Fixed-point grouting and sealing method for complex structural stratum of underground coal mine
Download PDF

Info

Publication number
CN114961636A
CN114961636ACN202210706334.5ACN202210706334ACN114961636ACN 114961636 ACN114961636 ACN 114961636ACN 202210706334 ACN202210706334 ACN 202210706334ACN 114961636 ACN114961636 ACN 114961636A
Authority
CN
China
Prior art keywords
grouting
rubber plug
sealing
packing device
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210706334.5A
Other languages
Chinese (zh)
Other versions
CN114961636B (en
Inventor
孙利海
李彦明
潘小叶
徐树斌
李称心
李克松
郭昆明
杜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Research Institute Co LtdfiledCriticalCCTEG Chongqing Research Institute Co Ltd
Priority to CN202210706334.5ApriorityCriticalpatent/CN114961636B/en
Publication of CN114961636ApublicationCriticalpatent/CN114961636A/en
Application grantedgrantedCritical
Publication of CN114961636BpublicationCriticalpatent/CN114961636B/en
Activelegal-statusCriticalCurrent
Anticipated expirationlegal-statusCritical

Links

Images

Classifications

Landscapes

Abstract

Translated fromChinese

本发明涉及一种煤矿井下复杂构造地层定点注浆封固方法,属于煤矿机械领域,包括以下步骤:S1:装配封隔装置:将由安全接头、胶塞座、压差滑套、封隔器及坐封滑套顺次组装的放至预定孔段;S2:封隔装置坐封:泵入高压清水驱动封隔器张开完成封隔装置与钻孔壁之间环形区域的封固;S3:注浆作业:通过封隔装置开设的注浆通道注入;S4:清洗注浆材料:投放胶塞清洗注浆材料;S5:退钻:不同孔深配置的加固材料侯凝时间内,退出钻具;依次通过封隔装置坐封、注浆作业、清洗注浆材料、退钻,提高了注浆压力、注浆效果以及注浆效率,稳定性好、安全性高,能保证定点注浆加固。

Figure 202210706334

The invention relates to a fixed-point grouting and sealing method for complex structural strata in a coal mine, belonging to the field of coal mine machinery. The setting sliding sleeves are assembled in sequence and placed in the predetermined hole section; S2: Packing device setting: pump high-pressure clean water to drive the packer to open to complete the sealing of the annular area between the packing device and the borehole wall; S3: Grouting operation: inject through the grouting channel opened by the packing device; S4: Cleaning the grouting material: Putting a rubber plug to clean the grouting material; S5: Drilling out: Reinforcement materials with different hole depths are configured to exit the drilling tool within the waiting time The grouting pressure, grouting effect and grouting efficiency are improved through the packing device setting, grouting operation, cleaning grouting material, and drilling in sequence, with good stability and high safety, and can ensure fixed-point grouting reinforcement.

Figure 202210706334

Description

Translated fromChinese
一种煤矿井下复杂构造地层定点注浆封固方法A fixed-point grouting sealing method for complex structural strata in underground coal mines

技术领域technical field

本发明属于煤矿机械领域,涉及一种煤矿井下复杂构造地层定点注浆封固方法。The invention belongs to the field of coal mine machinery, and relates to a fixed-point grouting and sealing method for complex structural strata in a coal mine.

背景技术Background technique

我国煤矿地质条件复杂,井下钻孔施工过程中经常钻遇断层、陷落柱等构造破碎地层,在构造破碎地层中钻进时容易出现塌孔、卡钻和抱钻等情况,导致成孔性差、成孔深度浅以及孔内事故等问题,虽然近年来各科研院所经过技术攻关,形成了诸如开分支绕开破碎地层、大倾角穿越破碎地层、分段扩孔钻进、复合定向钻进、下套管护孔以及注水泥浆加固等工艺,但均未能有效解决复杂地层深孔定向钻进遇到的难题。The geological conditions of coal mines in my country are complex. During the construction of underground drilling, structural fractured strata such as faults and collapsed columns are often drilled. When drilling in the structurally fractured strata, hole collapse, sticking, and drilling are prone to occur, resulting in poor porosity, In recent years, various scientific research institutes have made technical breakthroughs, such as opening branches to bypass broken strata, crossing broken strata with large dip angles, segmented hole reaming drilling, compound directional drilling, etc. The technologies such as casing casing protection and cement slurry reinforcement have failed to effectively solve the problems encountered in deep hole directional drilling in complex formations.

