy data acquisition module, the water conservancy data processing module, the water conservancy data analysis module and the early warning module, and simultaneously updates the change index of the water level, the water quality change index and the water conservancy abnormality index in real time and displays the change index, the water quality change index and the water conservancy abnormality index to a user through a visual interface by utilizing a line graph.
A method for a water conservancy real-time monitoring system based on a GIS and BIM three-dimensional technology, comprising the following steps: s1, acquiring water conservancy data, wherein the water conservancy data comprises: hydrologic geographic data and hydraulic engineering data; s2, constructing a three-dimensional model of hydrologic geographic information and a three-dimensional model of hydraulic engineering through a GIS and BIM three-dimensional technology based on hydraulic data to obtain hydrologic parameters; s3, based on hydrological parameters, evaluating a change index of the water level, and based on water pollutant parameters, evaluating a water quality change index; s4, judging the relation between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold, and calculating the water conservancy abnormality index; s5, analyzing the water conservancy abnormality index, and timely sending out an alarm to inform monitoring staff; s6, constructing a hydrologic geographic information three-dimensional model and a hydraulic engineering three-dimensional model based on a GIS and BIM three-dimensional technology, updating a water quality change index and a water conservancy abnormality index in real time, and displaying the water conservancy geographic information three-dimensional model and the water conservancy engineering three-dimensional model and the water level change index and the water conservancy abnormality index to a user through a visual interface.
The application has the following beneficial effects:
(1) According to the water conservancy real-time monitoring method and system based on the GIS and BIM three-dimensional technology, the efficiency and accuracy of the hydraulic engineering are improved by calculating the water level change index, the water quality change index and the water conservancy abnormality index, monitoring staff are helped to grasp the water conservancy situation in time, appropriate measures are taken when the abnormality occurs, the occurrence of water conservancy disasters is reduced or avoided, and a decision maker can be helped to make reasonable decisions in engineering design and planning stages, engineering risks are reduced, and water resource allocation is optimized.
(2) According to the water conservancy real-time monitoring method and system based on the GIS and BIM three-dimensional technology, the hydraulic geographical information three-dimensional model and the hydraulic engineering three-dimensional model are constructed, the change index of the water level, the water quality change index and the water conservancy abnormality index are updated in real time and are presented to the user through the visual interface, so that the water conservancy situation can be better displayed, and the user can know more visual and comprehensive water conservancy information.
Of course, it is not necessary for any one product to practice the application to achieve all of the advantages set forth above at the same time.
Drawings
FIG. 1 is a flow chart of a water conservancy real-time monitoring system based on a GIS and BIM three-dimensional technology;
fig. 2 is a flow chart of a water conservancy real-time monitoring method based on a GIS and BIM three-dimensional technology.
Detailed Description
The embodiment of the application realizes the problem of real-time water conservancy monitoring through the water conservancy real-time monitoring method and the system based on the GIS and BIM three-dimensional technology.
The problems in the embodiment of the application have the following general ideas:
firstly, acquiring water conservancy data, wherein the water conservancy data comprises: and based on the hydraulic data, constructing a three-dimensional model of the hydraulic geographic information and a three-dimensional model of the hydraulic engineering by a GIS and BIM three-dimensional technology to obtain the hydraulic parameters.
Based on hydrologic parameters, the change index of the water level is evaluated, based on water pollutant parameters, the change index of the water level is evaluated, the relationship between the change index of the water level and the water quality change index and the relationship between the change index threshold of the water level and the water quality change index threshold are judged, the water conservancy abnormality index is calculated, the water conservancy abnormality index is analyzed, and the monitoring personnel is informed of the alarm sent out in time.
And constructing a three-dimensional model of the hydrologic geographic information and a three-dimensional model of the hydraulic engineering based on the GIS and BIM three-dimensional technology, updating the change index of the water level, the water quality change index and the water conservancy abnormality index in real time, and displaying the updated index to a user through a visual interface.
Referring to fig. 1, the embodiment of the application provides a technical scheme: a water conservancy real-time monitoring system based on GIS and BIM three-dimensional technology comprises the following steps: : the system comprises a water conservancy data acquisition module, a water conservancy data processing module, a water conservancy data analysis module, a judgment module, an early warning module, a database module and a visualization module.
The water conservancy data acquisition module is used for acquiring water conservancy data, wherein the water conservancy data comprises: hydrologic geographic data and hydraulic engineering data.
Specifically, the hydrographic geographic data includes: precipitation data, surface water data, groundwater data, topography data, soil data, hydraulic engineering data include: building material data, local meteorological data, hydraulic engineering design drawing data and hydraulic engineering operation data.
