CN115759637A - Intelligent construction informatization integrated management platform - Google Patents

Intelligent construction informatization integrated management platform
Download PDF

Info

Publication number
CN115759637A
CN115759637ACN202211451861.2ACN202211451861ACN115759637ACN 115759637 ACN115759637 ACN 115759637ACN 202211451861 ACN202211451861 ACN 202211451861ACN 115759637 ACN115759637 ACN 115759637A
Authority
CN
China
Prior art keywords
construction
unit
cost
management
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211451861.2A
Other languages
Chinese (zh)
Inventor
郑元和
周永兵
郭正阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guohong Technology Co ltd
Original Assignee
Guohong Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guohong Technology Co ltdfiledCriticalGuohong Technology Co ltd
Priority to CN202211451861.2ApriorityCriticalpatent/CN115759637A/en
Publication of CN115759637ApublicationCriticalpatent/CN115759637A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Landscapes

Abstract

The invention discloses an intelligent construction informatization integrated management platform which comprises a main controller, a computer PC (personal computer) end, a mobile phone end and a cloud end, wherein a data center of the main controller is responsible for storing and sharing data, supporting lean management and control and comprehensive operation of a project layer, the main controller is connected with the computer PC end and the mobile phone end through a network, the main controller is connected with the cloud end network, the informatization integration degree is high, the information integration degree is high, the effectiveness is realized, the front and back data are continuous, the data correlation and the reliability are higher, through establishing a three-dimensional model, a progress plan and cost information integration (a 3D model, a progress plan and cost), the labor, materials and mechanical usage required in the construction process are simulated according to the progress plan, a cost plan and an analysis report form is automatically generated, when the actual cost exceeds the plan, the automatic early warning is realized, the report form supports layer-by-layer click tracing, and the holding performance is strong; and the full coverage high definition monitoring intelligently identifies unsafe behaviors, and issues are found to timely urge rectification and elimination of hidden dangers.