近年来逐渐采用注浆加固技术解决构造破碎地层浅孔钻进难的问题,其主要有两种注浆方式,即全孔段注浆加固技术以及局部注浆加固技术,其中全孔段注浆直接在孔口进行封闭并注入注浆材料,存在适应孔段较短、注浆材料浪费大以及注浆加固效果差的问题,而目前局部注浆技术不适用于长钻孔领域的注浆加固,在实际使用中,当钻孔较长时,其封孔器注浆管与高压胶管会在狭小的钻孔中相互缠绕打结,导致爆管事故发生,且在封孔器和高压胶管下放过程中容易磨损封孔器以及高压胶管,容易导致漏浆以及注浆失败,存在注浆孔段短、注浆压力较小以及地层加固效果差等问题。In recent years, grouting reinforcement technology has been gradually adopted to solve the problem of difficult drilling of shallow holes in structurally broken strata. There are mainly two grouting methods, namely full-hole section grouting reinforcement technology and local grouting reinforcement technology. Among them, full-hole section grouting technology Directly sealing the orifice and injecting grouting material has the problems of short adaptable hole section, large waste of grouting material and poor grouting reinforcement effect. However, the current local grouting technology is not suitable for grouting reinforcement in the field of long drilling. , In actual use, when the hole is long, the grouting pipe of the hole sealer and the high-pressure hose will be entangled with each other in the narrow hole, resulting in a pipe burst accident. During the process, it is easy to wear the hole sealer and the high-pressure hose, which can easily lead to grouting leakage and grouting failure. There are problems such as short grouting hole section, low grouting pressure and poor formation reinforcement effect.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本发明为了解决目前煤矿井下深孔定点注浆存在注浆压力低、注浆效果差以及注浆效率低问题,提供一种煤矿井下复杂构造地层定点注浆封固方法。In view of this, in order to solve the problems of low grouting pressure, poor grouting effect and low grouting efficiency in fixed-point grouting of deep holes in coal mines at present, the present invention provides a fixed-point grouting and sealing method for complex structural strata in coal mines.

为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种煤矿井下复杂构造地层定点注浆封固方法,包括以下步骤:A method for fixed-point grouting and sealing of complex structural strata in a coal mine, comprising the following steps:

S1:装配封隔装置:将由安全接头、胶塞座、压差滑套、封隔器及坐封滑套顺次组装的放至预定孔段;S1: Assemble the packing device: put the safety joint, rubber plug seat, differential pressure sliding sleeve, packer and setting sliding sleeve assembled in sequence to the predetermined hole section;

S2:封隔装置坐封:泵入高压清水驱动封隔器张开完成封隔装置与钻孔壁之间环形区域的封固;S2: Packing device setting: pump high-pressure clean water to drive the packer to open to complete the sealing of the annular area between the packing device and the borehole wall;

S3:注浆作业:通过封隔装置开设的注浆通道注入;S3: Grouting operation: inject through the grouting channel opened by the packing device;

S4:清洗注浆材料:投放胶塞清洗注浆材料;S4: Cleaning and grouting material: put rubber stopper to clean and grouting material;

S5:退钻:不同孔深配置的加固材料侯凝时间内,退出钻具。S5: Retraction: Reinforcement materials with different hole depths are configured to exit the drilling tool within the holding time.

进一步,步骤S1中安全接头外接注浆钻杆与钻机。Further, in step S1, the safety joint is externally connected to the grouting drill pipe and the drilling rig.

进一步,步骤S2中封隔器张开完成封固后,继续憋压至坐封滑套打开。Further, after the packer is opened to complete the sealing in step S2, the pressure is continued until the setting sliding sleeve is opened.

进一步,步骤S3中注浆通道外接注浆管柱。Further, in step S3, the grouting channel is externally connected to a grouting pipe string.

进一步,步骤S4中胶塞进入胶塞座后顶替结束。Further, in step S4, the replacement ends after the rubber stopper enters the rubber stopper seat.

进一步,当胶塞顺利进入胶塞座:通过钻机后退注浆管柱一定距离带动封隔器泄压收缩,最后回收封隔装置;当胶塞不能顺利进入胶塞座:继续升压至压差滑套泄压阀打开,保障胶塞顶替顺利进入胶塞座,注浆材料顶替干净。Further, when the rubber plug smoothly enters the rubber plug seat: the grouting pipe string is driven back by the drilling rig for a certain distance to drive the packer to relieve pressure and shrink, and finally the packing device is recovered; when the rubber plug cannot smoothly enter the rubber plug seat: continue to increase the pressure until the pressure difference The sliding sleeve pressure relief valve is opened to ensure that the rubber plug is replaced smoothly into the rubber plug seat, and the grouting material is replaced cleanly.

进一步,步骤S5中,当退钻过程中封隔装置回收顺利:钻机后退注浆管柱一定距离,带动封隔器泄压收缩,回收封隔装置;当退钻过程中封隔装置回收遇阻:通过钻机正转注浆管柱数圈,带动安全接头正旋转,然后后退注浆管柱,安全接头脱开,从而回收注浆管柱,封隔装置则留在孔内。Further, in step S5, when the packing device is recovered smoothly during the withdrawal process: the drilling rig retreats a certain distance from the grouting pipe string to drive the packer to relieve pressure and shrink, and the packing device is recovered; when the recovery of the packing device is blocked during the withdrawal process : The grouting pipe string is rotated forward by the drilling rig several times to drive the safety joint to rotate forward, and then the grouting pipe string is retreated, the safety joint is disengaged, and the grouting pipe string is recovered, and the packing device is left in the hole.

本发明的有益效果在于:The beneficial effects of the present invention are:

1、本发明所公开的煤矿井下复杂构造地层定点注浆封固方法,依次通过封隔装置坐封、注浆作业、清洗注浆材料、退钻,提高了注浆压力、注浆效果以及注浆效率,稳定性好、安全性高,能保证定点注浆加固。1. The fixed-point grouting and sealing method for underground complex structures in coal mines disclosed in the present invention improves grouting pressure, grouting effect and injection rate by setting the packing device, grouting operation, cleaning grouting materials, and withdrawing drilling in sequence. It has high grouting efficiency, good stability and high safety, and can ensure fixed-point grouting reinforcement.

2、本发明所公开的煤矿井下复杂构造地层定点注浆封固方法,退钻过程中,确保回收注浆管柱,节约了成本。2. The fixed-point grouting and sealing method for underground complex structures in a coal mine disclosed in the present invention ensures that the grouting pipe string is recovered during the drilling withdrawal process, thereby saving costs.

本发明的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书来实现和获得。Other advantages, objects, and features of the present invention will be set forth in the description that follows, and will be apparent to those skilled in the art based on a study of the following, to the extent that is taught in the practice of the present invention. The objectives and other advantages of the present invention may be realized and attained by the following description.

附图说明Description of drawings

为了使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明作优选的详细描述,其中:In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be preferably described in detail below with reference to the accompanying drawings, wherein:

图1为本发明煤矿井下复杂构造地层定点注浆封固方法中封隔装置的结构示意图。Fig. 1 is a schematic structural diagram of the packing device in the fixed-point grouting and sealing method of the underground complex structure stratum in the coal mine of the present invention.

附图标记:安全接头1、胶塞座2、压差滑套3、封隔器4、坐封滑套5。Reference numerals:safety joint 1,rubber plug seat 2, differentialpressure sliding sleeve 3,packer 4, setting slidingsleeve 5.

具体实施方式Detailed ways

以下通过特定的具体实例说明本发明的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本发明的其他优点与功效。本发明还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本发明的精神下进行各种修饰或改变。需要说明的是,以下实施例中所提供的图示仅以示意方式说明本发明的基本构想,在不冲突的情况下,以下实施例及实施例中的特征可以相互组合。The embodiments of the present invention are described below through specific specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the drawings provided in the following embodiments are only used to illustrate the basic idea of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.

其中,附图仅用于示例性说明,表示的仅是示意图,而非实物图,不能理解为对本发明的限制;为了更好地说明本发明的实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。Among them, the accompanying drawings are only used for exemplary description, and represent only schematic diagrams, not physical drawings, and should not be construed as limitations of the present invention; in order to better illustrate the embodiments of the present invention, some parts of the accompanying drawings will be omitted, The enlargement or reduction does not represent the size of the actual product; it is understandable to those skilled in the art that some well-known structures and their descriptions in the accompanying drawings may be omitted.

本发明实施例的附图中相同或相似的标号对应相同或相似的部件;在本发明的描述中,需要理解的是,若有术语“上”、“下”、“左”、“右”、“前”、“后”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此附图中描述位置关系的用语仅用于示例性说明,不能理解为对本发明的限制,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar components; in the description of the present invention, it should be understood that if there are terms “upper”, “lower”, “left” and “right” , "front", "rear" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must be It has a specific orientation, is constructed and operated in a specific orientation, so the terms describing the positional relationship in the accompanying drawings are only used for exemplary illustration, and should not be construed as a limitation of the present invention. situation to understand the specific meaning of the above terms.

如图1所示的一种煤矿井下复杂构造地层定点注浆封固方法,包括以下步骤:As shown in Figure 1, a fixed-point grouting and sealing method for complex structural strata in a coal mine includes the following steps:

S1:装配封隔装置:将由安全接头1、胶塞座2、压差滑套3、封隔器4及坐封滑套5顺次组装的放至预定孔段;安全接头外接注浆钻杆与钻机。S1: Assemble the packing device: put thesafety joint 1, therubber plug seat 2, the differentialpressure sliding sleeve 3, thepacker 4 and thesetting sliding sleeve 5 assembled in sequence to the predetermined hole section; the safety joint is connected to the external grouting drill pipe with rig.

S2:封隔装置坐封:泵入高压清水驱动封隔器4张开完成封隔装置与钻孔壁之间环形区域的封固;封隔器4张开完成封固后,继续憋压至坐封滑套5打开。S2: Packer setting: Pump high-pressure clean water to drivePacker 4 to open to complete the sealing of the annular area between the packer and the borehole wall; afterPacker 4 is opened to complete sealing, continue to hold pressure until Thesetting slip 5 is opened.

S3:注浆作业:通过封隔装置开设的注浆通道注入;注浆通道外接注浆管柱。S3: Grouting operation: inject through the grouting channel opened by the packing device; the grouting channel is connected to a grouting pipe string.

S4:清洗注浆材料:投放胶塞清洗注浆材料;胶塞进入胶塞座2后顶替结束;S4: Cleaning the grouting material: put the rubber stopper to clean the grouting material; the rubber stopper enters therubber stopper seat 2 and the replacement ends;

当胶塞顺利进入胶塞座2:通过钻机后退注浆管柱一定距离带动封隔器4泄压收缩,最后回收封隔装置;当胶塞不能顺利进入胶塞座2:继续升压至压差滑套3泄压阀打开,保障胶塞顶替顺利进入胶塞座2,注浆材料顶替干净。When the rubber plug smoothly enters the rubber plug seat 2: the grouting pipe string is driven back by the drilling rig for a certain distance to relieve the pressure of thepacker 4, and finally the packing device is recovered; when the rubber plug cannot smoothly enter the rubber plug seat 2: continue to increase the pressure to The differential slidingsleeve 3 pressure relief valve is opened to ensure that the rubber plug can be replaced smoothly into therubber plug seat 2, and the grouting material can be replaced cleanly.

S5:退钻:不同孔深配置的加固材料侯凝时间内,退出钻具;当退钻过程中封隔装置回收顺利:钻机后退注浆管柱一定距离,带动封隔器4泄压收缩,回收封隔装置;当退钻过程中封隔装置回收遇阻:通过钻机正转注浆管柱数圈,带动安全接头1正旋转,然后后退注浆管柱,安全接头1脱开,从而回收注浆管柱,封隔装置则留在孔内。S5: Retraction: Reinforcement materials with different hole depths are configured to exit the drilling tool within the waiting time; when the packer is recovered smoothly during the drill-out process: the drilling rig retreats the grouting string for a certain distance, which drives thepacker 4 to relieve pressure and shrink. Recover the packing device; when the recovery of the packing device is blocked during the drilling withdrawal process: the drilling rig rotates the grouting pipe string forward several times, driving thesafety joint 1 to rotate forward, and then retreats the grouting pipe string, and thesafety joint 1 is disengaged, thereby recovering The pipe string is grouted, and the packing device is left in the hole.

最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be Modifications or equivalent replacements, without departing from the spirit and scope of the technical solution, should all be included in the scope of the claims of the present invention.

Claims (7)

Translated fromChinese
1.一种煤矿井下复杂构造地层定点注浆封固方法,其特征在于,包括以下步骤:1. a fixed-point grouting and sealing method for complex structural strata in a coal mine, is characterized in that, comprises the following steps:S1:装配封隔装置:将由安全接头、胶塞座、压差滑套、封隔器及坐封滑套顺次组装的放至预定孔段;S1: Assemble the packing device: put the safety joint, rubber plug seat, differential pressure sliding sleeve, packer and setting sliding sleeve assembled in sequence to the predetermined hole section;S2:封隔装置坐封:泵入高压清水驱动所述封隔器张开完成封隔装置与钻孔壁之间环形区域的封固;S2: Packing device setting: pump high-pressure clean water to drive the packer to open to complete the sealing of the annular area between the packing device and the borehole wall;S3:注浆作业:通过所述封隔装置开设的注浆通道注入;S3: Grouting operation: inject through the grouting channel opened by the packing device;S4:清洗注浆材料:投放所述胶塞清洗注浆材料;S4: cleaning grouting material: put the rubber plug cleaning grouting material;S5:退钻:不同孔深配置的加固材料侯凝时间内,退出钻具。S5: Retraction: Reinforcement materials with different hole depths are configured to exit the drilling tool within the holding time.2.如权利要求1所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,所述步骤S1中安全接头外接注浆钻杆与钻机。2 . The method for fixed-point grouting and sealing of complex structures in underground coal mines according to claim 1 , wherein in the step S1 , the safety joint is externally connected to a grouting drill pipe and a drilling rig. 3 .3.如权利要求1所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,所述步骤S2中封隔器张开完成封固后,继续憋压至坐封滑套打开。3 . The method for fixed-point grouting and sealing of complex structures in underground coal mines according to claim 1 , wherein, in the step S2 , after the packer is opened to complete the sealing, the pressure is continued to be held until the setting sliding sleeve is opened. 4 .4.如权利要求1所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,所述步骤S3中注浆通道外接注浆管柱。4 . The method for fixed-point grouting and sealing of complex structures in underground coal mines according to claim 1 , wherein in the step S3 , the grouting channel is externally connected to a grouting pipe string. 5 .5.如权利要求1所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,所述步骤S4中胶塞进入胶塞座后顶替结束。5 . The method for fixed-point grouting and sealing of complex structural strata in a coal mine as claimed in claim 1 , characterized in that, in the step S4 , the replacement ends after the rubber plug enters the rubber plug seat. 6 .6.如权利要求5所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,当所述胶塞顺利进入胶塞座:通过钻机后退注浆管柱一定距离带动封隔器泄压收缩,最后回收封隔装置;当胶塞不能顺利进入胶塞座:继续升压至压差滑套泄压阀打开,保障胶塞顶替顺利进入胶塞座,注浆材料顶替干净。6. The method for fixed-point grouting and sealing of complex structures in underground coal mines as claimed in claim 5, characterized in that, when the rubber plug smoothly enters the rubber plug seat: the grouting pipe string is driven back by the drilling rig for a certain distance to drive the packer to leak. Compression and contraction, and finally recover the packing device; when the rubber plug cannot enter the rubber plug seat smoothly: continue to increase the pressure until the differential pressure sliding sleeve relief valve is opened to ensure that the rubber plug is replaced smoothly into the rubber plug seat, and the grouting material is replaced cleanly.7.如权利要求1所述的煤矿井下复杂构造地层定点注浆封固方法,其特征在于,所述步骤S5中,当退钻过程中封隔装置回收顺利:钻机后退注浆管柱一定距离,带动封隔器泄压收缩,回收封隔装置;当退钻过程中封隔装置回收遇阻:通过钻机正转注浆管柱数圈,带动安全接头正旋转,然后后退注浆管柱,安全接头脱开,从而回收注浆管柱,封隔装置则留在孔内。7. The method for fixed-point grouting and sealing of complex structural strata in a coal mine as claimed in claim 1, wherein in the step S5, the packing device is recovered smoothly during the drilling withdrawal process: the drilling rig retreats the grouting pipe string a certain distance , drive the packer to release pressure and shrink, and recover the packer device; when the packer device is blocked during the withdrawal process: the drilling rig rotates the grouting pipe string forward several times to drive the safety joint to rotate forward, and then retreats the grouting pipe string. The safety joint is disengaged, thereby recovering the grouting string, and the packer is left in the hole.
CN202210706334.5A2022-06-212022-06-21 A fixed-point grouting sealing method for complex structural strata in underground coal minesActiveCN114961636B (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202210706334.5ACN114961636B (en)2022-06-212022-06-21 A fixed-point grouting sealing method for complex structural strata in underground coal mines

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202210706334.5ACN114961636B (en)2022-06-212022-06-21 A fixed-point grouting sealing method for complex structural strata in underground coal mines

Publications (2)

Publication NumberPublication Date
CN114961636Atrue CN114961636A (en)2022-08-30
CN114961636B CN114961636B (en)2023-09-01

Family

ID=82970872

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202210706334.5AActiveCN114961636B (en)2022-06-212022-06-21 A fixed-point grouting sealing method for complex structural strata in underground coal mines

Country Status (1)

CountryLink
CN (1)CN114961636B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN118653782A (en)*2024-07-082024-09-17淮北矿业股份有限公司 A local grouting device and grouting method for downhole inclined drilling

Citations (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US6120214A (en)*1999-01-202000-09-19Layne Christensen CompanyProcess for constructing reinforced subterranean columns
CN101761319A (en)*2009-12-292010-06-30中国石油天然气集团公司Method for injecting injection fluid by outside-tube chemical packer
CN202140062U (en)*2011-06-302012-02-08中国石油集团川庆钻探工程有限公司Hydraulic drilling-free tail pipe suspension packer
CN202194613U (en)*2011-06-302012-04-18中国石油集团川庆钻探工程有限公司Hydraulic drilling-free suspension packer
CN102635327A (en)*2012-04-012012-08-15天地科技股份有限公司Grouting method and system of cracked coal rock mass
KR20150005054A (en)*2013-07-042015-01-14이광익Tunnel grouting reinforcement method
CN204532233U (en)*2015-01-042015-08-05中国石油天然气股份有限公司Well cementation tubular column combination
CN109296337A (en)*2018-10-192019-02-01东营百华石油技术开发有限公司Full-bore exempts to bore plug hook-up for cementing
CN111472717A (en)*2020-04-242020-07-31中煤科工集团重庆研究院有限公司Fixed-point reinforcing method for long borehole in coal mine
CN113107418A (en)*2021-03-252021-07-13中煤科工集团西安研究院有限公司Sectional pressure-maintaining grouting device and method for horizontal drilling of coal seam floor aquifer
CN113309487A (en)*2021-05-242021-08-27中煤科工集团西安研究院有限公司Recoverable fixed-point grouting device and method for directional long drilling hole in underground coal mine
CN113494264A (en)*2021-07-092021-10-12中煤科工集团西安研究院有限公司Water-resisting layer reinforced grouting transformation device and method based on staged fracturing

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
US6120214A (en)*1999-01-202000-09-19Layne Christensen CompanyProcess for constructing reinforced subterranean columns
CN101761319A (en)*2009-12-292010-06-30中国石油天然气集团公司Method for injecting injection fluid by outside-tube chemical packer
CN202140062U (en)*2011-06-302012-02-08中国石油集团川庆钻探工程有限公司Hydraulic drilling-free tail pipe suspension packer
CN202194613U (en)*2011-06-302012-04-18中国石油集团川庆钻探工程有限公司Hydraulic drilling-free suspension packer
CN102635327A (en)*2012-04-012012-08-15天地科技股份有限公司Grouting method and system of cracked coal rock mass
KR20150005054A (en)*2013-07-042015-01-14이광익Tunnel grouting reinforcement method
CN204532233U (en)*2015-01-042015-08-05中国石油天然气股份有限公司Well cementation tubular column combination
CN109296337A (en)*2018-10-192019-02-01东营百华石油技术开发有限公司Full-bore exempts to bore plug hook-up for cementing
CN111472717A (en)*2020-04-242020-07-31中煤科工集团重庆研究院有限公司Fixed-point reinforcing method for long borehole in coal mine
CN113107418A (en)*2021-03-252021-07-13中煤科工集团西安研究院有限公司Sectional pressure-maintaining grouting device and method for horizontal drilling of coal seam floor aquifer
CN113309487A (en)*2021-05-242021-08-27中煤科工集团西安研究院有限公司Recoverable fixed-point grouting device and method for directional long drilling hole in underground coal mine
CN113494264A (en)*2021-07-092021-10-12中煤科工集团西安研究院有限公司Water-resisting layer reinforced grouting transformation device and method based on staged fracturing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN118653782A (en)*2024-07-082024-09-17淮北矿业股份有限公司 A local grouting device and grouting method for downhole inclined drilling

Also Published As

Publication numberPublication date
CN114961636B (en)2023-09-01

Similar Documents

PublicationPublication DateTitle
CN105840134B (en)Wear layer single pouch injection hole sealing device of uplink drilling and its a method for sealing
CN108757000A (en)A kind of quick slot orientation fracturing system in underground based on drilling machine power and method
CN107313716B (en)Drilling method for coal-bed gas well crossing goaf by composite plugging broken rock at hole bottom
CN110259383A (en)A kind of protrusive bores note integrated device and application method
CN110439497B (en) Integrated equipment for multi-stage plugging, fracturing, grouting and water injection of drilling holes and its use method
CN111535791A (en) High-efficiency gas drainage method in fractured and soft low-permeability coal seam in the area of combined upper and lower well fracturing
CN114542164A (en) An integrated method for co-production of deep coal seam fluidized coal and coalbed methane and CO2 storage
CN110671058A (en)Double-sealing single-clamping process pipe column of old horizontal well and method for realizing large-discharge transformation
CN101532375B (en)Method for recycling for failure of stage cementing unit and sealed circulation device
CN113445981B (en)Directional drilling hydraulic fracturing permeability-increasing device for soft coal seam roof and application method
CN111472717A (en)Fixed-point reinforcing method for long borehole in coal mine
CN111911225B (en) An integrated device and method for drilling and water injection along a coal seam
CN104563873A (en)Underground casing power guiding device
CN111101917B (en)Coal seam hydraulic fracturing combined resonance gas extraction method and hole packer
CN207004498U (en)Infinite stages switching sliding sleeve fracturing tool
CN114961636B (en) A fixed-point grouting sealing method for complex structural strata in underground coal mines
CN205297337U (en)Hole reaming and digging device for well drilling
CN114737913A (en)Underground coal mine long drill hole internal local grouting reinforcement system and grouting method
CN107724995A (en)A kind of mechanical-set half dissolving bridging device and its fracturing process
CN116752959A (en)Unstable deep drilling while-drilling type ground stress testing device and testing method
RU2386776C1 (en)Method of opening of waterbearing stratum in unstable rocks by upward borehole and device for its implementation
CN104481412A (en)Well drilling device
CN204371108U (en)Drilling rig
CN201202429Y (en)Expansion tube hanging seal device for open hole section
CN213016279U (en)Casing damage well fast recovery production pipe column

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
GR01Patent grant
GR01Patent grant