In this embodiment, elements such as a geographical environment, hydrologic features and hydraulic engineering facilities can be presented in a three-dimensional form through hydrologic geographic data and building material data, so that a model is more visual and visualized, the features of the geographical environment and the layout and structure of the hydraulic engineering can be better understood, an intuitive information basis is provided for a user, and simultaneously, the hydrologic geographic data and the building material data can be used for laying a foundation for constructing a hydrologic geographic information three-dimensional model and a hydraulic engineering three-dimensional model.
The water conservancy data processing module is used for constructing a three-dimensional model of hydrologic geographic information and a three-dimensional model of water conservancy project through GIS and BIM three-dimensional technology based on water conservancy data to obtain hydrologic parameters and water body pollutant parameters.
Specifically, based on water conservancy data, the specific process of constructing the three-dimensional model of the hydrologic geographic information and the three-dimensional model of the hydraulic engineering through the GIS and BIM three-dimensional technology is as follows: preprocessing hydrologic geographic data and hydraulic engineering data, wherein the preprocessing of the hydrologic geographic data and the hydraulic engineering data comprises the following steps: data conversion, data cleaning and data missing value filling; the method comprises the steps of respectively importing preprocessed hydrologic geographic data and hydraulic engineering data into GIS and BIM software, carrying out geographic coding and spatial data analysis on the hydrologic geographic data by the GIS, generating digital expression of hydrologic geographic information, constructing a primary hydrologic geographic information three-dimensional model, carrying out digital modeling on the hydraulic engineering data by the BIM, constructing a primary hydraulic engineering three-dimensional model, carrying out format unification and standardization processing on the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model, and placing the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model under the same coordinate system for spatial alignment and data interaction to form the hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model.
In the embodiment, in GIS and BIM software, the standard data format Shapefile can be used for importing and exporting the hydrologic geographic data and the hydraulic engineering data, the data are converted into a unified format, data sharing and communication are carried out among different software, and the hydrologic geographic characteristics and hydraulic engineering facilities of an area can be comprehensively reflected by integrating the hydrologic geographic data and the hydraulic engineering data. The model covers the contents of the hydrographic geographic information such as the topography, the hydrographic elements, the water resource distribution and the like, the structure, the layout, the functions and the like of the hydraulic engineering, and provides a comprehensive information foundation for a decision maker; the GIS technology and the BIM technology are utilized to visually display hydrologic geographic information and hydraulic engineering in a three-dimensional form, and a decision maker can more easily understand and analyze related data through an intuitive space model and a graphical interface, so that the accuracy and efficiency of decision making are improved; the hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model are constructed based on GIS and BIM software, and data sharing and cooperative work can be conveniently carried out. Different departments and personnel can share the same data source, so that data redundancy and repeated work are reduced, and the data utilization efficiency and the work efficiency are improved.
Specifically, the hydrologic parameters include: precipitation amount, runoff amount; the water body pollutant parameters include: nitrogen and phosphorus compound concentration, heavy metal concentration and suspended solid concentration.
In this embodiment, precipitation and runoff are important parameters for assessing water level changes. The change of the water level can be known by monitoring and analyzing the change of the precipitation and the runoff, and the change of the water level has important significance for water resource regulation, flood control, drought relief and the like, so that the evaluation of the water level change index can help to judge the utilization condition of the water resource and the health state of a hydrologic system; the water pollutant parameters including nitrogen and phosphorus compound concentration, heavy metal concentration and suspended solid concentration are key indexes for evaluating water quality change, and reflect the pollution degree of the water and the accumulation condition of pollutants. By monitoring and analyzing the changes of the parameters, the water quality condition of the water body can be estimated, and corresponding water pollution treatment measures can be timely taken. The assessment of the water quality change index can help to protect the water source, maintain the ecological environment and improve the healthy water of the people.
The water conservancy data analysis module is used for evaluating the change index of the water level based on the hydrologic parameter and evaluating the water quality change index based on the water pollutant parameter.
Specifically, based on the hydrologic parameters, the calculation formula for evaluating the change index of the water level is as follows:
wherein->An index of change in water level, P represents precipitation, Q represents runoff, e represents natural number,/->Indicating the corresponding water level of precipitation and runoffA modified compensation factor for the change index of (a).