Description

Intelligent construction informatization integrated management platform
Technical Field
The invention mainly relates to the technical field of constructional engineering and information technology, in particular to an intelligent construction informatization integrated management platform.
Background
The intelligent construction technology is a product combining the vigorous development of the emerging information industry technologies of digital era big data, cloud computing, mobile internet, artificial intelligence, internet of things and the like with advanced and lean construction project management theoretical methods, is a high integration of construction engineering personnel, machinery, materials, technologies, management business system processes and data, manages the whole life cycle of construction projects from planning, designing to construction and operation and maintenance, promotes the digitization, the online and the intellectualization of the whole process, the whole elements and the whole participants of the construction projects, realizes the organic integration of digital science and technology and the construction industry, becomes a core engine for the transformation and upgrading of the construction industry, and establishes a brand new ecological system from the project department, enterprises to the construction industry; the building industry needs to get rid of the traditional extensive development mode and take a sustainable development way, a green building needs to be created by the deep integration of novel industrialization and informatization under the guidance of digital technology, the whole industrial chain of the building industry is updated, reformed and upgraded, and the digital construction is the inevitable direction of transformation and upgrade of the building industry.
The current building management mode has the following defects:
the resource is wasted, and a large amount of paper documents are needed; the resource planning is unreasonable, cost estimation is mostly carried out through estimation, so that the cost has large deviation, cost rise and personnel waste are caused, after information collection is finished, a large amount of time is spent manually for statistical analysis, and a large amount of time and labor are wasted; the intelligent technology of the construction site management has less application, poor integration level and inconvenient use; data are stored in a dispersed mode, an information island exists, and the data value is not effectively excavated and utilized; in the aspect of safety management, special equipment such as a tower crane and the like is more in investment, violation operation and irregular behaviors are generated occasionally, the supervision difficulty is high, and the risk is high; in the aspect of quality management, the construction site material management links are multiple, information exchange is not in place, materials have large and irreversible influence on quality, and traceability is not strong; in the aspects of construction and personnel management, a plurality of pollution sources are generated in a construction site, the difficulty in monitoring and treating the dust is high, the water and electricity consumption of the construction site is high, the management is extensive, the comprehensive utilization rate is low, and the resource waste is serious; the construction labor is large, the personnel structure is complex, the management links are many, the informatization application degree is low, and the management is not standard.
Disclosure of Invention
The invention mainly provides an intelligent construction informatization integrated management platform, which is used for solving the technical problems in the background technology.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the utility model provides an information-based integrated management platform is built to wisdom, includes main control unit, computer PC end, cell-phone end and high in the clouds, main control unit data center is responsible for the storage and the sharing of data, supports the lean management and control of project level and the integrated operation, main control unit with computer PC end network is connected, the cell-phone end with the main control unit network is connected, main control unit with the high in the clouds network is connected.
Preferably, the main controller comprises a construction project management module, a building cloud project management module and a smart construction site all-covering module, wherein the construction project management module comprises a visual modeling unit, a project amount counting unit, a safety quality management unit, a process library and pre-finishing unit, a progress management unit, a construction tracking unit, a labor and mechanical statistical analysis unit, a material query unit and a cost management unit.
Preferably, the building cloud project management module supplements technical management, risk management and control, cost management, completion management and archive management, and efficiently assists managers in comprehensively and comprehensively planning projects under construction, and the building cloud project management module comprises a technical management unit, a cost early warning management unit, a risk management unit, a completion management unit and an archive management unit.
Preferably, wisdom building site all standing module is including all standing high definition monitoring unit, power consumption monitoring unit, intelligent entrance guard's unit, tower crane safety monitoring unit and environmental monitoring unit.
Preferably, the visual modeling unit establishes a BIM three-dimensional model capable of assisting construction, visually performs construction management and drawing review, stores and uploads the three-dimensional model to the main controller, and the main controller stores and uploads data to a cloud;
each department of the engineering quantity statistical unit can synchronously calculate the area and the volume of each component and the engineering quantity of the reinforcing steel bars by carrying out BIM modeling according to the required quantity, thereby being beneficial to project organization planning and material preparation;
the mobile phone equipped by the on-site security personnel in the construction process of the safety quality management unit is used for photographing, writing and recording problems, positioning the problems to the positions where the problems occur, and issuing the problems to the responsible person and the participators to rectify the managers to track and urge the problems according to the positions where the problems occur;
the process library and each working procedure of the pre-finishing unit upload corresponding quality technical rules and construction method guidance, so that field management personnel can check technical background information, a component early warning function is used, quality control is enhanced, if the early warning range allows certain amount of deviation, early warning information is sent to the management personnel when the early warning range exceeds a value, and the construction condition of the component is concerned;
the technical responsible person sends construction tasks to the progress management unit every day, construction instructions are sent to the mobile phone ports of each person, the mobile phone end completes the tasks, actual information is uploaded to the main controller in time, data are uploaded and stored to the cloud end, the computer PC end browses the completed personnel and the completed conditions through the webpage end, and the tasks which are delayed or cannot be delayed are adjusted in time;
a tracking unit is constructed to preset a component tracking flow, a tracking plan can be listed according to the modes of a flowing water section, a single component and the like, the planned work is tracked to people, a technician inputs the actual starting time, the actual finishing time and a task tracking description of the self-tracked component on a component tracking interface at the mobile phone end, and the image data of the tracked component is reserved;
a computer PC (personal computer) end technician of the labor and machinery statistical analysis unit counts the labor and machinery shift quantity through a mobile phone end, specifically, each work type comprises time, a water flowing section, a partition division and the like, the labor work type, the number of people, the machinery quantity and the finished engineering quantity are collected, and whether the resource allocation is reasonable or not is analyzed;
the material inquiry unit compiles a contract pricing file according to drawing information, associates corresponding quota by using a national standard list, and then rapidly calculates the consumption of concrete and steel bars every week and every month according to a plan association model, reasonably and orderly arranges resource allocation, and prevents resource waste;
the cost management unit establishes integration of the three-dimensional model, the progress plan and the cost information (3D model + progress plan + cost), changes of the model engineering quantity drive changes of the cost information along with time, so that manual work, materials and mechanical use quantity required in the construction process can be simulated according to the progress plan, and contract, cost and settlement comparison is carried out by combining with the actual construction condition.
Preferably, the content of the technical management unit covers the management of a complete set of technical data of a project, including an engineering method, standards and specifications, examination and approval of construction organization, examination and approval of technical schemes, scientific and technological demonstration engineering and the like; forming an independent engineering method process library, a priority construction group design scheme library and a technical standard library of each project through aspects of science and technology, technical schemes, technical processes, technical training, technical analysis and the like;
the cost early warning management unit covers contents such as a cost target, total cost planning, monthly planning cost, cost adjustment, cost accounting, statistics and summarization, actual cost and the like, automatically generates a cost plan and actual cost comparison analysis report, and automatically warns when the actual cost exceeds the plan, and the report supports layer-by-layer click tracing;
the risk management unit carries out risk setting and prediction on capital balance, progress, contract, cost and the like, intelligently identifies risks, automatically carries out early warning according to relevant constraint relations, can independently set early warning values and early warning reminding ranges according to construction requirements of a construction site, and automatically reminds construction parts which are easy to go wrong aiming at project site quality safety inspection based on a big data technology;
after recording corresponding acceptance and transfer information, the completion management unit enters completion settlement, defect and warranty service support, the content includes various acceptance records, project assessment records, project quality approval, project summary and the like, and a whole set of completion data is packed and filed to form an independent project file;
the file management unit can self-define the filing information and multi-latitude catalog classification, realize filing, volume setting, file maintenance, borrowing, retrieval and query, realize the management of various multimedia files such as electronic drawings, images, video recording and the like, can be integrated with other modules, automatically files project files, searches by one key, and realizes the quick retrieval of any keywords of the files.
Preferably, the full-coverage high-definition monitoring unit supervises safe and quality construction of a construction site in an all-around manner without dead angles, intelligently identifies unsafe behaviors and transmits data to the cloud end, and a responsible person at the PC end finds a problem, supervises and corrects the problem in time to eliminate hidden dangers, prevents violation behaviors, simultaneously grasps the progress condition of a project, and coordinates and commands remotely; a tower crane safety monitoring system is introduced into a tower crane safety monitoring unit project, and when the tower crane is overloaded or overrun, a sound and light alarm is given out to remind people operating and controlling the tower crane to be overloaded.
Preferably, the power consumption monitoring unit is to the power consumption safety problem of camp, and each project widely uses power consumption monitored control system, real time monitoring construction area, living area cable run residual current and circuit temperature to send data and receive alarm information for the cell-phone end, in time handle the power consumption safety problem, ensure camp power consumption safety.
Preferably, the import of intelligent entrance guard unit engineering building site is set up chip response access control system, and through chip statistics business turn over personnel's quantity and work kind on the imported LED screen of engineering building site of demonstration on the response safety helmet to can fix a position each personnel's of engineering building site the inside positional information in real time, all personnel all adopt face identification entrance guard, and the control of strict real-name system is realized.
Preferably, the environmental monitoring unit realizes that building site raise dust monitoring, on-site environmental noise monitoring, building site microclimate meteorological parameter monitoring, the supplementary judgement that exceeds standard, the warning suggestion that exceeds standard, utilize pollution sources on-line monitoring appearance, including particulate matter concentration monitor, meteorological five parameter monitor, noise monitoring appearance etc. realize carrying out continuous automatic on-line monitoring to particulate matter concentration, meteorological parameter, noise and on-site video.
Compared with the prior art, the invention has the beneficial effects that:
according to the problems in the background art, the method and the device have the advantages of high informatization integration degree, effectiveness, continuous front and back data, high data correlation and reliability, capability of acquiring monitoring data in real time on line, safety and stability;
the construction drawing is really restored and examined through a BIM three-dimensional model, each department carries out quantity lifting according to needs through the BIM modeling construction drawing, the area and the volume of each component and the engineering quantity of the reinforcing steel bar are calculated, project organization planning and material preparation are facilitated, a planning part carries out lower settlement and upper pricing through the model, resource waste is prevented, contract pricing documents are compiled according to drawing information, corresponding quota is associated by using a national standard list, the consumption of concrete and the consumption of the reinforcing steel bar in each week and each month are rapidly calculated according to a plan association model, resource allocation is reasonably and orderly arranged, and resource waste is prevented;
the method comprises the steps of establishing integration of a three-dimensional model, a progress plan and cost information (a 3D model, a progress plan and cost), driving the change of the cost information along with the change of model engineering quantity along with the lapse of time, so that the amount of labor, materials and machinery used in the construction process can be simulated according to the progress plan, contract, cost and settlement comparison is carried out according to the actual construction condition, a cost plan and actual cost comparison analysis report is automatically generated, when the actual cost exceeds the plan, automatic early warning is carried out, the report supports layer by layer click tracing, and the method is high in holding performance;
the full-coverage high-definition monitoring intelligent identification of unsafe behaviors, and the responsible personnel find problems and timely supervise rectification and elimination of hidden dangers and prevent violation behaviors.
The invention will be explained in detail below with reference to the drawings and specific embodiments.
Drawings
FIG. 1 is a block diagram of the overall system of the present invention;
FIG. 2 is an overall system flow diagram of the present invention;
FIG. 3 is a diagram of the main controller system of the present invention.
Description of the drawings: 1. a main controller; 11. a visual modeling unit; 12. a project amount statistical unit; 13. a security quality management unit; 14. a process library and a pre-integration unit; 15. a progress management unit; 16. constructing a tracking unit; 17. a labor and machinery statistical analysis unit; 18. a material inquiry unit; 19. a cost management unit; 2. a PC terminal of the computer; 20. a technology management unit; 21. a cost early warning management unit; 22. a risk management unit; 23. a completion management unit; 24. a file management unit; 25. a full-coverage high-definition monitoring unit; 26. an electricity consumption monitoring unit; 27. an intelligent access control unit; 28. a tower crane safety monitoring unit; 29. an environment monitoring unit; 3. and (6) a mobile phone end.
Detailed Description
In order that the invention may be more fully understood, reference will now be made to the accompanying drawings, which form a part hereof, and in which is shown by way of illustration, various embodiments of the invention which may be practiced in different forms and not limited to the embodiments described herein, but on the contrary, the embodiments are provided so as to provide a more thorough and complete disclosure of the invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may be present, and when an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present, as the terms "vertical", "horizontal", "left", "right" and the like are used herein for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the knowledge of the terms used herein in the specification of the present invention is for the purpose of describing particular embodiments and is not intended to limit the present invention, and the term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
All electrical components in the embodiment are controlled by a conventional controller.
Please refer to fig. 1-3, which illustrates an intelligent construction information-based integrated management platform, comprising amain controller 1, aPC terminal 2, amobile phone terminal 3 and a cloud terminal, wherein the model of themain controller 1 is "6ES7331-7HF01-0AB0", the data center of themain controller 1 is responsible for data storage and sharing, supporting lean management and control and integrated operation of a project layer, themain controller 1 is connected with thePC terminal 2, themobile phone terminal 3 is connected with themain controller 1, and themain controller 1 is connected with the cloud terminal network.
Please refer to fig. 2 and 3, themain controller 1 includes a construction project management module, a building cloud project management module and a smart site full coverage module, the construction project management module includes avisual modeling unit 11, a projectquantity statistics unit 12, a safetyquality management unit 13, a process library andpre-arrangement unit 14, aprogress management unit 15, aconstruction tracking unit 16, a labor force and machinerystatistics analysis unit 17, amaterial query unit 18 and acost management unit 19; the construction cloud project management module supplements technical management, risk management and control, cost management, completion management and file management and efficiently assists managers in comprehensively and comprehensively planning projects under construction, and comprises atechnical management unit 20, a cost earlywarning management unit 21, arisk management unit 22, acompletion management unit 23 and afile management unit 24; wisdom building site all standing module is including all standing highdefinition monitor unit 25, powerconsumption monitor unit 26, intelligent entrance guard'sunit 27, tower cranesafety monitoring unit 28 andenvironmental monitoring unit 29.
It should be noted that, in this embodiment, each module is mutually matched, and the informationization integration degree is high, has the actual effect, and the front and back data is continuous, and data correlation, reliability are higher, can gather monitoring data on line in real time, and safety and stability are.
Please refer to fig. 3, the visual modeling unit 11 establishes a BIM three-dimensional model capable of assisting construction, visually performs construction management and drawing review, stores and uploads the three-dimensional model to the main controller 1, and the main controller 1 stores and uploads data to the cloud; the project quantity statistical unit 12 can synchronously calculate the area and the volume of each component and the project quantity of the reinforcing steel bars by carrying out BIM modeling and quantity increase according to needs, is favorable for project organization planning and material preparation, and has the advantages that the project quantity is extracted by a planning part through a model, lower settlement is carried out, upper pricing is carried out, and resource waste is prevented; the mobile phone equipped by the on-site security personnel in the construction process of the safety quality management unit 13 is used for photographing, writing and recording problems, positioning the problems to the positions where the problems occur, and sending the problems to the responsible person and the participators to rectify and manage the problems according to the positions where the problems occur so as to track and prompt the problems; the process library and the pre-finishing unit 14 uploads corresponding quality technical rules and construction method instructions in each process, so that field management personnel can check technical background information, use the early warning function of the component, strengthen quality control, and send early warning information to the management personnel when the early warning range is exceeded and the construction condition of the component is concerned if the early warning range allows a certain amount of deviation; the daily work content of the progress management unit 15 is sent to a construction task by a technical responsible person, a construction instruction is sent to the mobile phone end 3 port of each person, the mobile phone end 3 finishes the task, uploads actual information to the main controller 1 in time and uploads data to the cloud end, the PC end 2 finishes the task and finishes the task by browsing through a webpage end, and the task which is delayed or cannot be delayed is adjusted in time; the construction tracking unit 16 is preset with a component tracking flow, a tracking plan can be listed according to the mode of a flowing water section, a single component and the like, the planned work is tracked to people, a technician inputs the actual starting time, the actual finishing time and a task tracking description of the tracked component at a component tracking interface of the mobile phone end 3, and the image data of the tracked component is stored; a computer PC end 2 technician of the labor and machine statistical analysis unit 17 counts the labor and machine shift quantity through a mobile phone end 3, specifically, the labor, the number of people, the machine quantity and the finished engineering quantity are summarized and whether the resource allocation is reasonable or not is analyzed when each work type including time, a water flow section, a partition division and the like is reached; the material inquiry unit 18 compiles a contract pricing file according to drawing information, associates corresponding quota by using a national standard list, and then rapidly calculates the consumption of concrete and steel bars every week and every month according to a plan association model, reasonably and orderly arranges resource allocation, and prevents resource waste; the cost management unit 19 establishes an integrated 3D model of a three-dimensional model, a progress plan and cost information, the progress plan and the cost, and changes of model engineering quantity along with the time to drive the change of cost information, so that the manual work, material and mechanical use quantity required in the construction process can be simulated according to the progress plan, and contract, cost and settlement comparison is performed by combining with the actual construction condition; the technical management unit 20 covers the management of a complete set of technical data of a project, including an engineering method, standards and specifications, examination and approval of construction organization, examination and approval of technical schemes, scientific and technological demonstration engineering and the like; forming an independent engineering method process library, a priority construction group design scheme library and a technical standard library of each project through aspects of science and technology, technical schemes, technical processes, technical training, technical analysis and the like; the cost early warning management unit 21 covers contents such as a cost target, total cost planning, monthly planning cost, cost adjustment, cost accounting, statistics and summarization, actual cost and the like, automatically generates a comparative analysis report of the cost plan and the actual cost, and automatically warns when the actual cost exceeds the plan, and the report supports layer-by-layer click tracing; the risk management unit 22 carries out risk setting and prediction on capital balance, progress, contract, cost and the like, intelligently identifies risks, automatically carries out early warning according to relevant constraint relations, can independently set early warning values and early warning reminding ranges according to construction requirements of a construction site, and automatically reminds construction parts which are easy to go wrong aiming at project site quality safety inspection based on a big data technology; the completion management unit 23 records corresponding acceptance and transfer information, and then enters completion settlement, defect and warranty service support, the content includes various acceptance records, project check records, project quality verification, project summary and the like, and a complete set of completion data is packed and filed to form an independent project file; the file management unit 24 can self-define the classification of filing information and multi-latitude catalogues, realize filing, volume filing, file maintenance, borrowing, retrieval and query, realize the management of various multimedia files such as electronic drawings, images, video and the like, can be integrated with other modules, automatically file project files, search by one key and realize the quick retrieval of any keywords of the files; the full-coverage high-definition monitoring unit 25 supervises safety and quality construction of a construction site in an all-around and dead-angle-free manner, intelligently identifies unsafe behaviors and transmits data to the cloud, and a person in charge of the computer PC end 2 finds a problem, supervises and urges rectification and elimination of hidden dangers in time, prevents violation behaviors, grasps the progress condition of a project, and coordinates and commands remotely; a tower crane safety monitoring system is introduced into the tower crane safety monitoring unit 28, and when the tower crane is overloaded or overrun, a sound and light alarm is given out to remind people operating and controlling the tower crane to be overloaded; the power utilization monitoring unit 26 is used for monitoring the residual current and the line temperature of the cable lines of the construction area and the living area in real time by widely using a power utilization monitoring system for each project aiming at the power utilization safety problem of the camp area, sending data to the mobile phone end 3 for receiving alarm information, and timely processing the power utilization safety problem to ensure the power utilization safety of the camp area; the intelligent access control unit 27 is provided with a chip sensing access control system at the entrance of the engineering site, counts the number and work types of people entering and exiting through a chip on a sensing safety helmet and displays the number and work types on an imported LED screen of the engineering site, can position the position information of all people in the engineering site in real time, and adopts face recognition access control for all people to strictly implement real-name monitoring; the environment monitoring unit 29 realizes the site raise dust monitoring, the site environment noise monitoring, the site microclimate meteorological parameter monitoring, the overproof auxiliary judgment, the overproof alarm prompt and the utilization of pollution source on-line monitoring instruments, and comprises a particulate matter concentration monitoring instrument, a meteorological five-parameter monitoring instrument, a noise monitoring instrument and the like, so that the continuous automatic on-line monitoring on the particulate matter concentration, the meteorological parameters, the noise and the site video is realized.
It should be noted that, in this embodiment, the construction drawing is truly restored and reviewed through the BIM three-dimensional model, each department carries out quantity improvement as required through the BIM modeling construction drawing, the area and the volume of each component and the engineering quantity of the steel bars are calculated, project organization planning and material preparation are facilitated, the planning part carries out the engineering quantity extraction through the model, lower settlement and upper pricing are carried out, resource waste is prevented, contract pricing files are compiled according to drawing information, corresponding quota is associated by using a national standard list, and then the usage amount of concrete and steel bars in each week and each month is rapidly calculated according to a plan association model, resource allocation is reasonably and orderly arranged, and resource waste is prevented; the method comprises the steps of establishing a three-dimensional model, a progress plan and a cost information integrated 3D model + the progress plan + the cost, driving the change of the cost information along with the change of model engineering quantity along with the lapse of time, simulating the amount of manpower, materials and machinery used in the construction process according to the progress plan, comparing the contract, the cost and the settlement according to the practical construction situation, automatically generating a cost plan and practical cost comparison analysis report, automatically early warning when the practical cost exceeds the plan, enabling the report to support layer-by-layer click tracing, being strong in holding performance, fully covering high-definition monitoring and intelligently identifying unsafe behaviors, and leading responsible personnel to find problems, timely supervising, correcting and eliminating hidden dangers and stopping illegal behaviors.
The specific process of the invention is as follows:
the construction workers at the mobile phone end 3 log in information, the responsible workers at the PC end 2 log in background information, a data center of the main controller 1 is responsible for storing and sharing data and supporting lean management and comprehensive operation of a project layer, the responsible workers at the PC end 2 upload construction management and drawing review and storage of a real-time reduced BIM three-dimensional model to the main controller 1, the main controller 1 uploads the data storage to a cloud end, the construction workers at the mobile phone end 3 can synchronously calculate the area, the volume and the engineering quantity of reinforcing steel bars by looking up the BIM three-dimensional model construction management and the drawing inside the cloud end through BIM modeling according to the required quantity of each department, the project organization planning is facilitated, material preparation is facilitated, the planning department extracts the engineering quantity through the model, calculates the area, the volume and the engineering quantity of the reinforcing steel bars, calculates the lower settlement and upper price, prevents resource waste, a contract price file is compiled according to a contract price file, a corresponding fixed model is associated with a bid list, the project planning is further calculated according to the model, the concrete allocation quantity is calculated according to a monthly and the concrete allocation quantity, and the resource waste is prevented, and the resource allocation is reasonably arranged; the full-coverage high-definition monitoring unit 25 supervises safety quality construction of a construction site in all directions without dead angles, intelligently identifies unsafe behaviors and transmits data to the cloud, and a responsible person of the computer PC end 2 finds a problem and supervises and urges rectification and elimination of hidden dangers in time, prevents violation behaviors, grasps engineering progress conditions, and conducts in a remote coordination and commanding mode.
The invention is described above with reference to the accompanying drawings, it is obvious that the invention is not limited to the above-described embodiments, and it is within the scope of the invention to adopt such insubstantial modifications of the inventive method concept and solution, or to apply the inventive concept and solution directly to other applications without modification.

Claims (10)

7. The intelligent construction informatization integrated management platform according to claim 4, characterized in that the full-coverage high-definition monitoring unit (25) supervises the safe quality construction of a construction site in an all-around and dead-corner-free manner, intelligently identifies unsafe behaviors and transmits data to the cloud, and a responsible person at the PC (2) finds problems, supervises and corrects the problems in time to eliminate hidden dangers, prevents violation behaviors, and simultaneously grasps the progress of engineering, coordinates and commands remotely; a tower crane safety monitoring system is introduced into a tower crane safety monitoring unit (28) project, and when the tower crane is overloaded or overrun, a sound-light alarm is given out to remind people operating the tower crane to overload.
CN202211451861.2A2022-11-212022-11-21Intelligent construction informatization integrated management platformPendingCN115759637A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202211451861.2ACN115759637A (en)2022-11-212022-11-21Intelligent construction informatization integrated management platform

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202211451861.2ACN115759637A (en)2022-11-212022-11-21Intelligent construction informatization integrated management platform

Publications (1)

Publication NumberPublication Date
CN115759637Atrue CN115759637A (en)2023-03-07

Family

ID=85333408

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202211451861.2APendingCN115759637A (en)2022-11-212022-11-21Intelligent construction informatization integrated management platform

Country Status (1)

CountryLink
CN (1)CN115759637A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN116451979A (en)*2023-06-152023-07-18河北建工集团有限责任公司Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN118552893A (en)*2024-05-202024-08-27中国通信建设第三工程局有限公司 A remote management system for construction sites of communication engineering
CN118627849A (en)*2024-08-082024-09-10浙江大学长三角智慧绿洲创新中心 Pharmaceutical lean production management process automation robot system and method
CN118898334A (en)*2024-07-092024-11-05天津彬兴达建筑机械有限公司 A construction progress supervision method and system based on BIM
CN120046933A (en)*2025-02-242025-05-27四川工商学院Engineering information query method and system based on Internet of things

Cited By (6)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN116451979A (en)*2023-06-152023-07-18河北建工集团有限责任公司Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN116451979B (en)*2023-06-152023-08-18河北建工集团有限责任公司Intelligent construction integrated collaboration platform and method based on artificial intelligence
CN118552893A (en)*2024-05-202024-08-27中国通信建设第三工程局有限公司 A remote management system for construction sites of communication engineering
CN118898334A (en)*2024-07-092024-11-05天津彬兴达建筑机械有限公司 A construction progress supervision method and system based on BIM
CN118627849A (en)*2024-08-082024-09-10浙江大学长三角智慧绿洲创新中心 Pharmaceutical lean production management process automation robot system and method
CN120046933A (en)*2025-02-242025-05-27四川工商学院Engineering information query method and system based on Internet of things

Similar Documents

PublicationPublication DateTitle
CN115759637A (en)Intelligent construction informatization integrated management platform
CN115860499B (en) A Coordinated Construction Management System for Multi-Professional Work Types Based on BIM Technology
CN114386774B (en)CPIM-based three-dimensional visual full-life-cycle management platform for coal preparation plant
CN111126838B (en)Intelligent engineering management system
CN109978409B (en) A multi-engineering enterprise-level smart construction site blockchain management method
CN112163747A (en)Construction engineering project quality management system
CN111861358A (en) A building information integration platform based on BIM technology
CN113902237A (en)On-site operation risk management and control system
CN109557934B (en)Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN111144836A (en)Smart building integrated collaborative big data platform
CN113112233A (en)BIM-based intelligent management method and platform for full life cycle of wind power project
CN118552138A (en)Digital twin center construction method, system, equipment and storage medium
CN113962660B (en)Construction worker behavior safety management correction method and system based on AI technology
CN113034311A (en)Building construction supervision system and method based on BIM
CN104809591A (en)Electric power construction engineering supervision mechanism based on big data
CN117829754B (en)Intelligent engineering construction whole process number management method and platform based on BIM and GIS
CN110930025A (en)Project management system for engineering construction
CN111401853A (en)Intelligent construction project management system based on BIM
CN110137940A (en)A kind of intelligent electric power managing and control system based on mobile visualization
CN118134070A (en)Management and control sub-platform of main coal flow transportation system of coal mine
Cao et al.A digital twin (DT) framework at design and construction phases
CN116611684A (en)Dynamic evaluation system and method for engineering project security risk
CN120338695A (en) A railway construction safety management system based on the global linkage system
CN111383061A (en)BIM model-based engineering budget estimate planning method
CN111626575A (en)Construction safety quality hidden danger management method based on internet environment

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination