Movatterモバイル変換


[0]ホーム

URL:


CN114715231A - Control center main-standby system for urban rail transit signal system - Google Patents

Control center main-standby system for urban rail transit signal system
Download PDF

Info

Publication number
CN114715231A
CN114715231ACN202210259641.3ACN202210259641ACN114715231ACN 114715231 ACN114715231 ACN 114715231ACN 202210259641 ACN202210259641 ACN 202210259641ACN 114715231 ACN114715231 ACN 114715231A
Authority
CN
China
Prior art keywords
control center
network
main
standby
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210259641.3A
Other languages
Chinese (zh)
Inventor
黄柒光
粱宇
周公建
钱江
杨志慧
刘德伟
储海平
徐建勇
王阳
归甜甜
马钰昕
徐伟锋
郭浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casco Signal Ltd
Original Assignee
Casco Signal Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casco Signal LtdfiledCriticalCasco Signal Ltd
Priority to CN202210259641.3ApriorityCriticalpatent/CN114715231A/en
Publication of CN114715231ApublicationCriticalpatent/CN114715231A/en
Pendinglegal-statusCriticalCurrent

Links

Images

Classifications

Landscapes

Abstract

Translated fromChinese

本发明涉及一种用于城市轨道交通信号系统的控制中心主备系统,该系统包括主用控制中心和备用控制中心,所述主用控制中心包括两套ATS关键设备和两套DCS关键设备,所述备用控制中心包括一套ATS关键设备和一套DCS关键设备;所述的主用控制中心进行自身设备冗余,所述主用控制中心和备用控制中心哪边为主用由用户在界面选择;同时所述主用控制中心包含A网、B网不同频率两套DCS关键设备,其中一套A网主用和一套B网备用,备控中心包含B网一套DCS关键设备并为主用,形成主‑备‑主系统。与现有技术相比,本发明具有可进行无缝切换、提高了系统可靠性等优点。

Figure 202210259641

The invention relates to a control center main and backup system for an urban rail traffic signal system. The system includes a main control center and a backup control center. The main control center includes two sets of ATS key equipment and two sets of DCS key equipment, The standby control center includes a set of ATS key equipment and a set of DCS key equipment; the main control center performs its own equipment redundancy, and which of the main control center and the standby control center is the main one is determined by the user on the interface. At the same time, the main control center includes two sets of DCS key equipment with different frequencies of A network and B network, one of which is the main use of A network and a set of B network backup, and the backup control center includes a set of DCS key equipment of B network. Main use, form the main-standby-main system. Compared with the prior art, the present invention has the advantages of seamless switching and improved system reliability.

Figure 202210259641

Description

Translated fromChinese
一种用于城市轨道交通信号系统的控制中心主备系统A control center main and standby system for urban rail transit signal system

技术领域technical field

本发明涉及一种城市轨道交通信号系统,尤其是涉及一种用于城市轨道交通信号系统的控制中心主备系统。The invention relates to an urban rail traffic signal system, in particular to a control center main and backup system for the urban rail traffic signal system.

背景技术Background technique

城市轨道交通信号系统设备主要分布在控制中心、车站/车辆段/停车场、线路轨道旁、列车上。在控制中心的设备主要有ATS子系统、DCS子系统、MSS子系统。一般ATS关键设备如ATS应用服务器、ATS数据库服务器、DCS关键设备如信号路由器、车地无线通信数据处理服务器(如LTE核心网处理器)等重要设备布署在控制中心设备机房。当控制中心出现异常情况下,如控制中心所在位置出现了火灾、洪水、超过一定时间的断电等,导致控制中心设备无法工作,此时DCS系统、ATS系统关键设备无法正常工作,会影响城市轨道交通正常运营,特别是对于全自动无人驾驶线路,控制中心所在位置由于突发情况出现断电,将导致DCS信号路由器等无法工作,无法实现车地无线通信,轨旁ATC计算的移动授权无法发送到车载ATC,从而会导致列车紧急制动。控制中心断电,也会导致ATS应用服务器、ATS数据库服务器等无法正常工作,无法给列车发送列车运行计划。特别对于全自动无人驾驶线路,出现此情况由于列车上没有司机,将会影响列车无法继续运营,影响乘客出行。The urban rail transit signal system equipment is mainly distributed in the control center, station/depot/parking lot, beside the line track, and on the train. The equipment in the control center mainly includes ATS subsystem, DCS subsystem and MSS subsystem. General ATS key equipment such as ATS application server, ATS database server, DCS key equipment such as signal router, vehicle-ground wireless communication data processing server (such as LTE core network processor) and other important equipment are deployed in the equipment room of the control center. When there is an abnormal situation in the control center, such as fire, flood, power outage over a certain period of time, etc. at the location of the control center, the equipment of the control center cannot work. At this time, the key equipment of the DCS system and ATS system cannot work normally, which will affect the city. The normal operation of rail transit, especially for fully automatic unmanned lines, the location of the control center is powered off due to unexpected situations, which will cause the DCS signal router to fail to work, and it is impossible to realize the wireless communication between the vehicle and the ground, and the mobile authorization calculated by the trackside ATC. It cannot be sent to the on-board ATC, which will result in emergency braking of the train. The power failure of the control center will also cause the ATS application server, ATS database server, etc. to fail to work normally, and the train operation plan cannot be sent to the train. Especially for fully automatic driverless lines, this situation will affect the train's inability to continue to operate and the travel of passengers because there is no driver on the train.

现在越来越多城市在建设城市轨道交通,会进行规划建设备用控制中心,避免主用控制中心在出现灾备情况下,不会影响地铁正常运营。特别是全自动无人驾驶线路,都进行建设了备用控制中心,目前国内建设的全自动无人驾驶线路基本都有建设备用控制中心,比如上海地铁10号线、成都地铁9号线、郑州地铁10号线等。Now more and more cities are building urban rail transit, and planning and building backup control centers will prevent the main control center from affecting the normal operation of the subway in the event of disaster recovery. Especially for fully automatic driverless lines, backup control centers have been built. At present, all fully automatic driverless lines built in China basically have backup control centers, such as Shanghai Metro Line 10, Chengdu Metro Line 9, and Zhengzhou Metro. Line 10, etc.

目前主备控制中心方案存在一定缺陷。1,比如主控中心与备控中心并不能同时在线,需采用切换设备进行切换,也就是主控中心与备控中心采用了相同设备IP,要么主控中心在线工作,断开了备控中心关键设备网络;要么备控中心在线工作,断开了主控中心关键设备网络。比如上海地铁10号线采用的是该方案,需维护人员采用切换开关切换主备控制中心的一边在线工作。该方案也称为冷备方案。2,比如备控中心与主控中心设备完全只是简单的冗余,系统启动时,根据备控中心与主控中心设备根据设备健康状态选择一套设备作为主用,当主用状态的设备故障时,继续根据设备健康状态选择另一套设备作为主用,当前面两套设备都故障时,继续根据设备健康状态选择第三套设备作为主用。北京燕房线的主备控制中心采用的就是该方案。该方案也称为主-备-备方案。该方案并没有做到真正灾备中心,仅仅是设备冗余,不可由工作人员人工选择主控中心、备控中心任一边为主用。不利于维护人员管理设备。比如当前维护人员都在主控中心,希望主控中心设备为主用。The current active-standby control center solution has certain defects. 1. For example, the main control center and the standby control center cannot be online at the same time, and a switching device needs to be used for switching, that is, the main control center and the standby control center use the same device IP, or the main control center works online, and the standby control center is disconnected. The key equipment network; or the standby control center works online, disconnecting the key equipment network of the main control center. For example, Shanghai Metro Line 10 adopts this scheme, and maintenance personnel need to use a switch to switch one side of the main and standby control centers to work online. This scheme is also known as the cold standby scheme. 2. For example, the equipment in the standby control center and the main control center is simply redundant. When the system starts, a set of equipment is selected as the main device according to the health status of the equipment in the standby control center and the main control center. When the equipment in the main state fails , continue to select another set of equipment as the main use according to the health status of the equipment, and continue to select the third set of equipment as the main use according to the health status of the equipment when the previous two sets of equipment are faulty. This scheme is adopted by the main and standby control centers of Beijing Yanfang Line. This scheme is also known as the active-standby-standby scheme. This solution does not have a real disaster recovery center, but only has redundant equipment. The staff cannot manually select either the main control center or the backup control center as the main control center. It is not conducive to maintenance personnel to manage equipment. For example, the current maintenance personnel are all in the main control center, and it is hoped that the main control center equipment is mainly used.

发明内容SUMMARY OF THE INVENTION

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种用于城市轨道交通信号系统的控制中心主备系统。The purpose of the present invention is to provide a main and backup system of a control center for an urban rail traffic signal system in order to overcome the above-mentioned defects of the prior art.

本发明的目的可以通过以下技术方案来实现:The object of the present invention can be realized through the following technical solutions:

根据本发明的一个方面,提供了一种用于城市轨道交通信号系统的控制中心主备系统,该系统包括主用控制中心和备用控制中心,所述主用控制中心包括两套ATS关键设备和两套DCS关键设备,所述备用控制中心包括一套ATS关键设备和一套DCS关键设备;According to an aspect of the present invention, there is provided a control center active and standby system for an urban rail transit signal system, the system includes a main control center and a standby control center, the main control center includes two sets of ATS key equipment and Two sets of DCS key equipment, the backup control center includes a set of ATS key equipment and a set of DCS key equipment;

所述的主用控制中心进行自身设备冗余,所述主用控制中心和备用控制中心哪边为主用由用户在界面选择;同时所述主用控制中心包含A网、B网不同频率两套DCS关键设备,其中一套A网主用和一套B网备用,备控中心包含B网一套DCS关键设备并为主用,形成主-备-主系统。The main control center performs its own equipment redundancy, and the main control center and the backup control center are selected by the user on the interface; at the same time, the main control center includes network A and network B with different frequencies. Sets of key DCS equipment, including a set of network A main and a set of backup network B, the backup control center includes a set of key DCS equipment of network B and the main use, forming the main-standby-main system.

作为优选的技术方案,所述的ATS关键设备包括ATS应用服务器、ATS数据库服务器和通信前置机,所述ATS关键设备使用双网卡且采用独立的网卡;所述DCS关键设备包括核心网服务器和信号路由器,所述的核心网服务器为用于处理车地无线通信网络关键设备。As a preferred technical solution, the ATS key equipment includes an ATS application server, an ATS database server and a communication front-end computer, the ATS key equipment uses dual network cards and an independent network card; the DCS key equipment includes a core network server and A signal router, and the core network server is a key device for processing the vehicle-ground wireless communication network.

作为优选的技术方案,所述的主用控制中心和备用控制中心同时在线,设备IP地址不重复。As a preferred technical solution, the primary control center and the backup control center are online at the same time, and the IP addresses of the devices are not repeated.

作为优选的技术方案,所述的系统还包括两台放置在关键车站的网关服务器,用于实现轨旁ATS与车载ATC通信,该关键车站为轨旁ATC区域控制器安装位置所在站。As a preferred technical solution, the system further includes two gateway servers placed at a key station to realize the communication between the trackside ATS and the vehicle-mounted ATC, and the key station is the station where the trackside ATC area controller is installed.

作为优选的技术方案,所述的主用控制中心的两套ATS关键设备包括两台ATS应用服务器和两台ATS数据库服务器和两台通信前置机;其中两台ATS应用服务器热备冗余,一台ATS应用服务器故障自动切换到另一台ATS应用服务器工作。As a preferred technical solution, the two sets of ATS key equipment in the main control center include two ATS application servers, two ATS database servers and two communication front-end computers; two ATS application servers are hot-standby redundant, When one ATS application server fails, it automatically switches to another ATS application server for work.

作为优选的技术方案,所述的主用控制中心的两台ATS应用服务器通过网络和串口相连,主用控制中心启动的ATS应用服务器首先判断另一台ATS应用服务器是否已启动及状态,若另一台ATS应用服务器为主用状态,那么启动后自动为备用状态;或者如果另一台ATS应用服务器为备用状态,或者通过网络和串口无法获取到远程ATS应用服务器状态,那么当前ATS应用服务器为主用状态。As a preferred technical solution, the two ATS application servers of the main control center are connected to the serial port through the network, and the ATS application server started by the main control center first judges whether the other ATS application server has been started and its status. If an ATS application server is in the active state, it will automatically be in the standby state after startup; or if another ATS application server is in the standby state, or the state of the remote ATS application server cannot be obtained through the network and serial port, the current ATS application server is active state.

作为优选的技术方案,所述的主用控制中心与备用控制中心哪个作为主用中心通过在行调工作站选择,默认主用控制中心为主用中心;As a preferred technical solution, which one of the main control center and the standby control center is the main control center is selected through the adjustment workstation, and the default main control center is the main control center;

所述主用中心选择了主用控制中心和备用控制中心的一个位置为控制中心;主用状态为服务器实际在处理、发送和接收信息的设备;备用状态是相对主用状态而言,没有处理相关信息的设备;任何时刻主用状态有且只有一台设备,其余为备用状态或未启动。The primary center selects a position between the primary control center and the backup control center as the control center; the primary state is the device that the server actually processes, sends and receives information; the backup state is relative to the primary state, without processing Equipment with relevant information; at any time, there is one and only one equipment in the active state, and the rest are in the standby state or not started.

作为优选的技术方案,系统启动后,所述的行调工作站选择的主用中心在主用控制中心还是备用控制中心,如果没有进行选择,那么主用中心默认在主用控制中心;As a preferred technical solution, after the system is started, the main control center selected by the said dispatching workstation is the main control center or the standby control center. If no selection is made, the main control center is the main control center by default;

如果主用中心在主用控制中心,那么主用控制中心的服务器启动会进行判断主用状态;备用控制中心的服务器启动后会自动置为备用状态;If the main control center is in the main control center, the server of the main control center will judge the main state when it is started; the server of the standby control center will be automatically set to the standby state after it is started;

如果主用中心在备用控制中心,那么备用控制中心的服务器启动会进行判断主用状态,如果备用控制中心只有一台服务器、那么启动后直接为主用状态,如果备用控制中心有两台服务器,进行判断主用状态,主用控制中心的服务器启动后会自动置为备用状态。If the active center is in the standby control center, the server in the standby control center will judge the active state when it is started. If the standby control center has only one server, it will be in the active state directly after startup. If the standby control center has two servers, To judge the active state, the server of the active control center will be automatically set to the standby state after it is started.

作为优选的技术方案,所述的主用控制中心有2套核心网服务器、2套信号路由器;所述备用控制中心有1套核心网服务器、1套信号路由器。As a preferred technical solution, the main control center has 2 sets of core network servers and 2 sets of signal routers; the backup control center has 1 set of core network servers and 1 set of signal routers.

作为优选的技术方案,用于处理车地无线通信LTE网络提供双网冗余,分别为A网和B网,其中所述A网和B网传输的信号系统内容完全一样,采用不同的传输频率和带宽。As a preferred technical solution, the LTE network for handling vehicle-ground wireless communication provides dual network redundancy, namely A network and B network, wherein the content of the signal system transmitted by the A network and the B network is exactly the same, and different transmission frequencies are used. and bandwidth.

作为优选的技术方案,所述主用控制中心为A网主用和B网备用,备用控制中心为B网主用;即主用控制中心包括A网核心网服务器、A网信号路由器、B网核心网服务器和B网信号路由器;备用控制中心包括B网核心网服务器和B网信号路由器。As a preferred technical solution, the main control center is the main network A and the backup network B, and the backup control center is the main network B; that is, the main control center includes the A network core network server, the A network signal router, the B network The core network server and the B network signal router; the backup control center includes the B network core network server and the B network signal router.

作为优选的技术方案,所述A网仅有一套设备在主用控制中心,均为主用;B网的主用控制中心的核心网服务器与备用控制中心的核心网服务器相连,B网的主用控制中心的信号路由器与备用控制中心的信号路由器相连,其中B网处于备用控制中心的核心网服务器及信号路由器为主用状态,B网处于主用控制中心的核心网服务器及信号路由器为备用状态。As a preferred technical solution, the network A has only one set of equipment in the main control center, all of which are active; the core network server of the main control center of network B is connected to the core network server of the standby control center, and the main network server of network B Use the signal router of the control center to connect with the signal router of the standby control center, in which the core network server and signal router of the B network in the standby control center are in the main state, and the core network server and the signal router of the B network in the main control center are standby. state.

采用上述设计的优点:当B网主用设备出现故障,B网备用设备升级主用时,此时由于涉及网络注销、重新注册入网等服务,需要一定的时间,此段时间可能会出现短时间的车地无线通信网络中断,可能短时间影响行车;因此在主用控制中心设置A网主用、在备用控制中心设置B网主用;异地分别设置一套主用设备有利于提高信号系统网络容错性,主用控制中心或备用控制中心任何一边出现断电、或其它灾害时,车地无线通信网络不受影响。The advantages of adopting the above design: When the main equipment of network B fails and the standby equipment of network B is upgraded to the main use, it will take a certain period of time due to services such as network logout and re-registration. The interruption of the vehicle-ground wireless communication network may affect the driving in a short period of time; therefore, the main use of network A is set in the main control center, and the main use of network B is set in the standby control center; setting up a set of main equipment in different places is conducive to improving the fault tolerance of the signal system network In the event of power failure or other disasters on either side of the primary control center or the backup control center, the vehicle-ground wireless communication network will not be affected.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1)本发明考虑灾备情况下(即主用控制中心或备用控制中心整体断电或故障)不影响运营下,建设的备用控制中心关键设备最少,节约项目成本。1) In the present invention, under the condition of disaster recovery (that is, the overall power failure or failure of the main control center or the backup control center) does not affect the operation, the construction of the backup control center has the least key equipment and saves the project cost.

2)本发明主用控制中心ATS应用服务器主备实现热备冗余,可进行无缝切换,不影响运营;主用控制中心与备用控制中心又可通过行调自由选择一方为主用中心。即可实现人为选择一边为主用中心(选择维护力量多的一方为主用中心),又可实现主备自动切换,提高了系统可靠性。2) The main control center ATS application server of the present invention realizes hot standby redundancy, which can be seamlessly switched without affecting the operation; the main control center and the standby control center can freely choose one of the main control centers through line adjustment. It can realize artificial selection of one side as the main center (select the one with more maintenance force as the main center), and realize automatic switching of main and standby, which improves the reliability of the system.

3)本发明关键设备和通信通道采取了冗余且为热备,可避免某台设备或通信通道故障、影响信号系统自动行车,提高了系统可靠性。3) The key equipment and communication channel of the present invention are redundant and hot-standby, which can avoid the failure of a certain device or communication channel and affect the automatic driving of the signal system, thereby improving the reliability of the system.

4)本发明设计的车地网络通信,在网络关键设备数目一定情况下,冗余性最高。4) The vehicle-ground network communication designed by the present invention has the highest redundancy under the condition of a certain number of network key devices.

5)本发明设计的车地网络通信,保证满足一定冗余性前提下,所需线缆最少。5) The vehicle-ground network communication designed by the present invention ensures the least amount of cables required under the premise of satisfying a certain redundancy.

附图说明Description of drawings

图1为本发明主备控制中心网络设备示意图;Fig. 1 is the schematic diagram of the network equipment of the active and standby control center of the present invention;

图2为本发明主备控制中心信号系统关键设备布置示意图;2 is a schematic diagram of the layout of key equipment of the signal system of the active and standby control center of the present invention;

图3为本发明主备控制中心ATS应用服务器启动判断状态流程图。FIG. 3 is a flow chart of the startup judgment state of the ATS application server of the active/standby control center of the present invention.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都应属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

本发明提供的一种城市轨道交通信号系统用的控制中心主备系统。首先做到灾备功能,即主控中心的设备冗余,备控中心与主控中心哪边为主用可由工作人员在界面选择。其次涉及车地无线通信采用基于LTE组网方案,主控中心包含A网、B网不同频率两套DCS关键设备,其中一套A网主用,一套B网备用。备控中心包含B网一套DCS关键设备并为主用,也称为主-备-主方案。The invention provides a main and standby system of a control center for an urban rail traffic signal system. First, the disaster recovery function is achieved, that is, the equipment of the main control center is redundant, and which side of the standby control center and the main control center is the main one can be selected by the staff on the interface. Secondly, the vehicle-ground wireless communication adopts an LTE-based networking solution. The main control center includes two sets of DCS key equipment with different frequencies of A network and B network, one of which is for main use and one for B network. The standby control center includes a set of key DCS devices on the B network and is used as the main device, also known as the active-standby-active solution.

1、本发明主备控制中心网络设备示意图如图1所示。1. A schematic diagram of the network equipment of the active and standby control center of the present invention is shown in FIG. 1 .

1.1主备控制中心网络设备示意图,进行描述网络架构、关键网络设备布置、连接等。处理信号系统车地无线通信的关键设备布置在主控中心、备控中心。信号系统车地无线通信采用两个网段频率,提高系统可靠性,两个网段分别为A网、B网,其中A网、B网采用频道与当地无线通信委员会申请获取。1.1 Schematic diagram of the network equipment of the active and standby control center, to describe the network architecture, key network equipment layout, connection, etc. The key equipment for processing the vehicle-ground wireless communication of the signal system is arranged in the main control center and the backup control center. The vehicle-ground wireless communication of the signal system adopts two network segment frequencies to improve the reliability of the system.

1.2A网采用一个频率,B网采用不同于A网频率,其中A网信息经过红网骨干网交换机,红网主交换机。B网信息经过蓝网骨干网交换机,蓝网主交换机。两个网络相互独立组网,设备相互独立,提高网络冗余性。1.2 The A network adopts a frequency, and the B network adopts a frequency different from that of the A network, in which the information of the A network passes through the red network backbone network switch and the red network main switch. The B network information passes through the blue network backbone network switch and the blue network main switch. The two networks are networked independently of each other, and the devices are independent of each other to improve network redundancy.

1.3信号系统中各子系统的信息传递、车载轨旁的信息传递都需要依靠DCS(网络传输系统)。1.3 The information transmission of each subsystem in the signal system and the information transmission of the vehicle trackside all need to rely on DCS (network transmission system).

主控中心包含关键网络设备:两套网络设备,分别为A网网络设备,B网网络设备,具体为信号路由器A,核心网服务器A,红网主交换机,红网骨干网;信号路由器B,核心网服务器B,蓝网主交换机,蓝网骨干网。其中蓝网主交换机为冷备,因为主交换机只能有一个接入,由于备控中心有一个蓝网交换机,因此主控中心的蓝网主交换机正常工作时不接入。冷备有两种实现方式,一种是设备断电,另一种是设备正常启动,但与外部连接的网线断开。本方案采用第二种方式的冷备方式,主要优点为,当需要采用冷备的蓝网主交换机时,可以快速接入系统,减少切换时间,减少影响运营时间。而采用设备断电的冷备方式,担心现场维护人员误操作,使得主备控制中心交换机均在线。The main control center includes key network equipment: two sets of network equipment, namely A network network equipment, B network network equipment, specifically signal router A, core network server A, red network main switch, red network backbone network; signal router B, Core network server B, blue network main switch, blue network backbone network. Among them, the blue network master switch is a cold backup, because the master switch can only have one access, and because the standby control center has a blue network switch, the blue network master switch in the main control center is not connected when it is working normally. There are two implementations of cold backup, one is that the device is powered off, and the other is that the device is normally started but disconnected from the externally connected network cable. This solution adopts the second method of cold backup. The main advantage is that when the blue network master switch of cold backup is required, it can quickly access the system, reduce the switching time, and reduce the impact on operation time. In contrast, the cold backup method in which the equipment is powered off is worried that the on-site maintenance personnel will make misoperations, so that the switches in the active and standby control centers are all online.

在图中可看到主控中心冷备的蓝网主交换机与蓝网骨干网、核心网B网服务器(EPC-B)进行了虚线连接,代表正常情况是断开。A网网络关键设备仅布署在主控中心,仅有一套,相关设备均为主用。In the figure, it can be seen that the blue network main switch in the cold backup of the main control center is connected with the blue network backbone network and the core network B network server (EPC-B) by a dotted line, which means that the normal situation is disconnected. Network A network key equipment is only deployed in the main control center, there is only one set, and the related equipment is mainly used.

备控中心包含关键网络设备:一套B网网络设备,具体为信号路由器B,核心网服务器B,蓝网主交换机,蓝网骨干网。The standby control center includes key network equipment: a set of B network network equipment, specifically the signal router B, the core network server B, the blue network main switch, and the blue network backbone network.

1.4正常情况,备控中心的EPC-B为主用,备控中心的蓝网交换机主用。蓝网主交换机有且仅有一台接入网络。主控中心的B网信号网路由器与备控中心的B网信号网路由器相连,采用两根网络用于GRE隧道互联。主控中心的B网信号网路由器与备控中心的蓝网主交换机相连,采用一根网络进行互联。1.4 Under normal circumstances, the EPC-B of the standby control center is the main function, and the blue network switch of the standby control center is the main function. The bluenet master switch has one and only one access network. The B network signal network router of the main control center is connected to the B network signal network router of the standby control center, and two networks are used for GRE tunnel interconnection. The B network signal network router of the main control center is connected to the blue network main switch of the standby control center, and a network is used for interconnection.

1.5主控中心的B网信号网路由器与备控中心的B网信号网路由器采用VRRP技术,进行虚拟两个IP地址,一个IP用于与信号系统轨旁数据传输,一个IP用于与信号系统车载数据传输。所谓VRRP技术虚拟IP技术,是指对外而言,两个设备是一体的,IP地址是浮动,即B网信号网路由器哪个为主用,那么IP地址就在哪台设备。1.5 The B network signal network router of the main control center and the B network signal network router of the standby control center use VRRP technology to virtualize two IP addresses, one IP is used for trackside data transmission with the signal system, and the other is used with the signal system. In-vehicle data transmission. The so-called virtual IP technology of VRRP technology refers to externally, the two devices are integrated, and the IP address is floating, that is, whichever router of the B network signal network is the main use, then which device is the IP address.

1.6正常情况数据流:1.6 Normal data flow:

车载设备的数据信息传输到轨旁设备(数据流图)The data information of the on-board equipment is transmitted to the trackside equipment (data flow diagram)

车载设备数据通过车载无线传输到轨旁LTE设备(经过合路器、RRU、BBU)到车站骨干网交换机、控制中心骨干网交换机、信号路由器、核心网服务器、信号路由器、主交换机、轨旁设备(部分再通过控制中心骨干网交换机、车站骨干网交换机到轨旁设备)。On-board equipment data is transmitted wirelessly to the trackside LTE equipment (via the combiner, RRU, BBU) to the station backbone network switch, control center backbone network switch, signal router, core network server, signal router, main switch, trackside equipment (Part of it passes through the control center backbone network switch and the station backbone network switch to the trackside equipment).

轨旁设备的数据信息传输到车载设备(数据流图)The data information of the trackside equipment is transmitted to the on-board equipment (data flow diagram)

轨旁设备数据通过主交换机(部分通过车站骨干网交换机、控制中心骨干网交换机)、信号路由器、核心网服务器、信号路由器、控制中心骨干网交换机、经轨旁LTE设备(经过合路器、RRU、BBU)The data of the trackside equipment passes through the main switch (partly through the station backbone network switch, the control center backbone network switch), the signal router, the core network server, the signal router, the control center backbone network switch, the trackside LTE equipment (through the combiner, RRU) , BBU)

车载无线传输到轨旁LTE设备(经过合路器、RRU、BBU)到车站骨干网交换机、控制中心骨干网交换机、信号路由器、核心网服务器、信号路由器、主交换机、轨旁设备(部分再通过控制中心骨干网交换机、车站骨干网交换机到轨旁设备)。Vehicle wireless transmission to trackside LTE equipment (via combiner, RRU, BBU) to station backbone network switch, control center backbone network switch, signal router, core network server, signal router, main switch, and trackside equipment (partly through Control center backbone network switch, station backbone network switch to trackside equipment).

1.7当主控中心的B网信号网路由器与备控中心的B网信号网路由器设备都正常,备控中心的B网信号网路由器为主用。1.7 When the B network signal network router of the main control center and the B network signal network router of the backup control center are normal, the B network signal network router of the backup control center is the main function.

备控中心的B网信号网路由器作为VRRP主用设备根据静态路由将信号轨旁数据经过GRE隧道经过主控中心B网核心网服务器发送到车载ATC设备。The B network signal network router of the standby control center acts as the VRRP main device to send the signal trackside data to the vehicle ATC device through the GRE tunnel through the B network core network server of the main control center according to the static route.

备控中心的B网信号网路由器作为VRRP主用设备根据静态路由将信号车载数据经过GRE隧道经过主控中心B网核心网服务器发送到轨旁ATC设备。The B network signal network router of the standby control center acts as the VRRP main device to send the signal vehicle data to the trackside ATC device through the GRE tunnel through the B network core network server of the main control center according to the static route.

1.8故障情况:1.8 Failure situation:

当备控中心的B网核心服务器(正常时为主用)故障,主控中心的B网核心服务器进行注册入网并作为主用。备控中心的信号路由器在VRRP中为主用设备,轨旁数据与车载数据的传输通过备控中心B网信号路由器、主控中心的B网核心服务器、备控中心主交换机、骨干网交换机。When the B network core server of the standby control center (normally active) fails, the B network core server of the main control center will be registered and connected to the network and will be used as the main server. The signal router of the standby control center is the main device in VRRP, and the transmission of trackside data and vehicle data is through the B network signal router of the standby control center, the B network core server of the main control center, the main switch of the standby control center, and the backbone network switch.

当主控中心的B网信号网路由器故障(正常时备控中心为主用),备控中心的信号路由器在VRRP中为主用设备,轨旁数据与车载数据的传输通过备控中心B网信号路由器、备控中心的B网核心服务器、备控中心主交换机、骨干网交换机。When the B network signal network router of the main control center is faulty (the backup control center is the main function when it is normal), the signal router of the backup control center is the main equipment in VRRP, and the transmission of trackside data and on-board data goes through the B network of the backup control center Signal router, B network core server of backup control center, main switch of backup control center, backbone network switch.

当备控中心的B网信号网路由器故障(正常时备控中心为主用),主控中心的信号路由器在VRRP中为主用设备,轨旁数据与车载数据的传输通过主控中心B网信号路由器、主控中心的B网核心服务器、备控中心主交换机、骨干网交换机。When the B network signal network router of the backup control center fails (the backup control center is the main one when it is normal), the signal router of the main control center is the main device in VRRP, and the transmission of trackside data and on-board data passes through the B network of the main control center Signal router, B network core server in the main control center, main switch in the standby control center, and backbone network switch.

当备控中心的B网核心服务器(正常时为主用)故障、备控中心的B网信号路由器故障,主控中心的B网核心服务器进行注册入网并作为主用,主控中心的信号路由器在VRRP中为主用设备。轨旁数据与车载数据的传输通过备控中心B网信号路由器、主控中心的B网核心服务器、备控中心主交换机、骨干网交换机。When the core server of network B in the standby control center (mainly used when it is normal) fails, and the signal router of network B in the standby control center fails, the core server of network B in the main control center is registered into the network and used as the main control center. The signal router of the main control center It is the master device in VRRP. The transmission of trackside data and on-board data passes through the B network signal router of the backup control center, the B network core server of the main control center, the main switch of the backup control center, and the backbone network switch.

当备控中心整体断电故障,主控中心的B网核心服务器进行注册入网并作为主用,主控中心的信号路由器在VRRP中为主用设备,主控中心冷备主交换机进行接入网络。轨旁数据与车载数据的传输通过主控中心B网信号路由器、主控中心的B网核心服务器、主控中心主交换机、骨干网交换机。When the backup control center is powered off as a whole, the B network core server of the master control center is registered and connected to the network and serves as the master. The signal router of the master control center is the master device in VRRP, and the cold backup master switch of the master control center is connected to the network. . The transmission of trackside data and on-board data is through the B network signal router of the main control center, the B network core server of the main control center, the main switch of the main control center, and the backbone network switch.

2、本发明主备控制中心信号系统关键设备布置示意图如图2所示。2. A schematic diagram of the layout of the key equipment of the signal system of the active and standby control center of the present invention is shown in FIG. 2 .

2.1设备集中车站布置了冗余CI(联锁)设备,冗余车站ATS服务器及相关ATS工作站。联锁设备与轨旁的计轴系统、信号机、转辙机等信号设备相连,一方面进行获取轨旁状态,另一方面发送控制轨旁命令。车站ATS服务器,一方面主要从联锁设备获取轨旁状态,一方面接收中心或车站调度人员控制轨旁设备命令发送给联锁设备。2.1 Equipment centralized The station is equipped with redundant CI (interlocking) equipment, redundant station ATS server and related ATS workstations. The interlocking equipment is connected to the trackside axle counting system, signal machine, switch machine and other signal equipment. On the one hand, it obtains the trackside state, and on the other hand, it sends the control trackside command. The station ATS server, on the one hand, mainly obtains the trackside status from the interlocking equipment, and on the other hand receives the command from the center or station dispatcher to control the trackside equipment and sends it to the interlocking equipment.

2.2在关键集中车站放置冗余轨旁ATC设备、ATS网关服务器,关键集中车站一般在线路折返站,换乘站,或终点站,设备维护人员相对较多的地方设置。轨旁ATC设备通过无线通信设备BBU、RRU、合缆、通信天线与车载ATC设备相连,轨旁ATC设备给车载ATC设备发送轨旁状态及移动授权,车载ATC设备与轨旁ATC设备发送列车位置报告及列车相关信息。轨旁ATC设备与联锁设备相连,轨旁ATC设备给联锁传递次级列车占用检测设备可用性、从车载ATC设备无线通信获取的列车位置等。联锁设备给ATC设备传递轨旁设备状态等。网关服务器与轨旁ATC设备、车载ATC设备相连,实现ATS与ATC信息交互,ATS给ATC传递列车运行命令、列车运行计划等,ATC给ATS传递列车位置报告、列车相关信息等。2.2 Place redundant trackside ATC equipment and ATS gateway servers at key centralized stations. Key centralized stations are generally set at line turnaround stations, transfer stations, or terminal stations, where there are relatively many equipment maintenance personnel. The wayside ATC equipment is connected to the on-board ATC equipment through the wireless communication equipment BBU, RRU, combined cable and communication antenna. The trackside ATC equipment sends the trackside status and movement authorization to the on-board ATC equipment, and the on-board ATC equipment and the trackside ATC equipment send the train position. Reports and train related information. The trackside ATC equipment is connected to the interlocking equipment, and the trackside ATC equipment transmits the availability of the secondary train occupancy detection equipment and the train position obtained from the wireless communication of the on-board ATC equipment to the interlocking. The interlocking equipment transmits the status of the trackside equipment to the ATC equipment. The gateway server is connected with the trackside ATC equipment and the on-board ATC equipment to realize the information exchange between the ATS and the ATC.

2.3主控中心布置了冗余ATS服务器,ATS服务器主要包含ATS应用服务器,ATS数据库服务器,冗余外部接口服务器(通信前置机),冗余网络通信设备(含EPC核心网服务器,信号路由器等关键设备),调度工作站。ATS服务器主要与车站ATS服务器、网关服务器、ATS工作站相连,处理相关轨旁状态信息、相关列车计划信息、发送轨旁控制命令等。外部接口服务器主要与ATS服务器相连,处理列车计划运行信息、预测信息等并发送给各外部接口,或者获取外部统一时钟,涉及的外部接口如PIS系统(旅客向导系统)、无线系统、ISCS(综合监控系统)、时钟系统等。网络通信设备主要处理车地无线通信内容,信号系统所有车载设备与轨旁设备通信内容都需要经过EPC核心网服务器,信号路由器设备处理。调度工作站是人机界面,显示轨旁状态,列车信息,及接收调度操作命令等。2.3 The main control center is equipped with redundant ATS servers. The ATS servers mainly include ATS application servers, ATS database servers, redundant external interface servers (communication front-end machines), redundant network communication equipment (including EPC core network servers, signal routers, etc. key equipment), scheduling workstations. The ATS server is mainly connected with the station ATS server, gateway server, and ATS workstation to process relevant trackside status information, relevant train planning information, and send trackside control commands. The external interface server is mainly connected with the ATS server to process train planning operation information, forecast information, etc. and send it to each external interface, or obtain an external unified clock. The external interfaces involved such as PIS system (passenger guidance system), wireless system, ISCS (integrated monitoring system), clock system, etc. The network communication equipment mainly deals with the wireless communication content between the vehicle and the ground. The communication content of all the vehicle-mounted equipment and the trackside equipment in the signal system needs to be processed by the EPC core network server and the signal router equipment. The dispatching workstation is a man-machine interface that displays the trackside status, train information, and receives dispatching operation commands.

2.4备控中心布置了单套ATS服务器、单套外部接口服务器、单套网络通信设备、调度工作站。2.4 A single set of ATS servers, a single set of external interface servers, a single set of network communication equipment, and a dispatching workstation are arranged in the standby control center.

3、如图3所示,本发明主备控制中心ATS应用服务器判断主备状态流程为:3. As shown in FIG. 3 , the process of judging the active and standby states by the ATS application server of the active and standby control center of the present invention is as follows:

3.1ATS应用服务器应用程序进行启动、或在运行中。3.1 The ATS application server application is started or is running.

3.2ATS应用服务器应用程序通过配置参数或IP地址判断本机所在位置,在主控中心还是备控中心。如果是在主控中心,则进行3.3。如果是在备控中心,则进行3.6。3.2 The ATS application server application program determines the location of the machine through configuration parameters or IP address, whether it is in the main control center or the standby control center. If it is in the main control center, go to 3.3. If it is in the standby control center, go to 3.6.

3.3本机所在位置在主控中心,继续判断主用中心是在主控中心还是备控中心。如果主用中心是在主控中心,则进行3.4。如果是在备控中心,则进行3.5。3.3 The location of the machine is in the main control center, continue to judge whether the main control center is in the main control center or the standby control center. If the main center is the main control center, go to 3.4. If it is in the standby control center, go to 3.5.

3.4本机所在位置在主控中心,主用中心是在主控中心,继续判断主控中心另一台ATS应用服务器是否为主用。如果是主用,那么本机设置为备用状态。如果是备用或者未启动,那么本机设置主用状态。3.4 The location of the machine is in the main control center, and the main use center is in the main control center. Continue to judge whether another ATS application server in the main control center is the main use. If it is the main use, then the machine is set to the standby state. If it is standby or not started, the machine is set to the active state.

3.5本机所在位置在主控中心,主用中心是在备控中心,本机设置为备用状态。3.5 The location of the machine is in the main control center, the main center is in the standby control center, and the machine is set to the standby state.

3.6本机所在位置在备控中心,继续判断主用中心是在主控中心还是备控中心。如果主用中心是在主控中心,本机设置为备用状态。如果主用中心是在备控中心,且备控中心仅一套服务器的话,那么本机设置为主用状态。针对备控中心两套服务器的话,判断方法与主控中心一致,如3.4。3.6 The location of the machine is in the standby control center, continue to judge whether the main center is in the main control center or the standby control center. If the main center is the main control center, the machine is set to the standby state. If the active center is in the standby control center, and the standby control center has only one set of servers, then the local machine is set to the active state. For the two sets of servers in the standby control center, the judgment method is the same as that of the main control center, such as 3.4.

3.7针对主控中心两套ATS应用服务器,通过网络及串口两种方式通信,避免由于单一的通信故障导致无法读取对方状态,可提高系统可靠性。3.7 For the two sets of ATS application servers in the main control center, they communicate through the network and the serial port to avoid the inability to read the status of the other party due to a single communication failure, which can improve the reliability of the system.

当网络及串口通信都故障,此时由于无法获取另一台服务器设备状态,备机升级为主机,当通信恢复后,可能会出现双机现象,此时首先检测到对方是主用服务器,并且本机处于主用状态的服务器会进行自动退出,避免双主机现象。由于通信采用了网络及串口两种通信方式,同时出现故障的概率是很小,因此这种情况较少出现。When both the network and serial communication fail, the standby server is upgraded to the host because the status of the other server cannot be obtained. When the communication is restored, a dual-server phenomenon may occur. At this time, it is first detected that the other party is the active server, and The server in the active state of the machine will automatically exit to avoid the phenomenon of dual hosts. Since the communication adopts two communication methods of network and serial port, the probability of failure at the same time is very small, so this kind of situation rarely occurs.

3.8主用中心在主控中心还是在备控中心,由行调工作人员通过行调ATS工作站选择或设置,未设置缺省情况下主用中心在主控中心。3.8 Whether the main center is in the main control center or the standby control center is selected or set by the dispatching staff through the dispatching ATS workstation. The main control center is the main control center by default if it is not set.

以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到各种等效的修改或替换,这些修改或替换都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以权利要求的保护范围为准。The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited to this. Any person skilled in the art can easily think of various equivalents within the technical scope disclosed by the present invention. Modifications or substitutions should be included within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope of the claims.

Claims (12)

Translated fromChinese
1.一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,该系统包括主用控制中心和备用控制中心,所述主用控制中心包括两套ATS关键设备和两套DCS关键设备,所述备用控制中心包括一套ATS关键设备和一套DCS关键设备;1. a control center main and backup system for urban rail traffic signal system, is characterized in that, this system comprises main use control center and backup control center, and described main use control center comprises two sets of ATS key equipment and two sets of DCS key equipment, the backup control center includes a set of ATS key equipment and a set of DCS key equipment;所述的主用控制中心进行自身设备冗余,所述主用控制中心和备用控制中心哪边为主用由用户在界面选择;同时所述主用控制中心包含A网、B网不同频率两套DCS关键设备,其中一套A网主用和一套B网备用,备控中心包含B网一套DCS关键设备并为主用,形成主-备-主系统。The main control center performs its own equipment redundancy, and the main control center and the backup control center are selected by the user on the interface; at the same time, the main control center includes network A and network B with different frequencies. Sets of key DCS equipment, including a set of network A main and a set of backup network B, the backup control center includes a set of key DCS equipment of network B and the main use, forming the main-standby-main system.2.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的ATS关键设备包括ATS应用服务器、ATS数据库服务器和通信前置机,所述ATS关键设备使用双网卡且采用独立的网卡;所述DCS关键设备包括核心网服务器和信号路由器,所述的核心网服务器为用于处理车地无线通信网络关键设备。2. a kind of control center main and standby system for urban rail transit signal system according to claim 1, is characterized in that, described ATS key equipment comprises ATS application server, ATS database server and communication front-end machine, so The ATS key equipment uses dual network cards and an independent network card; the DCS key equipment includes a core network server and a signal router, and the core network server is a key device for processing the vehicle-ground wireless communication network.3.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的主用控制中心和备用控制中心同时在线,设备IP地址不重复。3. A control center main and backup system for an urban rail transit signal system according to claim 1, wherein the main control center and the backup control center are online at the same time, and the device IP addresses are not repeated.4.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的系统还包括两台放置在关键车站的网关服务器,用于实现轨旁ATS与车载ATC通信,该关键车站为轨旁ATC区域控制器安装位置所在站。4. A control center main and standby system for an urban rail traffic signal system according to claim 1, wherein the system further comprises two gateway servers placed at key stations for realizing trackside The ATS communicates with the on-board ATC, and the key station is the station where the trackside ATC area controller is installed.5.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的主用控制中心的两套ATS关键设备包括两台ATS应用服务器和两台ATS数据库服务器和两台通信前置机;其中两台ATS应用服务器热备冗余,一台ATS应用服务器故障自动切换到另一台ATS应用服务器工作。5. a kind of control center main and standby system for urban rail transit signal system according to claim 1, is characterized in that, two sets of ATS key equipment of described main control center comprise two ATS application servers and two One ATS database server and two communication front-end computers; two ATS application servers are hot-standby redundant, and one ATS application server automatically switches to another ATS application server for work when it fails.6.根据权利要求5所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的主用控制中心的两台ATS应用服务器通过网络和串口相连,主用控制中心启动的ATS应用服务器首先判断另一台ATS应用服务器是否已启动及状态,若另一台ATS应用服务器为主用状态,那么启动后自动为备用状态;或者如果另一台ATS应用服务器为备用状态,或者通过网络和串口无法获取到远程ATS应用服务器状态,那么当前ATS应用服务器为主用状态。6. a kind of control center main and backup system for urban rail transit signal system according to claim 5, is characterized in that, two ATS application servers of described main use control center are connected with serial port through network, main use The ATS application server started by the control center first judges whether another ATS application server has been started and its status. Standby state, or the remote ATS application server state cannot be obtained through the network and serial port, then the current ATS application server is in the active state.7.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的主用控制中心与备用控制中心哪个作为主用中心通过在行调工作站选择,默认主用控制中心为主用中心;7. The main and standby system of a control center for an urban rail transit signal system according to claim 1, characterized in that, which of the main control center and the standby control center is used as the main center through the dispatching workstation Select, the default main control center is the main center;所述主用中心选择了主用控制中心和备用控制中心的一个位置为控制中心;主用状态为服务器实际在处理、发送和接收信息的设备;备用状态是相对主用状态而言,没有处理相关信息的设备;任何时刻主用状态有且只有一台设备,其余为备用状态或未启动。The primary center selects a position between the primary control center and the backup control center as the control center; the primary state is the device that the server actually processes, sends and receives information; the backup state is relative to the primary state, without processing Equipment with relevant information; at any time, there is one and only one equipment in the active state, and the rest are in the standby state or not started.8.根据权利要求7所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,系统启动后,所述的行调工作站选择的主用中心在主用控制中心还是备用控制中心,如果没有进行选择,那么主用中心默认在主用控制中心;8. A control center main-standby system for an urban rail transit signal system according to claim 7, characterized in that, after the system is started, the main center selected by the line dispatching workstation is in the main control center or the main control center. Standby control center, if not selected, then the main control center defaults to the main control center;如果主用中心在主用控制中心,那么主用控制中心的服务器启动会进行判断主用状态;备用控制中心的服务器启动后会自动置为备用状态;If the main control center is in the main control center, the server of the main control center will judge the main state when it is started; the server of the standby control center will be automatically set to the standby state after it is started;如果主用中心在备用控制中心,那么备用控制中心的服务器启动会进行判断主用状态,如果备用控制中心只有一台服务器、那么启动后直接为主用状态,如果备用控制中心有两台服务器,进行判断主用状态,主用控制中心的服务器启动后会自动置为备用状态。If the active center is in the standby control center, the server in the standby control center will judge the active state when it starts up. If the standby control center has only one server, it will be in the active state directly after startup. If the standby control center has two servers, To judge the active state, the server of the active control center will be automatically set to the standby state after it is started.9.根据权利要求1所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述的主用控制中心有2套核心网服务器、2套信号路由器;所述备用控制中心有1套核心网服务器、1套信号路由器。9. A control center main and backup system for an urban rail transit signal system according to claim 1, wherein the main control center has 2 sets of core network servers and 2 sets of signal routers; the The standby control center has 1 set of core network servers and 1 set of signal routers.10.根据权利要求9所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,用于处理车地无线通信LTE网络提供双网冗余,分别为A网和B网,其中所述A网和B网传输的信号系统内容完全一样,采用不同的传输频率和带宽。10. A control center main and backup system for an urban rail transit signal system according to claim 9, wherein the LTE network for handling vehicle-ground wireless communication provides dual network redundancy, which are A network and B network respectively. network, wherein the content of the signal system transmitted by the A network and the B network is exactly the same, and different transmission frequencies and bandwidths are used.11.根据权利要求10所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述主用控制中心为A网主用和B网备用,备用控制中心为B网主用;即主用控制中心包括A网核心网服务器、A网信号路由器、B网核心网服务器和B网信号路由器;备用控制中心包括B网核心网服务器和B网信号路由器。11. A control center active and standby system for an urban rail transit signal system according to claim 10, wherein the main control center is the main use of A network and the backup of B network, and the standby control center is B The main network is used; that is, the main control center includes the core network server of network A, the signal router of network A, the core network server of network B and the signal router of network B; the backup control center includes the core network server of network B and the signal router of network B.12.根据权利要求11所述的一种用于城市轨道交通信号系统的控制中心主备系统,其特征在于,所述A网仅有一套设备在主用控制中心,均为主用;B网的主用控制中心的核心网服务器与备用控制中心的核心网服务器相连,B网的主用控制中心的信号路由器与备用控制中心的信号路由器相连,其中B网处于备用控制中心的核心网服务器及信号路由器为主用状态,B网处于主用控制中心的核心网服务器及信号路由器为备用状态。12. A control center active and standby system for an urban rail transit signal system according to claim 11, wherein the A network has only one set of equipment in the main control center, all of which are main; The core network server of the main control center is connected to the core network server of the standby control center, the signal router of the main control center of the B network is connected to the signal router of the standby control center, and the B network is located in the core network server of the standby control center and The signal router is in the active state, and the core network server and signal router of the B network in the active control center are in the standby state.
CN202210259641.3A2022-03-162022-03-16Control center main-standby system for urban rail transit signal systemPendingCN114715231A (en)

Priority Applications (1)

Application NumberPriority DateFiling DateTitle
CN202210259641.3ACN114715231A (en)2022-03-162022-03-16Control center main-standby system for urban rail transit signal system

Applications Claiming Priority (1)

Application NumberPriority DateFiling DateTitle
CN202210259641.3ACN114715231A (en)2022-03-162022-03-16Control center main-standby system for urban rail transit signal system

Publications (1)

Publication NumberPublication Date
CN114715231Atrue CN114715231A (en)2022-07-08

Family

ID=82236919

Family Applications (1)

Application NumberTitlePriority DateFiling Date
CN202210259641.3APendingCN114715231A (en)2022-03-162022-03-16Control center main-standby system for urban rail transit signal system

Country Status (1)

CountryLink
CN (1)CN114715231A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN115723818A (en)*2022-08-262023-03-03浙江中控信息产业股份有限公司Transfer station cooperative control method based on rail transit comprehensive monitoring software
CN116215618A (en)*2022-12-302023-06-06重庆市铁路(集团)有限公司 ATS master-standby switching method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101643074A (en)*2009-06-302010-02-10卡斯柯信号有限公司Hot-standby system for primary and standby control center
CN104354723A (en)*2014-10-092015-02-18青岛海信网络科技股份有限公司Integrated monitoring method and system for track traffic
CN107968843A (en)*2017-12-292018-04-27中国铁路设计集团有限公司A kind of new city Metro Network level integrates cloud platform system
CN109921949A (en)*2019-03-282019-06-21郑州轨道交通信息技术研究院A kind of implementation method of disaster recovery and backup systems redundancy scheme

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN101643074A (en)*2009-06-302010-02-10卡斯柯信号有限公司Hot-standby system for primary and standby control center
CN104354723A (en)*2014-10-092015-02-18青岛海信网络科技股份有限公司Integrated monitoring method and system for track traffic
CN107968843A (en)*2017-12-292018-04-27中国铁路设计集团有限公司A kind of new city Metro Network level integrates cloud platform system
CN109921949A (en)*2019-03-282019-06-21郑州轨道交通信息技术研究院A kind of implementation method of disaster recovery and backup systems redundancy scheme

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丰磊: "城市轨道交通LTE-M系统冗余配置研究", 《铁路通信信号工程技术》, vol. 18, no. 10, pages 66 - 70*
张赞等: "ATS系统双中心热备运行研究", 《自动化应用》, no. 6, pages 59 - 61*
韩少云: "《企业网络规划与实施》", vol. 2021, 31 December 2021, 西安电子科技大学出版社, pages: 136 - 137*

Cited By (2)

* Cited by examiner, † Cited by third party
Publication numberPriority datePublication dateAssigneeTitle
CN115723818A (en)*2022-08-262023-03-03浙江中控信息产业股份有限公司Transfer station cooperative control method based on rail transit comprehensive monitoring software
CN116215618A (en)*2022-12-302023-06-06重庆市铁路(集团)有限公司 ATS master-standby switching method and device

Similar Documents

PublicationPublication DateTitle
CN109693690B (en) Maglev operation control system
EP3244577B1 (en)Broadband communication network architecture for train control and service common network, and communication method
CN106627676B (en)A kind of dynamic allocation method of the resources control of zone controller
CN101537847B (en) Realization method of train operation control system with a speed of 200-350 kilometers per hour
WO2012155835A1 (en)Ctcs -3 train operation control system
CN112622983B (en)Re-connectable communication network architecture based on train and communication method thereof
CN114715231A (en)Control center main-standby system for urban rail transit signal system
CN114872756B (en) Fusion control system and control method applied to rail vehicles
WO2012155837A1 (en)Ctcs level 3 radio block center (rbc) device and system
CN108327747B (en)Interface method for centralized system controlled by motor train section and signal system
CN114604300A (en)FAO remote driving system based on 5G technology
CN114454916B (en)Multi-system-compatible train control vehicle-mounted equipment and control method
CN113232696A (en)Train control device and method suitable for C0/C1/C2-level line
CN101791989A (en)Traffic information network architecture system of self-controlling dispersion track
CN107364468A (en)Long-range isolation circuit, the brake fault shielding system of crewless train and method
US12195065B2 (en)Method and device for dynamically adjusting train interval based on wide-area interlocking control, and storage medium
CN118574139A (en) A controllable multi-mode communication unit device at the end of a column and a control method thereof
CN106627665A (en)Vehicle-mounted earthquake emergency disposal device of redundant GSM-R communication units
CN108725521A (en)A kind of rail traffic standby control center hot backup redundancy management system and method
CN116215618A (en) ATS master-standby switching method and device
CN208862826U (en)Vehicular communication equipment and locomotive synchronous manipulation message transfer system
CN115973222A (en)Redundancy method, device and system for train head and tail vehicle-mounted signal system device
CN207292035U (en)Long-range isolation circuit and the brake fault shielding system for crewless train
CN117465502A (en)Train control vehicle-mounted system and method compatible with CTCS and CBTC
CN214985390U (en)Train control device suitable for C0/C1/C2-level line

Legal Events

DateCodeTitleDescription
PB01Publication
PB01Publication
SE01Entry into force of request for substantive examination
SE01Entry into force of request for substantive examination
RJ01Rejection of invention patent application after publication

Application publication date:20220708

RJ01Rejection of invention patent application after publication

[8]ページ先頭

©2009-2025 Movatter.jp