In this embodiment, two parameters, namely precipitation and runoff, are needed for calculating the water level change index, and the two parameters are also needed for calculating the water conservancy abnormality index as basic data, so that when the water conservancy abnormality index is calculated, the change information of precipitation and runoff can be obtained by calculating the water level change index, thereby better evaluating the hydrologic situation of the river basin; the calculation of the water level change index can provide basic data and reference basis for evaluating the water conservancy abnormality index, help us to better understand the hydrologic situation in the flow field, discover problems in time, and take corresponding measures for management and regulation.
Specifically, based on the water pollutant parameters, the calculation formula for evaluating the water quality change index is as follows:
,/>the water quality change index is represented by N, the concentration of nitrogen and phosphorus compounds, C, the concentration of heavy metals, T, the concentration of suspended solids and +.>Standard value for representing concentration of nitrogen and phosphorus compounds, < >>Standard value of heavy metal concentration,/->Standard value of suspended solids concentration,/->The weight factors of the corresponding water quality change indexes of the phosphorus compound concentration, the heavy metal concentration and the suspended solid concentration are represented, and e represents a natural number.
In this embodiment, the water quality change index can provide information about the water conditions to better assess the hydrologic situation of the basin. By analyzing and comparing the time sequence change trend of the water quality change index, we can know the development trend of water pollution in the river basin, the distribution rule of pollutants, and the possible pollution sources and pollutant types. The information has important reference value for predicting flood disasters and formulating flood control drought-resistant scheme work; the calculation of the water quality change index can provide basic data and reference basis for evaluating the water conservancy abnormality index, help us to better understand the hydrologic situation and water quality condition of the river basin, and help to predict flood disasters, formulate flood control drought resisting schemes and the like, so that sustainable development of the river basin is ensured.
The judging module is used for judging the relation between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold, and calculating the water conservancy abnormality index.
Specifically, the process of judging the relationship between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold is as follows: when the change index of the water level is larger than the threshold value of the change index of the water level or the change index of the water quality is larger than the threshold value of the change index of the water quality, the water conservancy abnormality index is 1, and when the change index of the water level is smaller than the threshold value of the change index of the water level and the change index of the water quality is smaller than the threshold value of the change index of the water quality, the water conservancy abnormality index is 0; the calculation formula for calculating the water conservancy abnormality index is as follows:,/>indicating index of abnormality of water conservancy,/->Threshold value representing the index of change of the water level, +.>A threshold value representing a water quality change index.
In the embodiment, the judgment of the change index of the water level and the water quality change index and the threshold value thereof can help the water conservancy department to monitor the water level change and the water quality change, monitor the hydrologic situation and the water quality condition in real time, discover the abnormal situation in the flow field in time, and be helpful for early warning and making countermeasures in advance, so as to ensure the safe utilization of water resources; judging the relation between the water level change index and the water quality change index and the threshold value of the water level change index can help the water conservancy department to timely master the hydrologic and water quality change conditions in the flow field, shorten the response time and quickly take countermeasures, thereby avoiding various adverse effects caused by abnormal conditions.
The early warning module is used for analyzing the water conservancy abnormality index and timely sending out an alarm to inform monitoring personnel.
Specifically, the specific process of analyzing the water conservancy abnormality index and timely sending out an alarm to inform monitoring personnel is as follows: based on the water conservancy abnormality index, when the water conservancy abnormality index is equal to 1, the water conservancy abnormality index indicates that the water conservancy exists, and the monitoring personnel is required to be informed by sending out an alarm, and when the water conservancy abnormality index is equal to 0, the water conservancy abnormality index indicates that the water conservancy does not exist, and the monitoring personnel is not required to be informed by sending out an alarm.
In this embodiment, the alarm notification of the water conservancy abnormality index can provide an important reference for the decision maker. Based on the alarm notification, a decision maker can timely know the water conservancy conditions in the flow field, formulate corresponding prevention and response strategies, optimize the operation of the water conservancy system, and allocate resources and manage disasters according to actual conditions. This helps to promote decision making and coping capabilities of water conservancy departments and decision makers; based on the alarm notification of the water conservancy abnormality index, the water conservancy department can timely find abnormal conditions, take measures and notify monitoring personnel. The method is favorable for improving the effect and response speed of water conservancy monitoring, reducing potential risks and losses and guaranteeing the safety and sustainable development of water conservancy.
The visualization module is used for updating the three-dimensional model of the hydrologic geographic information and the three-dimensional model of the hydraulic engineering and the change index of the water level, the water quality change index and the water conservancy abnormality index which are constructed based on the GIS and BIM three-dimensional technology in real time and displaying the three-dimensional model and the three-dimensional model of the hydraulic engineering and the change index and the water conservancy abnormality index to a user through a visualization interface.
Specifically, the specific process of constructing a three-dimensional model of hydrologic geographic information and a three-dimensional model of hydraulic engineering based on GIS and BIM three-dimensional technology, updating the change index of water level, the water quality change index and the water conservancy abnormality index in real time and presenting the updated indexes to a user through a visual interface is as follows: the visualization module displays the constructed hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model in a webpage through data interaction with the water conservancy data acquisition module, the water conservancy data processing module, the water conservancy data analysis module and the early warning module, and simultaneously updates the change index of the water level, the water quality change index and the water conservancy abnormality index in real time and displays the change index, the water quality change index and the water conservancy abnormality index to a user through a visual interface by utilizing a line graph.
In the embodiment, the three-dimensional model of hydrologic geographic information and the three-dimensional model of hydraulic engineering are displayed through the visual interface, so that monitoring personnel can intuitively and comprehensively know the information of resources such as the terrain, the water system, the reservoir, the embankment and the like in the monitored area, and the relation and the influence among the resources. The monitoring personnel can know the running condition of the water conservancy system in time, discover problems and abnormal conditions in time, and take corresponding measures; the water level change index is updated in real time and presented to a user in a line graph mode, the user can clearly know the change trend of the water level, and the process and trend of the water level change are conveniently pre-judged, so that a water conservancy management strategy is timely adjusted, and the stable operation of the reservoir and the water system is ensured; updating the water conservancy abnormality index in real time, displaying the water conservancy abnormality index to a user through a visual interface, and reminding the user of abnormality and risk in time. The monitoring personnel can pertinently formulate corresponding early warning measures, thereby improving the early warning effect and reducing the potential loss and the risk.
Referring to fig. 2, the embodiment of the application provides a water conservancy real-time monitoring method based on a GIS and BIM three-dimensional technology, which comprises the following steps: s1, acquiring water conservancy data, wherein the water conservancy data comprises: hydrologic geographic data and hydraulic engineering data; s2, constructing a three-dimensional model of hydrologic geographic information and a three-dimensional model of hydraulic engineering through a GIS and BIM three-dimensional technology based on hydraulic data to obtain hydrologic parameters; s3, based on hydrological parameters, evaluating a change index of the water level, and based on water pollutant parameters, evaluating a water quality change index; s4, judging the relation between the change index of the water level and the water quality change index and the change index threshold of the water level and the water quality change index threshold, and calculating the water conservancy abnormality index; s5, analyzing the water conservancy abnormality index, and timely sending out an alarm to inform monitoring staff; s6, constructing a hydrologic geographic information three-dimensional model and a hydraulic engineering three-dimensional model based on a GIS and BIM three-dimensional technology, updating a water quality change index and a water conservancy abnormality index in real time, and displaying the water conservancy geographic information three-dimensional model and the water conservancy engineering three-dimensional model and the water level change index and the water conservancy abnormality index to a user through a visual interface.
In the embodiment, the water conservancy monitoring is helpful for providing comprehensive water conservancy data, a three-dimensional model is constructed for analysis and evaluation, the water conservancy abnormality index is calculated, an early warning notice is sent, and the water conservancy information is updated in real time and visually displayed. The water conservancy monitoring system has the advantages that accuracy, timeliness and effectiveness of water conservancy monitoring are improved, and management and protection work on a water conservancy system is enhanced.
In summary, the present application has at least the following effects:
through the water conservancy real-time monitoring method and system based on the GIS and BIM three-dimensional technology, the efficiency and accuracy of the hydraulic engineering can be improved, monitoring staff can be helped to grasp the water conservancy situation in time, appropriate measures are taken when abnormal situations occur, the occurrence of water conservancy disasters is reduced or avoided, the visual interface can better display the water conservancy situation, and a user can know more visual and comprehensive water conservancy information.

Claims (10)

the method comprises the steps of respectively importing preprocessed hydrologic geographic data and hydraulic engineering data into GIS and BIM software, carrying out geographic coding and spatial data analysis on the hydrologic geographic data by the GIS, generating digital expression of hydrologic geographic information, constructing a primary hydrologic geographic information three-dimensional model, carrying out digital modeling on the hydraulic engineering data by the BIM, constructing a primary hydraulic engineering three-dimensional model, carrying out format unification and standardization processing on the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model, and placing the primary hydrologic geographic information three-dimensional model and the primary hydraulic engineering three-dimensional model under the same coordinate system for spatial alignment and data interaction to form the hydrologic geographic information three-dimensional model and the hydraulic engineering three-dimensional model.
CN202311490221.7A2023-11-102023-11-10Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technologyActiveCN117236791B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202311490221.7ACN117236791B (en)2023-11-102023-11-10Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202311490221.7ACN117236791B (en)2023-11-102023-11-10Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology

Publications (2)

Publication NumberPublication Date
CN117236791Atrue CN117236791A (en)2023-12-15
CN117236791B CN117236791B (en)2024-03-08

Family

ID=89095165

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202311490221.7AActiveCN117236791B (en)2023-11-102023-11-10Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology

Country Status (1)

CountryLink
CN (1)CN117236791B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN118586873A (en)*2024-08-052024-09-03长春建业集团股份有限公司 A digital sand table display method and system based on intelligent monitoring
CN119180089A (en)*2024-11-262024-12-24安徽九凡工程设计咨询有限公司Digital visual display system for hydraulic engineering design
CN119514920A (en)*2024-10-182025-02-25中国长江电力股份有限公司 A method for predicting events affecting the operation of cascade reservoirs

Citations (14)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
KR20040083979A (en)*2003-03-262004-10-06농업기반공사System and method for managing the fresh lake using gis
KR20140067763A (en)*2012-11-272014-06-05한국지질자원연구원Methods for quantification and evaluation of groundwater quality grade by using statistical approaches
CN108681848A (en)*2018-08-252018-10-19黄河水利委员会黄河水利科学研究院One kind " Trinity " small reservoir or silt arrester flood season method for early warning
KR101912627B1 (en)*2017-05-302018-10-30에스지에이블록체인 주식회사Method for Integration Visualizing GIS based Runoff-Hydraulic Model Analysis result
CN208537536U (en)*2018-08-032019-02-22深圳市绿恩环保技术有限公司A kind of river water quality monitoring early-warning system
WO2019103246A1 (en)*2017-11-272019-05-31주식회사 지오그린21Method for evaluating degree of risk of underground water level in vicinity of underground oil storage cavern
CN110991688A (en)*2019-10-152020-04-10国网浙江省电力有限公司紧水滩水力发电厂 Early warning method of reservoir dispatching based on meteorological numerical forecast
CN111310976A (en)*2020-01-192020-06-19北京耘数科技有限责任公司Rapid water quality prediction early warning method and system based on distributed computation
CN112697197A (en)*2020-12-082021-04-23中水三立数据技术股份有限公司GIS (geographic information System) and BIM (building information modeling) fusion technology based porous flood gate visual management system and method
CN113434565A (en)*2021-03-152021-09-24中国电建集团华东勘测设计研究院有限公司Water conservancy flood control drought and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN114861252A (en)*2021-02-042022-08-05西安电子科技大学青岛计算技术研究院 A smart reservoir management system based on bim+gis technology and its realization method
CN114956311A (en)*2022-06-102022-08-30广州庄伟环保科技有限公司Intelligent platform for river and lake pollution control and control method thereof
CN116258608A (en)*2023-05-152023-06-13中铁水利信息科技有限公司Water conservancy real-time monitoring information management system integrating GIS and BIM three-dimensional technology
CN117007758A (en)*2023-07-032023-11-07河海大学Method for monitoring influence of rising and falling tide of tidal river on river water quality

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
KR20040083979A (en)*2003-03-262004-10-06농업기반공사System and method for managing the fresh lake using gis
KR20140067763A (en)*2012-11-272014-06-05한국지질자원연구원Methods for quantification and evaluation of groundwater quality grade by using statistical approaches
KR101912627B1 (en)*2017-05-302018-10-30에스지에이블록체인 주식회사Method for Integration Visualizing GIS based Runoff-Hydraulic Model Analysis result
WO2019103246A1 (en)*2017-11-272019-05-31주식회사 지오그린21Method for evaluating degree of risk of underground water level in vicinity of underground oil storage cavern
CN208537536U (en)*2018-08-032019-02-22深圳市绿恩环保技术有限公司A kind of river water quality monitoring early-warning system
CN108681848A (en)*2018-08-252018-10-19黄河水利委员会黄河水利科学研究院One kind " Trinity " small reservoir or silt arrester flood season method for early warning
CN110991688A (en)*2019-10-152020-04-10国网浙江省电力有限公司紧水滩水力发电厂 Early warning method of reservoir dispatching based on meteorological numerical forecast
CN111310976A (en)*2020-01-192020-06-19北京耘数科技有限责任公司Rapid water quality prediction early warning method and system based on distributed computation
CN112697197A (en)*2020-12-082021-04-23中水三立数据技术股份有限公司GIS (geographic information System) and BIM (building information modeling) fusion technology based porous flood gate visual management system and method
CN114861252A (en)*2021-02-042022-08-05西安电子科技大学青岛计算技术研究院 A smart reservoir management system based on bim+gis technology and its realization method
CN113434565A (en)*2021-03-152021-09-24中国电建集团华东勘测设计研究院有限公司Water conservancy flood control drought and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN114956311A (en)*2022-06-102022-08-30广州庄伟环保科技有限公司Intelligent platform for river and lake pollution control and control method thereof
CN116258608A (en)*2023-05-152023-06-13中铁水利信息科技有限公司Water conservancy real-time monitoring information management system integrating GIS and BIM three-dimensional technology
CN117007758A (en)*2023-07-032023-11-07河海大学Method for monitoring influence of rising and falling tide of tidal river on river water quality

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
GANG CHEN等: ""Development and application of a multi-centre cloud platform architecture or water environment management"", 《JOURNAL OF ENVIRONMENTAL MANAGEMENT》, vol. 344, 28 July 2023 (2023-07-28), pages 1 - 12*

Cited By (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN118586873A (en)*2024-08-052024-09-03长春建业集团股份有限公司 A digital sand table display method and system based on intelligent monitoring
CN119514920A (en)*2024-10-182025-02-25中国长江电力股份有限公司 A method for predicting events affecting the operation of cascade reservoirs
CN119180089A (en)*2024-11-262024-12-24安徽九凡工程设计咨询有限公司Digital visual display system for hydraulic engineering design
CN119180089B (en)*2024-11-262025-02-18安徽九凡工程设计咨询有限公司Digital visual display system for hydraulic engineering design

Also Published As

Publication numberPublication date
CN117236791B (en)2024-03-08

Similar Documents

PublicationPublication DateTitle
CN117236791B (en)Water conservancy real-time monitoring method and system based on GIS and BIM three-dimensional technology
CN103543706B (en)Drainage internet-of-things system
CN113434565A (en)Water conservancy flood control drought and waterlogging prevention comprehensive disaster reduction platform system based on CIM platform
CN104092297B (en)A kind of monitoring system and method for real-time monitoring network system runnability
CN102156413B (en)Emergency scheduling method and system thereof for urban multi-source raw water system
CN101183249A (en) A method for early warning of gas pipeline network accidents
CN117275188A (en)Mountain torrent disaster monitoring and early warning system and mountain torrent disaster monitoring and early warning method
CN113762796A (en) A dynamic risk map analysis method for rainstorm and flood in railway engineering facilities
CN112697197A (en)GIS (geographic information System) and BIM (building information modeling) fusion technology based porous flood gate visual management system and method
CN113837453A (en)Deep sewage drainage tunnel wisdom operation system
Vladeanu et al.Analysis of risk management methods used in trenchless renewal decision making
CN106229978B (en) Method and system for predicting low voltage problems in station areas
CN117314051A (en)Visual flood prevention emergency decision system
CN116527721A (en)Intelligent monitoring and diagnosis method for underground drainage pipe network
Piro et al.Smart and innovative systems for urban flooding risk management
Chen et al.Development and application of a multi-centre cloud platform architecture for water environment management
KR20220096880A (en)Integration system for sewerage pipe asset management utilizing web applications
CN115798155A (en) A natural gas measurement and analysis system
CN119918925A (en) An artificial intelligence-based risk prevention and control system for dangerous and major infrastructure projects
Dziedzic et al.A framework for asset management planning in sustainable and resilient cities
Zhou et al.Review of the development of hydrological data quality control in Typhoon Committee Members
Prairie et al.Natural flow and salt computation methods, calendar years 1971-1995
CN117893049A (en)Urban intelligent water affair early warning system and method integrating Internet of things and Internet
WuResearch and application of neural network‐based intelligent water‐saving systems
Wu et al.Establishing an implementation framework for dynamic carbon monitoring in the AEC industry

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp