Movatterモバイル変換


[0]ホーム

URL:


CN116493707A - High temperature resistant equipment for welding - Google Patents

High temperature resistant equipment for welding
Download PDF

Info

Publication number
CN116493707A
CN116493707ACN202310492572.5ACN202310492572ACN116493707ACN 116493707 ACN116493707 ACN 116493707ACN 202310492572 ACN202310492572 ACN 202310492572ACN 116493707 ACN116493707 ACN 116493707A
Authority
CN
China
Prior art keywords
pipe
air
welding
hollow
polytetrafluoroethylene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310492572.5A
Other languages
Chinese (zh)
Other versions
CN116493707B (en
Inventor
郭文丰
刘俊
张秀荣
张勤辉
刘冬飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Leneng Electric Power Co ltd
Original Assignee
Nantong Leneng Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Leneng Electric Power Co ltdfiledCriticalNantong Leneng Electric Power Co ltd
Priority to CN202310492572.5ApriorityCriticalpatent/CN116493707B/en
Publication of CN116493707ApublicationCriticalpatent/CN116493707A/en
Application grantedgrantedCritical
Publication of CN116493707BpublicationCriticalpatent/CN116493707B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Classifications

Landscapes

Abstract

The invention discloses high-temperature resistant equipment for welding, which relates to the technical field of high-temperature welding and comprises a base frame and a through pipe, wherein an air storage tank is fixedly arranged at the top of the base frame and comprises a main tank body, a pressure gauge, a safety protection device, an air inlet and an air outlet. This high temperature resistant equipment for welding is provided with coupling assembling, link firmly left ring flange and right ring flange through the binding bolt, realize preliminary connection and the fixed of barometer and polytetrafluoroethylene hard tube one, then through the aspiration pump, draw the inside air of protruding piece of hollow and hollow concave piece of connecting, make its inside vacuum, utilize the inside and outside air pressure difference that exists of hollow protruding piece of connecting and hollow concave piece, realize the inseparable laminating of both, seal the joint gap of left ring flange and right ring flange, the trachea after the improvement is not only convenient for the quick connect of trachea and air feed mechanism, and this connected mode does not have the poor problem of hookup location gas tightness, when making the protection gas pass through the hookup location, be difficult for appearing the gas leakage problem.

Description

Translated fromChinese
一种焊接用耐高温设备High temperature resistant equipment for welding

技术领域technical field

本发明涉及高温焊接技术领域,具体为一种焊接用耐高温设备。The invention relates to the technical field of high-temperature welding, in particular to high-temperature-resistant equipment for welding.

背景技术Background technique

焊接,也称作熔接,是一种以加热、高温或者高压的方式接合金属或其他热塑性材料如塑料的制造工艺及技术。现代焊接的能量来源有很多种,包括气体焰、电弧、激光、电子束、摩擦和超声波等。除了在工厂中使用外,焊接还可以在多种环境下进行,如野外、水下和太空。无论在何处,焊接都可能给操作者带来危险,所以在进行焊接时必须采取适当的防护措施。Welding, also known as welding, is a manufacturing process and technique that uses heat, high temperature, or pressure to join metal or other thermoplastic materials such as plastics. There are many sources of energy for modern welding, including gas flames, electric arcs, lasers, electron beams, friction, and ultrasound. In addition to its use in factories, welding can also be performed in a variety of environments, such as in the field, underwater and in space. Welding, wherever it occurs, can pose a hazard to the operator, so proper precautions must be taken when welding.

焊枪焊接结构件时,经常需要使用保护气将焊接位置与空气隔绝,以保证焊接质量。焊枪上设置有喷嘴,喷嘴通过管路与装有保护气的气罐连通,管路上设置电磁阀控制管路的连通或断开,气罐内的保护气压力大于大气压。电磁阀开启后,气罐内的保护气经管路流向喷嘴,从喷嘴喷出。焊接过程可以分为三个阶段:引弧阶段、主焊接阶段和回烧阶段,保护气体的状态直接影响到焊接电弧的状态,保护气体的状态包括保护气体的流量、压力、成分等;其中,气体流量根据焊接方法、焊接工艺规范、焊接材料等内容设定,保证焊接无气孔以及焊接过程的稳定。用于通保护气的管路通常称为气管,作为较为重要的零部件,必须拥有耐高温的特性,以适应焊接的高温环境,然而目前的耐高温设备(气管)依然存在以下不足:When the welding torch welds structural parts, it is often necessary to use shielding gas to isolate the welding position from the air to ensure the welding quality. The welding torch is provided with a nozzle, and the nozzle communicates with the gas tank containing the shielding gas through the pipeline, and a solenoid valve is set on the pipeline to control the connection or disconnection of the pipeline, and the pressure of the shielding gas in the gas tank is greater than atmospheric pressure. After the solenoid valve is opened, the protective gas in the gas tank flows to the nozzle through the pipeline, and is sprayed out from the nozzle. The welding process can be divided into three stages: the arc ignition stage, the main welding stage and the burn-back stage. The state of the shielding gas directly affects the state of the welding arc, and the state of the shielding gas includes the flow, pressure, composition, etc. of the shielding gas; among them, The gas flow rate is set according to the welding method, welding process specifications, welding materials, etc., to ensure that the welding has no pores and the stability of the welding process. The pipeline used to pass the shielding gas is usually called a gas pipe. As a relatively important component, it must have high temperature resistance to adapt to the high temperature environment of welding. However, the current high temperature resistant equipment (gas pipe) still has the following shortcomings:

首先,现有的气管在与供气机构进行对接时,通常使用螺丝实现气管端部与供气结构的固连,但该连接方式会存在连接位置的气密性差的问题,使得保护气通过连接位置时,出现漏气的问题;First of all, when the existing trachea is docked with the gas supply mechanism, screws are usually used to secure the end of the trachea to the gas supply structure. position, there is a problem of air leakage;

其次,现有的气管一般分为软管和硬管两种,软管便于焊枪操作,但连接位置容易出现松动问题,硬管则虽便于安装,接口位置稳定,但接口位置容易因焊枪焊接操作而拉扯断裂、崩坏。Secondly, the existing air pipes are generally divided into two types: flexible pipes and hard pipes. The flexible pipes are easy to operate with the welding torch, but the connection position is prone to loosening. And pulling, breaking, and collapsing.

因此,急需对此缺点进行改进,本发明则是针对现有的结构及不足予以研究改良,提供有一种焊接用耐高温设备。Therefore, it is urgent to improve this shortcoming. The present invention studies and improves the existing structure and deficiencies, and provides a kind of high temperature resistant equipment for welding.

发明内容Contents of the invention

本发明的目的在于提供一种焊接用耐高温设备,以解决上述背景技术中提出的问题。The object of the present invention is to provide a high temperature resistant equipment for welding to solve the problems raised in the above background technology.

为实现上述目的,本发明提供如下技术方案:一种焊接用耐高温设备,包括底座架和通管,所述底座架的顶部固定安装有储气罐,且储气罐包括有主罐体、压力表、安全保护装置、进气口和出气口,并且主罐体的外表面设置有压力表,而且主罐体的顶部固定安装有安全保护装置,所述主罐体的左侧设置有进气口,且主罐体的右侧设置有出气口,并且出气口连接有电磁阀,所述通管的一端与电磁阀相连,且通管的另一端与气压表相连,所述储气罐的底部连接有压力平衡组件,且压力平衡组件的一端与通管的顶部贯通相连,所述气压表的右侧固定连接有连接组件,且气压表通过连接组件连接有气管组件,并且气管组件的一端固定连接有焊枪。In order to achieve the above object, the present invention provides the following technical solutions: a high temperature resistant equipment for welding, including a base frame and a through pipe, the top of the base frame is fixedly installed with a gas storage tank, and the gas storage tank includes a main tank body, Pressure gauge, safety protection device, air inlet and air outlet, and the outer surface of the main tank is provided with a pressure gauge, and the top of the main tank is fixedly installed with a safety protection device, and the left side of the main tank is provided with an inlet Air port, and the right side of the main tank is provided with an air outlet, and the air outlet is connected with a solenoid valve, one end of the through pipe is connected with the solenoid valve, and the other end of the through pipe is connected with the air pressure gauge, the air storage tank The bottom of the pressure gauge is connected with a pressure balance assembly, and one end of the pressure balance assembly is connected through the top of the through pipe, the right side of the air pressure gauge is fixedly connected with a connection assembly, and the air pressure gauge is connected to the air pipe assembly through the connection assembly, and the air pipe assembly One end is fixedly connected with a welding torch.

进一步的,所述压力平衡组件包括有第一连管、压力平衡器、第二连管和压力平衡管,且第一连管的一端连接有压力平衡器,并且压力平衡器的顶部固定连接有第二连管,而且第二连管的顶端固定连接有压力平衡管,同时压力平衡管的一端与通管的外壁贯通相连。Further, the pressure balance assembly includes a first connection pipe, a pressure balancer, a second connection pipe and a pressure balance pipe, and one end of the first connection pipe is connected to a pressure balancer, and the top of the pressure balancer is fixedly connected to a The second connecting pipe, and the top end of the second connecting pipe is fixedly connected with a pressure balance pipe, and at the same time, one end of the pressure balancing pipe is connected through the outer wall of the through pipe.

进一步的,所述连接组件包括有左法兰盘和空心凸连件,且左法兰盘焊接在气压表的右侧,并且左法兰盘的内侧安装有空心凸连件,而且左法兰盘的内表面与空心凸连件的外表面固定连接并贴合。Further, the connection assembly includes a left flange and a hollow convex connector, and the left flange is welded on the right side of the barometer, and the inner side of the left flange is equipped with a hollow male connector, and the left flange The inner surface of the disc is fixedly connected with and attached to the outer surface of the hollow protrusion.

进一步的,所述连接组件还包括有抽气管、抽气泵和通气孔,且空心凸连件的一侧固定连接有抽气管,并且抽气管的端部固定连接有抽气泵,而且空心凸连件的另一侧开设有通气孔。Further, the connection assembly also includes a suction pipe, a suction pump and a vent hole, and one side of the hollow convex connector is fixedly connected with a suction pipe, and the end of the suction pipe is fixedly connected with a suction pump, and the hollow convex connection The other side is provided with ventilation holes.

进一步的,所述连接组件还包括有右法兰盘、空心凹连件和紧固栓,且右法兰盘焊接在气管组件的端部,并且右法兰盘的内表面与空心凹连件的外表面固定连接并贴合,而且右法兰盘的外壁通过螺纹连接有紧固栓,同时右法兰盘通过紧固栓与左法兰盘固定连接。Further, the connection assembly also includes a right flange, a hollow female connector and a fastening bolt, and the right flange is welded to the end of the air pipe assembly, and the inner surface of the right flange is connected to the hollow female connector The outer surface of the right flange is fixedly connected and bonded, and the outer wall of the right flange is connected with fastening bolts through threads, and at the same time, the right flange is fixedly connected with the left flange through the fastening bolts.

进一步的,所述空心凸连件与空心凹连件构成卡合结构,且空心凸连件的形状大小与空心凹连件的形状大小均相互匹配。Further, the hollow male connector and the hollow female connector form an engaging structure, and the shape and size of the hollow male connector and the hollow female connector match each other.

进一步的,所述气管组件包括有聚四氟乙烯软管、聚四氟乙烯硬管一、聚四氟乙烯硬管二、密封对接组件和卡合槽,且聚四氟乙烯软管的两端均连接有密封对接组件,并且聚四氟乙烯软管的一端通过密封对接组件固定连接有聚四氟乙烯硬管一,而且聚四氟乙烯软管的另一端通过密封对接组件固定连接有聚四氟乙烯硬管二,同时聚四氟乙烯硬管二的外壁开设有卡合槽。Further, the trachea assembly includes a polytetrafluoroethylene hose, a polytetrafluoroethylene hard tube one, a polytetrafluoroethylene hard tube two, a sealed butt joint assembly and an engaging groove, and the two ends of the polytetrafluoroethylene hose Both are connected with a sealed butt joint assembly, and one end of the polytetrafluoroethylene hose is fixedly connected to a polytetrafluoroethylene hard tube one through a sealed butt joint assembly, and the other end of the polytetrafluoroethylene hose is fixedly connected to a polytetrafluoroethylene tube through a sealed butt joint assembly The vinyl fluoride hard tube 2 is provided with an engaging groove on the outer wall of the polytetrafluoroethylene hard tube 2.

进一步的,所述密封对接组件包括有左连环、右连环、罩壳、连接块和连接栓,且左连环焊接在聚四氟乙烯软管的端部,并且左连环远离聚四氟乙烯软管的一侧连接有右连环,而且右连环焊接在聚四氟乙烯硬管二的端部,所述左连环和右连环的外部罩设有罩壳,且罩壳的外壁固定连接有连接块,并且连接块一侧通过螺纹连接有连接栓。Further, the sealing butt joint assembly includes a left link, a right link, a casing, a connecting block and a connecting bolt, and the left link is welded on the end of the polytetrafluoroethylene hose, and the left link is far away from the polytetrafluoroethylene hose One side of the right link is connected with a right link, and the right link is welded on the end of the polytetrafluoroethylene hard tube two, the outer cover of the left link and the right link is provided with a casing, and the outer wall of the casing is fixedly connected with a connecting block, And one side of the connection block is threadedly connected with a connection bolt.

进一步的,所述密封对接组件包括有卡环和橡胶套,且罩壳的内侧固定连接有卡环,并且卡环的外表面固定连接有橡胶套,而且橡胶套位于卡环和卡合槽之间。Further, the sealing butt joint assembly includes a snap ring and a rubber sleeve, and the inner side of the casing is fixedly connected with a snap ring, and the outer surface of the snap ring is fixedly connected with a rubber sleeve, and the rubber sleeve is located between the snap ring and the engaging groove between.

进一步的,所述焊接用耐高温设备的使用方法包括以下步骤:Further, the method for using the high temperature resistant equipment for welding includes the following steps:

A、通过紧固栓将左法兰盘和右法兰盘固连,实现气压表与聚四氟乙烯硬管一的初步连接和固定,然后通过抽气泵,对空心凸连件和空心凹连件内部空气进行抽取,使其内部真空,利用空心凸连件和空心凹连件内外存在的气压差,实现两者的紧密贴合,对左法兰盘和右法兰盘的连接间隙进行密封,完成气管组件与气压表的连接;A. Connect the left flange and the right flange through fastening bolts to realize the initial connection and fixation of the barometer and the PTFE hard pipe 1, and then use the air pump to connect the hollow convex connector and the hollow concave connector. The air inside the parts is extracted to make the inside vacuum, and the air pressure difference between the hollow convex connector and the hollow concave connector is used to realize the close fit of the two parts and seal the connection gap between the left flange and the right flange , to complete the connection between the air pipe assembly and the barometer;

B、启动电磁阀,使得储气罐内的保护气可通过管路通向焊枪上的喷嘴,并通过喷嘴喷出,操作人员手持焊枪开始焊接操作,喷嘴在焊接过程中不断喷出保护气,由于气管组件由聚四氟乙烯软管、聚四氟乙烯硬管一和聚四氟乙烯硬管二拼接组成,聚四氟乙烯软管的设计方便了焊枪的灵活使用,而聚四氟乙烯硬管一和聚四氟乙烯硬管二,则方便了气管组件与供气机构和焊枪相连接,并且软、硬管连接位置均设置有密封对接组件,利用连接栓将左连环和右连环限定在罩壳内部,对连接位置进行第一重密封,并通过卡环与卡合槽的卡合设计,减少连接块与聚四氟乙烯软管、聚四氟乙烯硬管二外壁的连接缝隙,且卡环外表面设置的橡胶套更能起到填充卡环与卡合槽连接缝隙的目的,对连接位置进行第二重密封,双重密封提升气管组件整体气密性;B. Start the solenoid valve so that the shielding gas in the gas storage tank can pass through the pipeline to the nozzle on the welding torch and spray out through the nozzle. The operator starts the welding operation with the welding torch in hand, and the nozzle continuously sprays out the shielding gas during the welding process. Since the gas pipe assembly is composed of PTFE hose, PTFE hard tube 1 and PTFE hard tube 2, the design of PTFE hose facilitates the flexible use of the welding torch, while the PTFE hard tube Pipe 1 and PTFE hard pipe 2 facilitate the connection of the air pipe assembly with the gas supply mechanism and the welding torch, and the connection positions of the soft and hard pipes are all provided with a sealed butt joint assembly, and the left connecting ring and the right connecting ring are limited by the connecting bolt. Inside the casing, the connection position is first sealed, and the joint design of the snap ring and the snap groove reduces the connection gap between the connection block and the second outer wall of the PTFE hose and PTFE hard tube, and The rubber sleeve provided on the outer surface of the snap ring can better serve the purpose of filling the connection gap between the snap ring and the snap groove, and perform a second seal on the connection position. The double seal improves the overall airtightness of the trachea assembly;

C、在焊接过程中,由于压力平衡器通过第一连管与储气罐构建连接,并通过第二连管和压力平衡管与通管构建连接,使得压力平衡器在检测出压力出现异常时,及时通过压力平衡管实现压力平衡操作,在压力平衡器检测到储气罐内气压大于通管内气压时,将通过气体补给,实现通管内增压,在检测到储气罐内气压低于通管内气压时,则通过气体抽排,实现通管内减压。C. During the welding process, since the pressure balancer is connected to the gas storage tank through the first connecting pipe, and is connected to the through pipe through the second connecting pipe and the pressure balance pipe, when the pressure balancer detects that the pressure is abnormal , Realize the pressure balance operation through the pressure balance tube in time. When the pressure balancer detects that the air pressure in the air storage tank is higher than the air pressure in the through pipe, it will use gas supply to realize the pressurization in the through pipe. When the pressure in the pipe is high, the pressure in the pipe is realized by pumping the gas.

本发明提供了一种焊接用耐高温设备,具备以下有益效果:The invention provides a high temperature resistant equipment for welding, which has the following beneficial effects:

1、本发明设置有连接组件,通过紧固栓将左法兰盘和右法兰盘固连,实现气压表与聚四氟乙烯硬管一的初步连接和固定,然后通过抽气泵,对空心凸连件和空心凹连件内部空气进行抽取,使其内部真空,利用空心凸连件和空心凹连件内外存在的气压差,实现两者的紧密贴合,对左法兰盘和右法兰盘的连接间隙进行密封,改进后的耐高温设备(气管)不仅便于气管与供气机构的快速连接,且该连接方式不存在连接位置气密性差的问题,使得保护气通过连接位置时,不易出现漏气的问题,从而有利于维持保护气的气压,使其喷出压强更加均匀可控。1. The present invention is provided with a connection assembly, and the left flange and the right flange are fixedly connected by fastening bolts to realize the initial connection and fixation of the barometer and the polytetrafluoroethylene hard pipe 1, and then through the air pump, the hollow The air inside the convex connector and the hollow female connector is extracted to make the interior vacuum, and the air pressure difference between the inside and outside of the hollow male connector and the hollow female connector is used to realize the close fit of the two. For the left flange and the right flange The connection gap of the blue plate is sealed, and the improved high-temperature-resistant equipment (gas pipe) not only facilitates the quick connection of the gas pipe and the gas supply mechanism, but also does not have the problem of poor air tightness at the connection position, so that when the shielding gas passes through the connection position, The problem of air leakage is not easy to occur, which is conducive to maintaining the air pressure of the protective gas and making the spray pressure more uniform and controllable.

2、本发明设置有气管组件,气管组件由聚四氟乙烯软管、聚四氟乙烯硬管一和聚四氟乙烯硬管二拼接组成,且聚四氟乙烯软管和聚四氟乙烯硬管一、聚四氟乙烯硬管一和聚四氟乙烯硬管二的连接位置均设置有密封对接组件,通过将左连环和右连环限定在罩壳内部,对连接位置进行第一重密封,并通过卡环与卡合槽的卡合设计,减少连接块与聚四氟乙烯软管、聚四氟乙烯硬管二外壁的连接缝隙,且卡环外表面设置的橡胶套更能起到填充卡环与卡合槽连接缝隙的目的,对连接位置进行第二重密封,改进后的耐高温设备(气管)通过软、硬管的拼接设计,克服了软、硬管各自存在的缺陷性,不仅便于焊枪的灵活使用,更通过接口位置的密封设计,避免接口位置出现松动或因焊枪焊接操作导致拉扯断裂、崩坏。2. The present invention is provided with a trachea assembly, and the trachea assembly is composed of a polytetrafluoroethylene hose, a polytetrafluoroethylene hard tube one and a polytetrafluoroethylene hard tube two, and the polytetrafluoroethylene hose and the polytetrafluoroethylene hard tube The connection positions of tube 1, PTFE hard tube 1 and PTFE hard tube 2 are all equipped with sealed butt joint components. By limiting the left connecting ring and right connecting ring inside the casing, the connecting position is first sealed. And through the clasp design of the clasp and the clasp groove, the connection gap between the connecting block and the outer wall of the PTFE hose and the PTFE hard tube is reduced, and the rubber sleeve provided on the outer surface of the clasp ring can better fill the gap. The purpose of the connection gap between the clasp ring and the snap groove is to perform a second seal on the connection position. The improved high-temperature-resistant equipment (trachea) overcomes the defects of the soft and hard pipes through the splicing design of the soft and hard pipes. Not only is it convenient for the flexible use of the welding torch, but also the sealing design of the interface position prevents the interface from loosening or being pulled, broken or collapsed due to the welding operation of the welding torch.

3、本发明设置有压力平衡组件,压力平衡器通过第一连管与储气罐构建连接,并通过第二连管和压力平衡管与通管构建连接,使得压力平衡器在检测出压力出现异常时,通过气体补给或气体抽排实现增减压,时通过压力平衡管实现储气罐和通管的压力平衡,改进后的耐高温设备(气管)具有平衡压力的功能,能在压力异常时进行自我调整,有利于提升储气罐的使用稳定性,从而有利于保证保护气的供气平稳,提升焊枪的焊接效果。3. The present invention is equipped with a pressure balance assembly, the pressure balancer is connected to the gas storage tank through the first connecting pipe, and is connected to the through pipe through the second connecting pipe and the pressure balance pipe, so that the pressure balancer detects that the pressure appears In case of abnormality, the increase and decrease of pressure can be realized through gas supply or gas exhaustion, and the pressure balance between the gas storage tank and the through pipe can be realized through the pressure balance pipe. The improved high temperature resistant equipment (trachea) has the function of balancing pressure and can Timely self-adjustment is conducive to improving the stability of the gas storage tank, thereby ensuring a stable gas supply of the shielding gas and improving the welding effect of the welding torch.

附图说明Description of drawings

图1为本发明一种焊接用耐高温设备的正视结构示意图;Fig. 1 is the front structural schematic diagram of a kind of welding high temperature resistant equipment of the present invention;

图2为本发明一种焊接用耐高温设备的左法兰盘-右法兰盘结构连接示意图;Fig. 2 is a schematic diagram of the connection between the left flange and the right flange of a high temperature resistant equipment for welding in the present invention;

图3为本发明一种焊接用耐高温设备的左法兰盘-右法兰盘正剖视结构示意图;Fig. 3 is a schematic diagram of the front sectional structure of the left flange plate-right flange plate of a kind of welding high temperature resistant equipment of the present invention;

图4为本发明一种焊接用耐高温设备的左法兰盘-右法兰盘结构拆分示意图;Fig. 4 is a schematic diagram of dismantling of the left flange-right flange structure of a high-temperature-resistant welding equipment of the present invention;

图5为本发明一种焊接用耐高温设备的左连环-右连环结构连接示意图;Fig. 5 is a schematic diagram of the connection of the left link-right link structure of a kind of welding high temperature resistant equipment of the present invention;

图6为本发明一种焊接用耐高温设备的密封对接组件结构拆分示意图。图中:1、底座架;2、储气罐;201、主罐体;202、压力表;203、安全保护装置;204、进气口;205、出气口;3、电磁阀;4、通管;5、气压表;6、压力平衡组件;601、第一连管;602、压力平衡器;603、第二连管;604、压力平衡管;7、连接组件;701、左法兰盘;702、空心凸连件;703、抽气管;704、抽气泵;705、通气孔;706、右法兰盘;707、空心凹连件;708、紧固栓;8、气管组件;801、聚四氟乙烯软管;802、聚四氟乙烯硬管一;803、聚四氟乙烯硬管二;804、密封对接组件;8041、左连环;8042、右连环;8043、罩壳;8044、连接块;8045、连接栓;8046、卡环;8047、橡胶套;805、卡合槽;9、焊枪。Fig. 6 is a schematic diagram of a disassembled structure of a sealed butt joint assembly of a high-temperature-resistant welding device according to the present invention. In the figure: 1, base frame; 2, gas storage tank; 201, main tank; 202, pressure gauge; 203, safety protection device; 204, air inlet; 205, air outlet; 3, solenoid valve; 4, through Tube; 5. Barometer; 6. Pressure balance assembly; 601. First connecting pipe; 602. Pressure balancer; 603. Second connecting pipe; 604. Pressure balancing tube; 7. Connection component; 701. Left flange ; 702, hollow convex connector; 703, exhaust pipe; 704, air pump; 705, air hole; 706, right flange; 707, hollow concave connector; 708, fastening bolt; PTFE hose; 802, PTFE hard tube 1; 803, PTFE hard tube 2; 804, sealing butt joint assembly; 8041, left link; 8042, right link; 8043, cover; 8044, Connection block; 8045, connection bolt; 8046, snap ring; 8047, rubber sleeve; 805, engaging groove; 9, welding torch.

具体实施方式Detailed ways

下面结合附图和实施例对本发明的实施方式作进一步详细描述。以下实施例用于说明本发明,但不能用来限制本发明的范围。Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but should not be used to limit the scope of the present invention.

如图1所示,一种焊接用耐高温设备,包括底座架1和通管4,底座架1的顶部固定安装有储气罐2,且储气罐2包括有主罐体201、压力表202、安全保护装置203、进气口204和出气口205,并且主罐体201的外表面设置有压力表202,而且主罐体201的顶部固定安装有安全保护装置203,主罐体201的左侧设置有进气口204,且主罐体201的右侧设置有出气口205,并且出气口205连接有电磁阀3,通管4的一端与电磁阀3相连,且通管4的另一端与气压表5相连,储气罐2的底部连接有压力平衡组件6,且压力平衡组件6的一端与通管4的顶部贯通相连,压力平衡组件6包括有第一连管601、压力平衡器602、第二连管603和压力平衡管604,且第一连管601的一端连接有压力平衡器602,并且压力平衡器602的顶部固定连接有第二连管603,而且第二连管603的顶端固定连接有压力平衡管604,同时压力平衡管604的一端与通管4的外壁贯通相连,通过设置的压力平衡器602和压力平衡管604,可在压力出现问题时,对压力进行平衡。As shown in Figure 1, a high temperature resistant equipment for welding includes a base frame 1 and a through pipe 4, an air storage tank 2 is fixedly installed on the top of the base frame 1, and the gas storage tank 2 includes a main tank body 201, a pressure gauge 202, safety protection device 203, air inlet 204 and air outlet 205, and the outer surface of main tank body 201 is provided with pressure gauge 202, and the top of main tank body 201 is fixedly installed with safety protection device 203, the main tank body 201 The left side is provided with an air inlet 204, and the right side of the main tank body 201 is provided with an air outlet 205, and the air outlet 205 is connected with a solenoid valve 3, and one end of the through pipe 4 is connected with the electromagnetic valve 3, and the other end of the through pipe 4 One end is connected to the barometer 5, the bottom of the gas storage tank 2 is connected to a pressure balance assembly 6, and one end of the pressure balance assembly 6 is connected to the top of the through pipe 4. The pressure balance assembly 6 includes a first connecting pipe 601, a pressure balance 602, the second connecting pipe 603 and the pressure balance pipe 604, and one end of the first connecting pipe 601 is connected with the pressure balancer 602, and the top of the pressure balancer 602 is fixedly connected with the second connecting pipe 603, and the second connecting pipe The top of 603 is fixedly connected with a pressure balance pipe 604, and at the same time, one end of the pressure balance pipe 604 is connected to the outer wall of the through pipe 4. By setting the pressure balancer 602 and the pressure balance pipe 604, the pressure can be adjusted when there is a problem with the pressure. balance.

如图1-图6所示,气压表5的右侧固定连接有连接组件7,连接组件7包括有左法兰盘701和空心凸连件702,且左法兰盘701焊接在气压表5的右侧,并且左法兰盘701的内侧安装有空心凸连件702,而且左法兰盘701的内表面与空心凸连件702的外表面固定连接并贴合,连接组件7还包括有抽气管703、抽气泵704和通气孔705,且空心凸连件702的一侧固定连接有抽气管703,并且抽气管703的端部固定连接有抽气泵704,而且空心凸连件702的另一侧开设有通气孔705,连接组件7还包括有右法兰盘706、空心凹连件707和紧固栓708,且右法兰盘706焊接在气管组件8的端部,并且右法兰盘706的内表面与空心凹连件707的外表面固定连接并贴合,通过设置的抽气泵704,对空心凸连件702和空心凹连件707内部空气进行抽取,使其内部真空,从而利用空心凸连件702和空心凹连件707内外存在气压差,实现两者的紧密贴合,而且右法兰盘706的外壁通过螺纹连接有紧固栓708,同时右法兰盘706通过紧固栓708与左法兰盘701固定连接,通过设置的紧固栓708,对左法兰盘701和右法兰盘706的连接关系进行锁定,空心凸连件702与空心凹连件707构成卡合结构,且空心凸连件702的形状大小与空心凹连件707的形状大小均相互匹配,卡合的设计,使得空心凸连件702和空心凹连件707在内部空气被抽取后,能够紧密贴合在一起,且气压表5通过连接组件7连接有气管组件8,气管组件8包括有聚四氟乙烯软管801、聚四氟乙烯硬管一802、聚四氟乙烯硬管二803、密封对接组件804和卡合槽805,且聚四氟乙烯软管801的两端均连接有密封对接组件804,并且聚四氟乙烯软管801的一端通过密封对接组件804固定连接有聚四氟乙烯硬管一802,而且聚四氟乙烯软管801的另一端通过密封对接组件804固定连接有聚四氟乙烯硬管二803,同时聚四氟乙烯硬管二803的外壁开设有卡合槽805,通过软、硬管的拼接设计,克服了软、硬管各自存在的缺陷性,密封对接组件804包括有左连环8041、右连环8042、罩壳8043、连接块8044和连接栓8045,且左连环8041焊接在聚四氟乙烯软管801的端部,并且左连环8041远离聚四氟乙烯软管801的一侧连接有右连环8042,而且右连环8042焊接在聚四氟乙烯硬管二803的端部,左连环8041和右连环8042的外部罩设有罩壳8043,且罩壳8043的外壁固定连接有连接块8044,并且连接块8044一侧通过螺纹连接有连接栓8045,密封对接组件804包括有卡环8046和橡胶套8047,且罩壳8043的内侧固定连接有卡环8046,并且卡环8046的外表面固定连接有橡胶套8047,而且橡胶套8047位于卡环8046和卡合槽805之间,通过将左连环8041和右连环8042限定在罩壳8043内部,实现连接位置的第一重密封,并通过卡环8046与卡合槽805的卡合设计,减少连接块8044与聚四氟乙烯软管801、聚四氟乙烯硬管二803外壁的连接缝隙,且卡环8046外表面设置的橡胶套8047更能起到填充卡环8046与卡合槽805连接缝隙的目的,实现了连接位置的第二重密封,并且气管组件8的一端固定连接有焊枪9。As shown in Figures 1-6, the right side of the barometer 5 is fixedly connected with a connection assembly 7, the connection assembly 7 includes a left flange 701 and a hollow convex connector 702, and the left flange 701 is welded on the barometer 5 and the inner side of the left flange 701 is equipped with a hollow protruding connecting piece 702, and the inner surface of the left flange 701 is fixedly connected and attached to the outer surface of the hollow protruding connecting piece 702, and the connecting assembly 7 also includes Air extraction pipe 703, air extraction pump 704 and vent hole 705, and one side of hollow protruding connecting piece 702 is fixedly connected with air extracting pipe 703, and the end of air extracting pipe 703 is fixedly connected with air extracting pump 704, and the other side of hollow convex connecting piece 702 One side is provided with a ventilation hole 705, and the connecting assembly 7 also includes a right flange 706, a hollow concave connecting piece 707 and a fastening bolt 708, and the right flange 706 is welded on the end of the air pipe assembly 8, and the right flange The inner surface of the disc 706 is fixedly connected and bonded to the outer surface of the hollow concave connecting piece 707, and the air inside the hollow convex connecting piece 702 and the hollow concave connecting piece 707 is sucked through the provided air pump 704 to make the inside vacuum, thereby There is an air pressure difference inside and outside the hollow convex connecting piece 702 and the hollow concave connecting piece 707 to realize the close fit of the two, and the outer wall of the right flange 706 is threaded with a fastening bolt 708, and the right flange 706 is connected by a fastening bolt 708 at the same time. The fastening bolt 708 is fixedly connected with the left flange 701, and the connection relationship between the left flange 701 and the right flange 706 is locked by the set fastening bolt 708, and the hollow male connecting piece 702 and the hollow concave connecting piece 707 constitute The shape and size of the hollow male connector 702 and the shape and size of the hollow female connector 707 match each other, and the design of the engagement makes the hollow male connector 702 and the hollow female connector 707, after the internal air is extracted, Can fit together tightly, and the barometer 5 is connected with the air pipe assembly 8 through the connection assembly 7, and the air pipe assembly 8 includes a polytetrafluoroethylene hose 801, a polytetrafluoroethylene hard pipe 802, a polytetrafluoroethylene hard pipe two 803, a sealing butt joint assembly 804 and an engaging groove 805, and both ends of the polytetrafluoroethylene hose 801 are connected to a sealing butt joint assembly 804, and one end of the polytetrafluoroethylene hose 801 is fixedly connected to a polytetrafluoroethylene hose 804 through a sealing butt joint assembly 804. Tetrafluoroethylene hard tube 1 802, and the other end of PTFE hose 801 is fixedly connected with PTFE hard tube 2 803 through the sealing butt joint assembly 804, and the outer wall of PTFE hard tube 2 803 is provided with a card The joint groove 805 overcomes the defects of the soft and hard pipes through the splicing design of the soft and hard pipes. The sealing butt joint assembly 804 includes a left connecting ring 8041, a right connecting ring 8042, a casing 8043, a connecting block 8044 and a connecting bolt 8045 , and the left link 8041 is welded to the end of the polytetrafluoroethylene hose 801, and the side of the left link 8041 away from the polytetrafluoroethylene hose 801 is connected to the right link 8042, and the right link 8042 is welded on the polytetrafluoroethylene hard At the end of the pipe 2 803, the outer cover of the left connecting ring 8041 and the right connecting ring 8042 is provided with a casing 8043, and the outer wall of the casing 8043 is fixedly connected with a connecting block 8044, and one side of the connecting block 8044 is threadedly connected with a connecting bolt 8045, The sealing docking assembly 804 includes a snap ring 8046 and a rubber sleeve 8047, and the inner side of the casing 8043 is fixedly connected with a snap ring 8046, and the outer surface of the snap ring 8046 is fixedly connected with a rubber sleeve 8047, and the rubber sleeve 8047 is located between the snap ring 8046 and Between the engaging grooves 805, the first sealing of the connecting position is realized by limiting the left connecting ring 8041 and the right connecting ring 8042 inside the casing 8043, and the connecting block is reduced through the engaging design of the snap ring 8046 and the engaging groove 805 The connection gap between 8044 and the Teflon hose 801 and Teflon hard tube two 803 outer walls, and the rubber sleeve 8047 provided on the outer surface of the snap ring 8046 can better fill the connection gap between the snap ring 8046 and the engaging groove 805 The purpose is to realize the second sealing of the connection position, and one end of the gas pipe assembly 8 is fixedly connected with the welding torch 9 .

综上,结合图1-图6所示,该焊接用耐高温设备的工作原理如下:首先,通过紧固栓708将左法兰盘701和右法兰盘706固连,实现气压表5与聚四氟乙烯硬管一802的初步连接和固定,然后通过抽气泵704,对空心凸连件702和空心凹连件707内部空气进行抽取,使其内部真空,利用空心凸连件702和空心凹连件707内外存在的气压差,实现两者的紧密贴合,对左法兰盘701和右法兰盘706的连接间隙进行密封,将气管组件8与气压表5连接完毕后,操作人员手持焊枪9开始焊接操作,同时启动电磁阀3,使得储气罐2内的保护气可通过管路通向焊枪9上的喷嘴,并通过喷嘴喷出,在焊接过程中喷出保护气;又因为气管组件8由聚四氟乙烯软管801、聚四氟乙烯硬管一802和聚四氟乙烯硬管二803拼接组成,聚四氟乙烯软管801的设计方便了焊枪9的灵活使用,而聚四氟乙烯硬管一802和聚四氟乙烯硬管二803,则方便了气管组件8与供气机构和焊枪9相连接,并且聚四氟乙烯软管801和聚四氟乙烯硬管一802、聚四氟乙烯硬管一802和聚四氟乙烯硬管二803的连接位置均设置有密封对接组件804,通过将左连环8041和右连环8042限定在罩壳8043内部,对连接位置进行第一重密封,并通过卡环8046与卡合槽805的卡合设计,减少连接块8044与聚四氟乙烯软管801、聚四氟乙烯硬管二803外壁的连接缝隙,且卡环8046外表面设置的橡胶套8047更能起到填充卡环8046与卡合槽805连接缝隙的目的,对连接位置进行第二重密封,通过上述零件的配合使用,使得聚四氟乙烯软管801、聚四氟乙烯硬管一802和聚四氟乙烯硬管二803整体气密性较好,保护气不易从连接位置泄出;在焊接过程中,由于压力平衡器602通过第一连管601与储气罐2构建连接,并通过第二连管603和压力平衡管604与通管4构建连接,使得压力平衡器602在检测出压力出现异常时,及时通过压力平衡管604实现压力平衡操作,具体操作是:在压力平衡器602检测到储气罐2内气压大于通管4内气压时,将通过气体补给,实现通管4内增压,在检测到储气罐2内气压低于通管4内气压时,则通过气体抽排,实现通管4内减压。In summary, as shown in Figures 1-6, the working principle of the high-temperature-resistant welding equipment is as follows: First, the left flange 701 and the right flange 706 are fixedly connected by fastening bolts 708 to realize the pressure gauge 5 and the right flange 706. Preliminary connection and fixation of the polytetrafluoroethylene hard tube-802, and then through the air pump 704, the air inside the hollow convex connector 702 and the hollow concave connector 707 is extracted to make the interior vacuum, and the hollow convex connector 702 and the hollow The air pressure difference between the inside and outside of the concave connector 707 realizes the close fit of the two, and seals the connection gap between the left flange 701 and the right flange 706. After the air pipe assembly 8 is connected to the barometer 5, the operator Start the welding operation with the welding torch 9 in hand, and start the solenoid valve 3 at the same time, so that the shielding gas in the gas storage tank 2 can lead to the nozzle on the welding torch 9 through the pipeline, and spray out through the nozzle, and spray the shielding gas during the welding process; Because the trachea assembly 8 is composed of a polytetrafluoroethylene flexible pipe 801, a polytetrafluoroethylene hard pipe 802 and a polytetrafluoroethylene hard pipe 2 803, the design of the polytetrafluoroethylene flexible pipe 801 facilitates the flexible use of the welding torch 9, And polytetrafluoroethylene hard pipe one 802 and polytetrafluoroethylene hard pipe two 803 make things convenient for air pipe assembly 8 to be connected with air supply mechanism and welding torch 9, and polytetrafluoroethylene flexible pipe 801 and polytetrafluoroethylene hard pipe One 802, Teflon hard tube one 802 and Teflon hard tube two 803 are all provided with a sealing butt joint assembly 804, by limiting the left connecting ring 8041 and the right connecting ring 8042 inside the casing 8043, the connecting position Perform the first seal, and reduce the connection gap between the connecting block 8044 and the outer wall of the PTFE hose 801 and the outer wall of the PTFE hard tube 803 through the engagement design of the snap ring 8046 and the snap groove 805, and the snap ring The rubber sleeve 8047 provided on the outer surface of the 8046 can better serve the purpose of filling the connection gap between the snap ring 8046 and the engaging groove 805, and perform a second seal on the connection position. Through the cooperative use of the above parts, the PTFE hose 801 , PTFE hard tube 1 802 and PTFE hard tube 2 803 have good overall air tightness, and the shielding gas is not easy to leak from the connection position; Establish a connection with the gas storage tank 2, and establish a connection with the through pipe 4 through the second connecting pipe 603 and the pressure balance pipe 604, so that when the pressure balancer 602 detects that the pressure is abnormal, it will realize the pressure balance operation through the pressure balance pipe 604 in time , the specific operation is: when the pressure balancer 602 detects that the air pressure in the air storage tank 2 is greater than the air pressure in the through pipe 4, it will supply gas to realize the pressurization in the through pipe 4, and when it detects that the air pressure in the air storage tank 2 is lower than When there is air pressure in the through pipe 4, the pressure in the through pipe 4 is realized through gas pumping.

本发明的实施例是为了示例和描述起见而给出的,而并不是无遗漏的或者将本发明限于所公开的形式。很多修改和变化对于本领域的普通技术人员而言是显而易见的。选择和描述实施例是为了更好说明本发明的原理和实际应用,并且使本领域的普通技术人员能够理解本发明从而设计适于特定用途的带有各种修改的各种实施例。The embodiments of the present invention have been presented for purposes of illustration and description, but are not intended to be exhaustive or to limit the invention to the form disclosed. Many modifications and changes will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to better explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention and design various embodiments with various modifications as are suited to the particular use.

Claims (10)

1. The utility model provides a high temperature resistant equipment for welding, includes base frame (1) and siphunculus (4), its characterized in that, the top fixed mounting of base frame (1) has gas holder (2), and gas holder (2) are including main jar body (201), manometer (202), safety arrangement (203), air inlet (204) and gas outlet (205), and the surface of main jar body (201) is provided with manometer (202), and the top fixed mounting of main jar body (201) has safety arrangement (203), the left side of main jar body (201) is provided with air inlet (204), and the right side of main jar body (201) is provided with gas outlet (205), and gas outlet (205) are connected with solenoid valve (3), the one end of siphunculus (4) links to each other with solenoid valve (3), and the other end of siphunculus (4) links to each other with barometer (5), the bottom of gas holder (2) is connected with pressure balance component (6), and the one end of pressure balance component (6) link up with the top of siphunculus (4), right side fixedly connected with air inlet (7) of barometer (5), and pneumatic component (7) are connected with air pipe (8) through connection component (8), and one end of the air pipe component (8) is fixedly connected with a welding gun (9).
7. The high temperature resistant device for welding according to claim 1, wherein the air pipe assembly (8) comprises a polytetrafluoroethylene hose (801), a polytetrafluoroethylene hard tube (802), a polytetrafluoroethylene hard tube two (803), a sealing butt joint assembly (804) and a clamping groove (805), both ends of the polytetrafluoroethylene hose (801) are connected with the sealing butt joint assembly (804), one end of the polytetrafluoroethylene hose (801) is fixedly connected with the polytetrafluoroethylene hard tube one (802) through the sealing butt joint assembly (804), the other end of the polytetrafluoroethylene hose (801) is fixedly connected with the polytetrafluoroethylene hard tube two (803) through the sealing butt joint assembly (804), and the clamping groove (805) is formed in the outer wall of the polytetrafluoroethylene hard tube two (803).
8. The high temperature resistant welding equipment according to claim 7, wherein the sealing butt joint assembly (804) comprises a left interlink (8041), a right interlink (8042), a housing (8043), a connecting block (8044) and a connecting bolt (8045), the left interlink (8041) is welded at the end part of the polytetrafluoroethylene hose (801), one side of the left interlink (8041) far away from the polytetrafluoroethylene hose (801) is connected with the right interlink (8042), the right interlink (8042) is welded at the end part of the polytetrafluoroethylene hard tube two (803), the outer covers of the left interlink (8041) and the right interlink (8042) are provided with the housing (8043), the outer wall of the housing (8043) is fixedly connected with the connecting block (8044), and one side of the connecting block (8044) is connected with the connecting bolt (8045) through threads.
A. the left flange plate (701) and the right flange plate (706) are fixedly connected through a fastening bolt (708), preliminary connection and fixation of the barometer (5) and a polytetrafluoroethylene hard tube I (802) are realized, then air in the hollow convex connecting piece (702) and the hollow concave connecting piece (707) is extracted through an air extracting pump (704), so that the air in the hollow convex connecting piece is vacuumized, the air pressure difference between the inside and the outside of the hollow convex connecting piece (702) and the air pressure difference between the inside and the outside of the hollow concave connecting piece (707) are utilized, the tight joint of the hollow convex connecting piece (702) and the air pressure difference between the inside and the outside of the hollow concave connecting piece is realized, the connection gap between the left flange plate (701) and the right flange plate (706) is sealed, and connection of an air pipe assembly (8) and the barometer (5) is completed;
B. starting the electromagnetic valve (3) to enable the shielding gas in the gas storage tank (2) to be led to a nozzle on the welding gun (9) through a pipeline, and being sprayed out through the nozzle, an operator holds the welding gun (9) to start welding operation, the nozzle continuously sprays the shielding gas in the welding process, as the gas pipe assembly (8) is formed by splicing a polytetrafluoroethylene hose (801), a polytetrafluoroethylene hard tube I (802) and a polytetrafluoroethylene hard tube II (803), the design of the polytetrafluoroethylene hose (801) facilitates flexible use of the welding gun (9), the polytetrafluoroethylene hard tube I (802) and the polytetrafluoroethylene hard tube II (803) facilitate connection of the gas pipe assembly (8) with a gas supply mechanism and the welding gun (9), the soft and hard tube connection positions are provided with sealing butt joint assemblies (804), the connecting bolts (8045) are utilized to limit the left connecting ring (8041) and the right connecting ring (8042) in the interior of a housing (8043), the connection positions are subjected to first resealing, the snap fit design of snap ring (8046) and a snap fit groove (805) is adopted, the snap fit design of the snap ring (8044) and the snap ring (8046) is reduced, the snap ring (8046) and the snap ring (8046) is more tightly connected with the outer surface of the snap ring (8046) and the snap ring (8046) is provided with the outer surface (8046), the double seal improves the integral air tightness of the air pipe assembly (8);
C. in the welding process, as the pressure balancer (602) is connected with the air storage tank (2) through the first connecting pipe (601) and is connected with the through pipe (4) through the second connecting pipe (603) and the pressure balancing pipe (604), when the pressure balancer (602) detects that the pressure is abnormal, the pressure balancing operation is realized through the pressure balancing pipe (604) in time, when the pressure balancer (602) detects that the air pressure in the air storage tank (2) is greater than the air pressure in the through pipe (4), the air supply is adopted to realize the pressurization in the through pipe (4), and when the air pressure in the air storage tank (2) is detected to be lower than the air pressure in the through pipe (4), the air pumping is adopted to realize the depressurization in the through pipe (4).
CN202310492572.5A2023-05-042023-05-04High temperature resistant equipment for weldingActiveCN116493707B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202310492572.5ACN116493707B (en)2023-05-042023-05-04High temperature resistant equipment for welding

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202310492572.5ACN116493707B (en)2023-05-042023-05-04High temperature resistant equipment for welding

Publications (2)

Publication NumberPublication Date
CN116493707Atrue CN116493707A (en)2023-07-28
CN116493707B CN116493707B (en)2025-06-24

Family

ID=87328105

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202310492572.5AActiveCN116493707B (en)2023-05-042023-05-04High temperature resistant equipment for welding

Country Status (1)

CountryLink
CN (1)CN116493707B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US3136879A (en)*1961-05-171964-06-09Wes Ind IncSelf-equalizing welding gun
CN201411181Y (en)*2009-06-232010-02-24郑州欧亚空气炮有限公司Fast reset-type air cannon of balance chamber pressurizing piston
CN213452835U (en)*2020-09-162021-06-15戴中仁Gas cylinder with pressure regulating system
CN115342299A (en)*2022-07-182022-11-15河南旭阳光电科技有限公司 Sulfur dioxide gas supply system
CN218638764U (en)*2022-10-212023-03-17唐山松下产业机器有限公司Welding trachea device and welding set

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US3136879A (en)*1961-05-171964-06-09Wes Ind IncSelf-equalizing welding gun
CN201411181Y (en)*2009-06-232010-02-24郑州欧亚空气炮有限公司Fast reset-type air cannon of balance chamber pressurizing piston
CN213452835U (en)*2020-09-162021-06-15戴中仁Gas cylinder with pressure regulating system
CN115342299A (en)*2022-07-182022-11-15河南旭阳光电科技有限公司 Sulfur dioxide gas supply system
CN218638764U (en)*2022-10-212023-03-17唐山松下产业机器有限公司Welding trachea device and welding set

Also Published As

Publication numberPublication date
CN116493707B (en)2025-06-24

Similar Documents

PublicationPublication DateTitle
CN110082036A (en)Tube body seam flange air-tightness detection device
CN211696835U (en) A pipeline leak detection tool
CN102091437A (en)High-vacuum low-temperature container molecular sieve adsorbing device and filling process thereof
CN116493707A (en) High temperature resistant equipment for welding
CN206787781U (en)A kind of vacuum sealing film test device suitable for superconduction proton precessional magnetometer
CN218760352U (en)Air pipe connector of inflation movement
CN205479430U (en)A valve of managing to find time for vacuum pipe evacuator
CN116066628A (en)Vacuumizing device with dynamic sealing mechanism
CN214666309U (en)Sleeve pipe head connecting structure of sleeve pipe type heat exchanger
CN216715518U (en)Sealing connecting pipe for vacuum helium leak detection device
CN216009846U (en)High-pressure double-wall pipe for diesel engine
CN214456855U (en)Miniature oxygenerator with detachable compressor
CN213982206U (en)Stainless steel diaphragm valve body for special gas
CN204164586U (en)A kind of pipeline argon filling seal arrangement and suction tude group thereof
CN210829699U (en)Connecting and fixing locking device for pneumatic diaphragm pump
CN208687152U (en)Assembling pipe joint
CN107030416A (en)It is a kind of to carry the sealing air supply system of vacuum and positive/negative-pressure
CN107084822A (en)A kind of vacuum sealing film test device suitable for superconduction proton precessional magnetometer
CN203585624U (en)Novel pipe connecting compression-resistant flange
CN217927661U (en)Vacuumizing assembly for vacuum test box
CN206936650U (en)A kind of sealing air supply system that can carry vacuum and positive/negative-pressure
CN216430060U (en)Blower motor casing
CN222800247U (en) Fuel tank helium detection tooling
CN222616295U (en) A high-pressure quick-connect connector resistant to strong acids and alkalis
CN217382106U (en)Connector with self-locking function

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant

[8]ページ先頭

©2009-2025 Movatter.jp